Utility rate cases, without the paywall.

Free access to proceedings, case economics, and large-load tariffs.

All cases →View state coverage24 open proceedings in the current record

Open rate cases

Current requests, procedural stages, and next scheduled events.

DTE Gas

MI · U-21973

$237.46M

Testimony

Final MPSC order expected

AES Ohio

OH · 25-958-EL-AIR

Testimony

Evidentiary hearing

TNMP

TX · 58964

$33.8M

Settlement Pending

Corrections or exceptions to the proposed order due

Utility regulation by state

Commission structure, rate-setting rules, operating utilities, open cases, regional markets, and large-load policy for each covered state.

All states →
RateBase state coverage mapA map of the contiguous United States highlighting Michigan, New Jersey, Ohio, Pennsylvania, Texas, and Virginia.New JerseyPennsylvaniaTexasMichiganOhioVirginia

Select a highlighted state to explore its regulatory record

Large-load tariffs and policy by state

Qualifying demand, contract terms, minimum payments, collateral, exit protections, and approved utility tariffs.

Pennsylvania

5 utilities

Statewide model tariff

Statewide model tariff with utility-specific implementation

The PA PUC adopted a model tariff for every jurisdictional electric distribution company. It applies to new or incremental loads at or above 50 MW individually or 100 MW in aggregate. The model sets the statewide baseline, but each utility must file its own enforceable tariff and obtain Commission approval.

View PA details →

Michigan

2 utilities

Utility terms and special contracts

Consumers terms approved; DTE tariff follow-up ordered

The MPSC approved Consumers Energy terms for data centers and other very large customers, including a 100 MW threshold, 15-year contract, and 80 percent minimum billing demand. It separately approved a DTE data-center contract with safeguards and directed DTE to file a large-load tariff.

View MI details →

New Jersey

1 utility

Utility-specific tariff

Utility-specific precedent; no statewide model tariff

Rockland Electric's effective SC7 tariff includes a High Voltage Distribution option originally approved to facilitate a 25 MW data center in Mahwah. It is a utility-specific delivery rate, not a statewide large-load framework.

View NJ details →

Ohio

1 utility

Utility-specific tariff

AEP Ohio data-center tariff approved and in use

PUCO approved a settlement directing AEP Ohio to file data-center tariffs and lift its connection moratorium. AEP Ohio subsequently reported binding contracts under the tariff, confirming that the utility-specific framework is in operation.

View OH details →

Texas

1 utility

Grid interconnection rules

ERCOT interconnection rules plus Batch Zero study process

PUCT-approved ERCOT rules establish modeling and interconnection requirements for large loads, including visibility standards beginning at 25 MW. The newer Batch Zero process studies qualified projects of 75 MW or more together and is now moving through applicant classification and transmission planning.

View TX details →

Virginia

1 utility

Utility-specific tariff

Dominion GS-5 approved; effective January 1, 2027

The Virginia SCC approved Dominion Energy Virginia's GS-5 class for customers demanding 25 MW or more. Beginning January 1, 2027, covered customers face an 85 percent minimum for contracted distribution and transmission demand and a 60 percent minimum for generation demand.

View VA details →