MI · electric · U-21870

Consumers Energy — general rate case

Closed case·Complete·Authorized

Case summary

No case narrative is published.

Latest development
Final order issued

Mar 27, 2026

Next event
No scheduled event

Not scheduled

Case stage

Regulatory process

complete

  1. Filed

    Not recorded

  2. Testimony

    Not recorded

  3. Hearings

    Not recorded

  4. Briefing

    Not recorded

  5. Decision

    Mar 27, 2026

  6. Rates effective

    Current stage

State rules

Base-rate reviews and adjustment mechanisms in Michigan

This docket is a full base-rate review. Selected charges can change on separate schedules without reopening every issue in this case.

Full base-rate review

No fixed recurring interval

A utility files when it seeks a base-rate change. The MPSC's general framework does not impose a common annual or multi-year filing cycle, but it requires a final Commission decision within 10 months of the application.

Rate period: Filing-specific forecast, historical support, and standard rate-case schedules.

Governing rule ↗

Between full reviews

Power and gas supply cost recovery

Variable surcharge · annual reconciliation

PSCR and GCR surcharges recover fuel, purchased power, transmission, and gas-supply costs above the amount in base rates. Actual costs are reconciled annually after a prudence review.

Governing source ↗

Investment Recovery Mechanism

Utility- and order-specific

An approved IRM can fund specified distribution investments between general rate cases. Collections and actual spending are reconciled under the terms of the utility's Commission order.

Governing source ↗
View the full Michigan regulatory framework →

Commission decision

Economics

Utility request and Commission-authorized outcome.

MetricUtility requestAuthorized outcomeLike-for-like difference
Annual revenue increase

$436M

Annual utility request

$276.61M

Total company rate-case request or Commission-authorized outcome · Mar 27, 2026

+$159.39M

Rate base

Not available

Not captured in current case sources

Not available

Authorized value not captured

Return on equity

10.25%

Total company rate-case request or Commission-authorized outcome · Mar 27, 2026

9.9%

Total company rate-case request or Commission-authorized outcome · Mar 27, 2026

+35 bps

Common equity ratio

Not available

Not captured in current case sources

Not available

Authorized value not captured

Residential bill impact

Not available

Not captured in current case sources

Not available

Authorized value not captured

Utility context

Prior authorizations, mechanism values, actuals, and company projections are shown separately because they are not default like-for-like case comparisons.

Annual revenue change

authorized · Prior authorized observation · Mar 21, 2025

$153.81M

Common equity ratio

authorized · Common equity in the authorized ratemaking capital structure; equivalent to 50% on a financial basis. · Mar 27, 2026

42.3%

Large Load Credit Collateral

mechanism authorized · Consumers Energy Rate GPD large-load provisions · Nov 7, 2025

Default collateral equals 50% of the exit fee

Large Load Eligibility Threshold

mechanism authorized · Consumers Energy Rate GPD large-load provisions · Nov 7, 2025

100 MW individual or aggregate Aggregation includes commonly owned sites of at least 20 MW within the utility's service territory.

Large Load Exit Fee

mechanism authorized · Consumers Energy Rate GPD large-load provisions · Nov 7, 2025

Remaining minimum bill plus system access charges The tariff multiplies the applicable monthly minimum obligations by the months remaining in the contract term.

Large Load Generation Resource Costs

mechanism authorized · Consumers Energy Rate GPD large-load provisions · Nov 7, 2025

Not identified in reviewed Consumers Energy sources

Large Load Infrastructure Cost Responsibility

mechanism authorized · Consumers Energy Rate GPD large-load provisions · Nov 7, 2025

$100,000 study fee reconciled to actual cost Each new large-load customer also requires a Commission filing to demonstrate that customer-caused costs are appropriately assigned.

Large Load Minimum Contract Term

mechanism authorized · Consumers Energy Rate GPD large-load provisions · Nov 7, 2025

15 years

Large Load Minimum Payment

mechanism authorized · Consumers Energy Rate GPD large-load provisions · Nov 7, 2025

80% of contracted demand

Rate base

authorized · Electric generation and distribution; excludes approximately $2.1 billion of RPS renewables. · Mar 27, 2026

$16,110M

Return on equity

authorized · Electric generation and distribution base rates. · Mar 27, 2026

9.9%

Full docket record

1 event · 1 document · 1 citation

View record
Last updated
Jul 20, 2026
Docket reviewed
Jul 20, 2026
Economics reviewed
Jul 20, 2026
Official documents
1
Evidence citations
1

Docket history

Material filings, hearings, orders, and effective dates.

  1. Mar 27, 2026

    Final order issued

    official commission · completed

Documents

Docket and evidence documents linked to this proceeding.

MPSC Consumers Energy order summary

evidence · primary · Mar 27, 2026

Open document ↗

Citations

Field-level excerpts and review metadata supporting material facts.

MPSC Consumers Energy order summary

commission order · Mar 27, 2026

Raw observations

Stage-preserving economics and party positions as published in the canonical record.

MetricStagePartyPeriodValueEvidence
Annual revenue changeauthorizedparty-commission$276.61M
Annual revenue changeutility requestConsumers Energy Company$436M
Return on equityauthorizedparty-commission9.9%