Alliant data-center service agreement and ordered tariff
large load tariffWI · 6680-TE-115
| Operating utility | Regulator | Rate base | Authorized ROE | Authorized equity ratio | Open matters |
|---|---|---|---|---|---|
| Alliant Energy — Wisconsin WI · electric, gas | Not available | Not available | Not available | 1 |
No open rate cases.
WI · 6680-TE-115
No linked decisions.
Across operating utilities
Case values remain separate by utility and docket; they are not summed across test periods.
No revenue observations are linked.
Most recent ROE and rate-base observations by operating utility.
| Utility | Metric | Position | As of | Value |
|---|---|---|---|---|
| Alliant Energy — Wisconsin | Rate base | authorized | Jul 21, 2026 | Not available |
| Alliant Energy — Wisconsin | Return on equity | authorized | Jul 21, 2026 | Not available |
| Alliant Energy — Wisconsin | Rate base | authorized | Jul 21, 2026 | Not available |
| Alliant Energy — Wisconsin | Return on equity | authorized | Jul 21, 2026 | Not available |
No published large-load tariff is linked to this parent portfolio.
Open large load →