Large-load customers are expected to fund customer-caused infrastructure and provide financial security; docket E-00000A-25-0069 remains under development.

Current position

Arizona is reviewing statewide consistency while APS, TEP, and other providers use utility-specific extra-high-load tariffs and negotiated agreements.

Actions
2
Published tariffs
0
Legislation
0
Status
Adopted + under review

Regulatory and utility record

Tariffs, contracts, and proceedings

Each record is shown on its own terms. A utility-specific tariff or contract does not automatically apply to every large customer in the state.

Arizona Public Service · In progress

Arizona large-load and data-center policy

The ACC is reviewing definitions, tariffs, agreements, cost responsibility, and interconnection policy for large loads.

Open proceeding

Why it matters

Current protections are utility-specific; the statewide policy docket remains open.

The current official record establishes the proceeding but does not yet publish normalized customer terms.

Arizona Public Service · Effective

APS Extra High Load Factor tariff

APS's current Extra High Load Factor schedule sets eligibility, contract, minimum-billing, facilities, and optional load-control terms for qualifying high-load-factor customers.

Open proceeding

Why it matters

The tariff is effective; APS has separately proposed revisions in its pending 2025 rate case, so the current and proposed terms must not be conflated.

Enforceable terms

Key requirements

Eligibility threshold

5 MW and 92% load factor

The customer must reach at least 5 MW and maintain a 92% load factor in at least nine of the prior twelve months; specified economic-development options begin at 15 MW.

Minimum payment

Greater of tariff charges or the contract minimum

Billing demand is no lower than the minimum load stated in the electric service agreement.

Minimum contract term

Contract-specific electric service agreement

The schedule requires an agreement stating contract length, minimum and maximum load, facilities, maintenance, and special charges rather than one public term for every customer.

Service structure
Extra High Load Factor retail scheduleEffectiveThe current tariff is a high-load-factor service schedule, not a statewide data-center mandate.
Charges and assessments
Voltage-specific demand and energy charges plus applicable ridersEffectiveThe published schedule applies rate components by service voltage and retains the otherwise applicable adjustment riders.
Credit and collateral
Contract-specific security and contribution obligationsEffectiveThe service agreement and facilities arrangement establish the customer's payment and security obligations; the public schedule does not state one universal collateral percentage.
Grid infrastructure
Customer-funded extra-high-voltage facilitiesEffectiveQualifying customers may use contribution-in-aid-of-construction arrangements and bear maintenance and replacement obligations specified in the agreement; APS may finance eligible contributions for up to ten years.
Capacity protection
Controllable-load credit may applyEffectiveA qualifying customer may receive a capacity credit when APS can control the load under the tariff conditions.

Official sources supporting these requirements

“Not specified” means the current official tariff record does not establish a normalized term. Retail tariff requirements are not inferred from wholesale-grid rules, interconnection processes, or pending policy proceedings.