  "schema_version": "1.1.0",
  "records": [
    {
      "state": "AZ",
      "id": "large-load-term-action-az-aps-xhlf-decision-79293-capacity_protection",
      "term_key": "capacity_protection",
      "label": "Capacity protection",
      "category": "large_load",
      "proceeding_id": "action-az-aps-xhlf-decision-79293",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "Controllable-load credit may apply",
      "boolean_value": null,
      "unit": null,
      "qualifier": "A qualifying customer may receive a capacity credit when APS can control the load under the tariff conditions.",
      "valid_from": "2024-03-08",
      "valid_to": null,
      "citation_id": "citation-az-aps-xhlf-current",
      "source_url": "https://www.aps.com/-/media/APS/APSCOM-PDFs/Utility/Regulatory-and-Legal/Regulatory-Plan-Details-Tariffs/Business/Business-NonResidential-Plans/ExtraHighLoadFactor.ashx"
    },
    {
      "state": "AZ",
      "id": "large-load-term-action-az-aps-xhlf-decision-79293-charges_and_assessments",
      "term_key": "charges_and_assessments",
      "label": "Charges and assessments",
      "category": "large_load",
      "proceeding_id": "action-az-aps-xhlf-decision-79293",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "Voltage-specific demand and energy charges plus applicable riders",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The published schedule applies rate components by service voltage and retains the otherwise applicable adjustment riders.",
      "valid_from": "2024-03-08",
      "valid_to": null,
      "citation_id": "citation-az-aps-xhlf-current",
      "source_url": "https://www.aps.com/-/media/APS/APSCOM-PDFs/Utility/Regulatory-and-Legal/Regulatory-Plan-Details-Tariffs/Business/Business-NonResidential-Plans/ExtraHighLoadFactor.ashx"
    },
    {
      "state": "AZ",
      "id": "large-load-term-action-az-aps-xhlf-decision-79293-credit_collateral",
      "term_key": "credit_collateral",
      "label": "Large Load Credit Collateral",
      "category": "large_load",
      "proceeding_id": "action-az-aps-xhlf-decision-79293",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "Contract-specific security and contribution obligations",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The service agreement and facilities arrangement establish the customer's payment and security obligations; the public schedule does not state one universal collateral percentage.",
      "valid_from": "2024-03-08",
      "valid_to": null,
      "citation_id": "citation-az-aps-xhlf-current",
      "source_url": "https://www.aps.com/-/media/APS/APSCOM-PDFs/Utility/Regulatory-and-Legal/Regulatory-Plan-Details-Tariffs/Business/Business-NonResidential-Plans/ExtraHighLoadFactor.ashx"
    },
    {
      "state": "AZ",
      "id": "large-load-term-action-az-aps-xhlf-decision-79293-eligibility_threshold",
      "term_key": "eligibility_threshold",
      "label": "Large Load Eligibility Threshold",
      "category": "large_load",
      "proceeding_id": "action-az-aps-xhlf-decision-79293",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "5 MW and 92% load factor",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The customer must reach at least 5 MW and maintain a 92% load factor in at least nine of the prior twelve months; specified economic-development options begin at 15 MW.",
      "valid_from": "2024-03-08",
      "valid_to": null,
      "citation_id": "citation-az-aps-xhlf-current",
      "source_url": "https://www.aps.com/-/media/APS/APSCOM-PDFs/Utility/Regulatory-and-Legal/Regulatory-Plan-Details-Tariffs/Business/Business-NonResidential-Plans/ExtraHighLoadFactor.ashx"
    },
    {
      "state": "AZ",
      "id": "large-load-term-action-az-aps-xhlf-decision-79293-infrastructure_cost_responsibility",
      "term_key": "infrastructure_cost_responsibility",
      "label": "Large Load Infrastructure Cost Responsibility",
      "category": "large_load",
      "proceeding_id": "action-az-aps-xhlf-decision-79293",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "Customer-funded extra-high-voltage facilities",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Qualifying customers may use contribution-in-aid-of-construction arrangements and bear maintenance and replacement obligations specified in the agreement; APS may finance eligible contributions for up to ten years.",
      "valid_from": "2024-03-08",
      "valid_to": null,
      "citation_id": "citation-az-aps-xhlf-current",
      "source_url": "https://www.aps.com/-/media/APS/APSCOM-PDFs/Utility/Regulatory-and-Legal/Regulatory-Plan-Details-Tariffs/Business/Business-NonResidential-Plans/ExtraHighLoadFactor.ashx"
    },
    {
      "state": "AZ",
      "id": "large-load-term-action-az-aps-xhlf-decision-79293-minimum_contract_term",
      "term_key": "minimum_contract_term",
      "label": "Large Load Minimum Contract Term",
      "category": "large_load",
      "proceeding_id": "action-az-aps-xhlf-decision-79293",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "Contract-specific electric service agreement",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The schedule requires an agreement stating contract length, minimum and maximum load, facilities, maintenance, and special charges rather than one public term for every customer.",
      "valid_from": "2024-03-08",
      "valid_to": null,
      "citation_id": "citation-az-aps-xhlf-current",
      "source_url": "https://www.aps.com/-/media/APS/APSCOM-PDFs/Utility/Regulatory-and-Legal/Regulatory-Plan-Details-Tariffs/Business/Business-NonResidential-Plans/ExtraHighLoadFactor.ashx"
    },
    {
      "state": "AZ",
      "id": "large-load-term-action-az-aps-xhlf-decision-79293-minimum_payment",
      "term_key": "minimum_payment",
      "label": "Large Load Minimum Payment",
      "category": "large_load",
      "proceeding_id": "action-az-aps-xhlf-decision-79293",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "Greater of tariff charges or the contract minimum",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Billing demand is no lower than the minimum load stated in the electric service agreement.",
      "valid_from": "2024-03-08",
      "valid_to": null,
      "citation_id": "citation-az-aps-xhlf-current",
      "source_url": "https://www.aps.com/-/media/APS/APSCOM-PDFs/Utility/Regulatory-and-Legal/Regulatory-Plan-Details-Tariffs/Business/Business-NonResidential-Plans/ExtraHighLoadFactor.ashx"
    },
    {
      "state": "AZ",
      "id": "large-load-term-action-az-aps-xhlf-decision-79293-service_structure",
      "term_key": "service_structure",
      "label": "Service structure",
      "category": "large_load",
      "proceeding_id": "action-az-aps-xhlf-decision-79293",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "Extra High Load Factor retail schedule",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The current tariff is a high-load-factor service schedule, not a statewide data-center mandate.",
      "valid_from": "2024-03-08",
      "valid_to": null,
      "citation_id": "citation-az-aps-xhlf-current",
      "source_url": "https://www.aps.com/-/media/APS/APSCOM-PDFs/Utility/Regulatory-and-Legal/Regulatory-Plan-Details-Tariffs/Business/Business-NonResidential-Plans/ExtraHighLoadFactor.ashx"
    },
    {
      "state": "AZ",
      "id": "large-load-term-policy-az-large-load-e-00000a-25-0069-coverage",
      "term_key": "coverage_status",
      "label": "Large Load Coverage Status",
      "category": "large_load",
      "proceeding_id": "policy-az-large-load-e-00000a-25-0069",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "pending",
      "numeric_value": null,
      "text_value": "Policy or tariff proceeding pending",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Current protections are utility-specific; the statewide policy docket remains open.",
      "valid_from": "2025-01-01",
      "valid_to": null,
      "citation_id": "citation-az-large-load",
      "source_url": "https://azcc.gov/news/home/2026/04/20/acc-large-load-data-center-workshop-highlights"
    },
    {
      "state": "FL",
      "id": "large-load-term-action-fl-def-20260064-credit_collateral",
      "term_key": "credit_collateral",
      "label": "Large Load Credit Collateral",
      "category": "large_load",
      "proceeding_id": "action-fl-def-20260064",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "proposed",
      "numeric_value": null,
      "text_value": "Letter of credit, cash, or parent guaranty",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Security is risk-based; a letter-of-credit issuer must meet A-/A3 standards, and at least 10% security applies when the relevant obligation exceeds $100 million.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "citation-fl-duke-large-load",
      "source_url": "https://www.floridapsc.com/pscfiles/library/filings/2026/02327-2026/02327-2026.pdf"
    },
    {
      "state": "FL",
      "id": "large-load-term-action-fl-def-20260064-eligibility_threshold",
      "term_key": "eligibility_threshold",
      "label": "Large Load Eligibility Threshold",
      "category": "large_load",
      "proceeding_id": "action-fl-def-20260064",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "proposed",
      "numeric_value": null,
      "text_value": "50 MW firm load",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The April 2026 petition proposes coverage when firm load reaches 50 MW at any time during the contract term.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "citation-fl-duke-large-load",
      "source_url": "https://www.floridapsc.com/pscfiles/library/filings/2026/02327-2026/02327-2026.pdf"
    },
    {
      "state": "FL",
      "id": "large-load-term-action-fl-def-20260064-exit_fee",
      "term_key": "exit_fee",
      "label": "Large Load Exit Fee",
      "category": "large_load",
      "proceeding_id": "action-fl-def-20260064",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "proposed",
      "numeric_value": null,
      "text_value": "Two-year notice plus make-whole obligations",
      "boolean_value": null,
      "unit": null,
      "qualifier": "After service begins, termination exposure includes three years of minimum monthly bills and the net book value of customer-specific facilities, adjusted for refundable contributions.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "citation-fl-duke-large-load",
      "source_url": "https://www.floridapsc.com/pscfiles/library/filings/2026/02327-2026/02327-2026.pdf"
    },
    {
      "state": "FL",
      "id": "large-load-term-action-fl-def-20260064-infrastructure_cost_responsibility",
      "term_key": "infrastructure_cost_responsibility",
      "label": "Large Load Infrastructure Cost Responsibility",
      "category": "large_load",
      "proceeding_id": "action-fl-def-20260064",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "proposed",
      "numeric_value": null,
      "text_value": "Full CIAC paid before construction",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The proposal requires upfront customer funding of customer-caused facilities, refundable over up to five years based on base revenues.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "citation-fl-duke-large-load",
      "source_url": "https://www.floridapsc.com/pscfiles/library/filings/2026/02327-2026/02327-2026.pdf"
    },
    {
      "state": "FL",
      "id": "large-load-term-action-fl-def-20260064-minimum_contract_term",
      "term_key": "minimum_contract_term",
      "label": "Large Load Minimum Contract Term",
      "category": "large_load",
      "proceeding_id": "action-fl-def-20260064",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "proposed",
      "numeric_value": null,
      "text_value": "20 years",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The proposed initial contract term is twenty years, with the customer-specific ramp schedule documented in the agreement.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "citation-fl-duke-large-load",
      "source_url": "https://www.floridapsc.com/pscfiles/library/filings/2026/02327-2026/02327-2026.pdf"
    },
    {
      "state": "FL",
      "id": "large-load-term-action-fl-def-20260064-minimum_payment",
      "term_key": "minimum_payment",
      "label": "Large Load Minimum Payment",
      "category": "large_load",
      "proceeding_id": "action-fl-def-20260064",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "proposed",
      "numeric_value": null,
      "text_value": "75%–85% of contract demand plus a 60% load-factor floor",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The proposed LLCA combines a take-or-pay demand percentage with a minimum billing-energy volume.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "citation-fl-duke-large-load",
      "source_url": "https://www.floridapsc.com/pscfiles/library/filings/2026/02327-2026/02327-2026.pdf"
    },
    {
      "state": "FL",
      "id": "large-load-term-action-fl-def-20260064-reporting_and_true_up",
      "term_key": "reporting_and_true_up",
      "label": "Reporting and true-up",
      "category": "large_load",
      "proceeding_id": "action-fl-def-20260064",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "proposed",
      "numeric_value": null,
      "text_value": "Security, cost, and CIAC obligations reconcile to actual exposure",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The agreement updates the security percentage and refundable contribution as project risk and delivered revenues change.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "citation-fl-duke-large-load",
      "source_url": "https://www.floridapsc.com/pscfiles/library/filings/2026/02327-2026/02327-2026.pdf"
    },
    {
      "state": "FL",
      "id": "large-load-term-action-fl-def-20260064-service_structure",
      "term_key": "service_structure",
      "label": "Service structure",
      "category": "large_load",
      "proceeding_id": "action-fl-def-20260064",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "proposed",
      "numeric_value": null,
      "text_value": "Existing general-service rate plus mandatory LLCP and LLCA",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Large-load customers would remain on GSD-1 or GSDT-1 until a dedicated rate is considered in Duke's next rate case.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "citation-fl-duke-large-load",
      "source_url": "https://www.floridapsc.com/pscfiles/library/filings/2026/02327-2026/02327-2026.pdf"
    },
    {
      "state": "GA",
      "id": "large-load-ga-gpc-coverage",
      "term_key": "coverage_status",
      "label": "Large Load Coverage Status",
      "category": "large_load",
      "proceeding_id": null,
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": "uj-ga-georgia-power-electric",
      "status": "reported",
      "numeric_value": null,
      "text_value": "utility_specific_rules_effective",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Georgia Power customers at 100 MW or more",
      "valid_from": "2025-02-01",
      "valid_to": null,
      "citation_id": "citation-ga-large-load-order",
      "source_url": "https://services.psc.ga.gov/api/v1/External/Public/Get/Document/DownloadFile/221165/102362"
    },
    {
      "state": "GA",
      "id": "large-load-ga-gpc-summary",
      "term_key": "coverage_summary",
      "label": "Large Load Coverage Summary",
      "category": "large_load",
      "proceeding_id": null,
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": "uj-ga-georgia-power-electric",
      "status": "reported",
      "numeric_value": null,
      "text_value": "Georgia Power may require minimum billing and longer contract terms for new loads at or above 100 MW. Exact terms remain customer-specific and contracts are filed with Commission Staff.",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Effective utility rules; not a statewide tariff",
      "valid_from": "2025-02-01",
      "valid_to": null,
      "citation_id": "citation-ga-large-load-order",
      "source_url": "https://services.psc.ga.gov/api/v1/External/Public/Get/Document/DownloadFile/221165/102362"
    },
    {
      "state": "GA",
      "id": "large-load-ga-gpc-threshold",
      "term_key": "eligibility_threshold",
      "label": "Large Load Eligibility Threshold",
      "category": "large_load",
      "proceeding_id": null,
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": "uj-ga-georgia-power-electric",
      "status": "required",
      "numeric_value": null,
      "text_value": "100 MW expected peak demand",
      "boolean_value": null,
      "unit": null,
      "qualifier": "One or more premises on one or contiguous tracts",
      "valid_from": "2025-02-01",
      "valid_to": null,
      "citation_id": "citation-ga-large-load-tariff",
      "source_url": "https://services.psc.ga.gov/api/v1/External/Public/Get/Document/DownloadFile/220667/101841"
    },
    {
      "state": "GA",
      "id": "large-load-term-case-ga-gpc-44280-credit_collateral",
      "term_key": "credit_collateral",
      "label": "Large Load Credit Collateral",
      "category": "large_load",
      "proceeding_id": "case-ga-gpc-44280",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "Performance and credit support as Georgia Power deems appropriate",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The exact security is established in the customer contract rather than as one statewide percentage.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "citation-ga-large-load-tariff",
      "source_url": "https://services.psc.ga.gov/api/v1/External/Public/Get/Document/DownloadFile/220667/101841"
    },
    {
      "state": "GA",
      "id": "large-load-term-case-ga-gpc-44280-eligibility_threshold",
      "term_key": "eligibility_threshold",
      "label": "Large Load Eligibility Threshold",
      "category": "large_load",
      "proceeding_id": "case-ga-gpc-44280",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "100 MW expected peak demand",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Coverage may aggregate premises on one tract or contiguous tracts.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "citation-ga-large-load-tariff",
      "source_url": "https://services.psc.ga.gov/api/v1/External/Public/Get/Document/DownloadFile/220667/101841"
    },
    {
      "state": "GA",
      "id": "large-load-term-case-ga-gpc-44280-exit_fee",
      "term_key": "exit_fee",
      "label": "Large Load Exit Fee",
      "category": "large_load",
      "proceeding_id": "case-ga-gpc-44280",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "All unrecovered distribution, transmission, and generation costs",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Early termination can trigger a make-whole charge for the remaining customer-caused investment and commitments.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "citation-ga-large-load-tariff",
      "source_url": "https://services.psc.ga.gov/api/v1/External/Public/Get/Document/DownloadFile/220667/101841"
    },
    {
      "state": "GA",
      "id": "large-load-term-case-ga-gpc-44280-generation_resource_costs",
      "term_key": "generation_resource_costs",
      "label": "Large Load Generation Resource Costs",
      "category": "large_load",
      "proceeding_id": "case-ga-gpc-44280",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "Customer-specific generation and transmission commitments",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The contract may allocate the costs of resources and network commitments procured for the new load.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "citation-ga-large-load-tariff",
      "source_url": "https://services.psc.ga.gov/api/v1/External/Public/Get/Document/DownloadFile/220667/101841"
    },
    {
      "state": "GA",
      "id": "large-load-term-case-ga-gpc-44280-infrastructure_cost_responsibility",
      "term_key": "infrastructure_cost_responsibility",
      "label": "Large Load Infrastructure Cost Responsibility",
      "category": "large_load",
      "proceeding_id": "case-ga-gpc-44280",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "CIAC or upfront payment for local facilities",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Site and local facilities may require contributions before construction; upstream system costs can also be directly assigned.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "citation-ga-large-load-tariff",
      "source_url": "https://services.psc.ga.gov/api/v1/External/Public/Get/Document/DownloadFile/220667/101841"
    },
    {
      "state": "GA",
      "id": "large-load-term-case-ga-gpc-44280-minimum_contract_term",
      "term_key": "minimum_contract_term",
      "label": "Large Load Minimum Contract Term",
      "category": "large_load",
      "proceeding_id": "case-ga-gpc-44280",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "Customer-specific extended term",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The service contract may extend beyond the otherwise applicable schedule so Georgia Power can recover customer-caused costs.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "citation-ga-large-load-tariff",
      "source_url": "https://services.psc.ga.gov/api/v1/External/Public/Get/Document/DownloadFile/220667/101841"
    },
    {
      "state": "GA",
      "id": "large-load-term-case-ga-gpc-44280-minimum_payment",
      "term_key": "minimum_payment",
      "label": "Large Load Minimum Payment",
      "category": "large_load",
      "proceeding_id": "case-ga-gpc-44280",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "Customer-specific minimum billing",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The filed rules authorize minimum-billing obligations sized to the facilities and power-supply commitments required for the customer.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "citation-ga-large-load-tariff",
      "source_url": "https://services.psc.ga.gov/api/v1/External/Public/Get/Document/DownloadFile/220667/101841"
    },
    {
      "state": "GA",
      "id": "large-load-term-case-ga-gpc-44280-service_structure",
      "term_key": "service_structure",
      "label": "Service structure",
      "category": "large_load",
      "proceeding_id": "case-ga-gpc-44280",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "Special-contract overlay to the applicable retail schedule",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The Commission-approved framework preserves customer-specific contracts while requiring filing and regulatory oversight.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "citation-ga-large-load-tariff",
      "source_url": "https://services.psc.ga.gov/api/v1/External/Public/Get/Document/DownloadFile/220667/101841"
    },
    {
      "state": "IL",
      "id": "large-load-term-action-il-comed-25-0679-large-load-charges_and_assessments",
      "term_key": "charges_and_assessments",
      "label": "Charges and assessments",
      "category": "large_load",
      "proceeding_id": "action-il-comed-25-0679-large-load",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized_under_review",
      "numeric_value": null,
      "text_value": "Customer-specific engineering and facilities deposits",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Rider DE refunds qualifying deposits over as many as ten years based on actual load and revenues.",
      "valid_from": "2026-03-19",
      "valid_to": null,
      "citation_id": "citation-il-comed-25-0679-final-order",
      "source_url": "https://icc.illinois.gov/docket/P2025-0679/documents/365561/files/636612.pdf"
    },
    {
      "state": "IL",
      "id": "large-load-term-action-il-comed-25-0679-large-load-credit_collateral",
      "term_key": "credit_collateral",
      "label": "Large Load Credit Collateral",
      "category": "large_load",
      "proceeding_id": "action-il-comed-25-0679-large-load",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized_under_review",
      "numeric_value": null,
      "text_value": "A-/A3 letter-of-credit standard",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The order requires acceptable bank credit support for applicable deposits; surety bonds were not accepted as a substitute.",
      "valid_from": "2026-03-19",
      "valid_to": null,
      "citation_id": "citation-il-comed-25-0679-final-order",
      "source_url": "https://icc.illinois.gov/docket/P2025-0679/documents/365561/files/636612.pdf"
    },
    {
      "state": "IL",
      "id": "large-load-term-action-il-comed-25-0679-large-load-eligibility_threshold",
      "term_key": "eligibility_threshold",
      "label": "Large Load Eligibility Threshold",
      "category": "large_load",
      "proceeding_id": "action-il-comed-25-0679-large-load",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized_under_review",
      "numeric_value": null,
      "text_value": "50 MW within ten years",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The LDPAC process applies when projected peak load reaches 50 MW at any point in the submitted ten-year ramp.",
      "valid_from": "2026-03-19",
      "valid_to": null,
      "citation_id": "citation-il-comed-25-0679-final-order",
      "source_url": "https://icc.illinois.gov/docket/P2025-0679/documents/365561/files/636612.pdf"
    },
    {
      "state": "IL",
      "id": "large-load-term-action-il-comed-25-0679-large-load-infrastructure_cost_responsibility",
      "term_key": "infrastructure_cost_responsibility",
      "label": "Large Load Infrastructure Cost Responsibility",
      "category": "large_load",
      "proceeding_id": "action-il-comed-25-0679-large-load",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized_under_review",
      "numeric_value": null,
      "text_value": "$1 million plus $500,000 per whole 100 MW above 200 MW",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The engineering deposit funds planning and study work, with actual costs retained and the balance refunded or applied; long-lead materials require additional security.",
      "valid_from": "2026-03-19",
      "valid_to": null,
      "citation_id": "citation-il-comed-25-0679-final-order",
      "source_url": "https://icc.illinois.gov/docket/P2025-0679/documents/365561/files/636612.pdf"
    },
    {
      "state": "IL",
      "id": "large-load-term-action-il-comed-25-0679-large-load-minimum_contract_term",
      "term_key": "minimum_contract_term",
      "label": "Large Load Minimum Contract Term",
      "category": "large_load",
      "proceeding_id": "action-il-comed-25-0679-large-load",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized_under_review",
      "numeric_value": null,
      "text_value": "Ten-year transmission service agreement",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Retail service depends on an effective FERC-filed and approved transmission service agreement covering the guarantee period.",
      "valid_from": "2026-03-19",
      "valid_to": null,
      "citation_id": "citation-il-comed-25-0679-final-order",
      "source_url": "https://icc.illinois.gov/docket/P2025-0679/documents/365561/files/636612.pdf"
    },
    {
      "state": "IL",
      "id": "large-load-term-action-il-comed-25-0679-large-load-minimum_payment",
      "term_key": "minimum_payment",
      "label": "Large Load Minimum Payment",
      "category": "large_load",
      "proceeding_id": "action-il-comed-25-0679-large-load",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized_under_review",
      "numeric_value": null,
      "text_value": "Ten-year transmission payment guarantee",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The customer guarantees the annual transmission payments associated with its submitted ramp and pays any shortfall.",
      "valid_from": "2026-03-19",
      "valid_to": null,
      "citation_id": "citation-il-comed-25-0679-final-order",
      "source_url": "https://icc.illinois.gov/docket/P2025-0679/documents/365561/files/636612.pdf"
    },
    {
      "state": "IL",
      "id": "large-load-term-action-il-comed-25-0679-large-load-reporting_and_true_up",
      "term_key": "reporting_and_true_up",
      "label": "Reporting and true-up",
      "category": "large_load",
      "proceeding_id": "action-il-comed-25-0679-large-load",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized_under_review",
      "numeric_value": null,
      "text_value": "Annual compliance filing",
      "boolean_value": null,
      "unit": null,
      "qualifier": "ComEd must report large-load activity and implementation, alongside Commission workshops and a follow-up report.",
      "valid_from": "2026-03-19",
      "valid_to": null,
      "citation_id": "citation-il-comed-25-0679-final-order",
      "source_url": "https://icc.illinois.gov/docket/P2025-0679/documents/365561/files/636612.pdf"
    },
    {
      "state": "IL",
      "id": "large-load-term-action-il-comed-25-0679-large-load-service_structure",
      "term_key": "service_structure",
      "label": "Service structure",
      "category": "large_load",
      "proceeding_id": "action-il-comed-25-0679-large-load",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized_under_review",
      "numeric_value": null,
      "text_value": "Distribution-extension tariff plus FERC transmission agreement",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The state tariff governs planning and distribution security while the transmission payment obligation sits in a federal agreement.",
      "valid_from": "2026-03-19",
      "valid_to": null,
      "citation_id": "citation-il-comed-25-0679-final-order",
      "source_url": "https://icc.illinois.gov/docket/P2025-0679/documents/365561/files/636612.pdf"
    },
    {
      "state": "LA",
      "id": "large-load-term-policy-la-large-load-r-37905-coverage",
      "term_key": "coverage_status",
      "label": "Large Load Coverage Status",
      "category": "large_load",
      "proceeding_id": "policy-la-large-load-r-37905",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "pending",
      "numeric_value": null,
      "text_value": "Policy or tariff proceeding pending",
      "boolean_value": null,
      "unit": null,
      "qualifier": "This is an active policy proceeding; it does not yet establish one approved statewide large-load tariff.",
      "valid_from": "2026-01-01",
      "valid_to": null,
      "citation_id": "citation-la-large-load",
      "source_url": "https://lpsc.louisiana.gov/"
    },
    {
      "state": "LA",
      "id": "large-load-term-policy-la-large-load-r-37905-credit_collateral",
      "term_key": "credit_collateral",
      "label": "Large Load Credit Collateral",
      "category": "large_load",
      "proceeding_id": "policy-la-large-load-r-37905",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "pending",
      "numeric_value": null,
      "text_value": "No enforceable statewide standard adopted",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Credit support remains a policy issue until the Commission approves binding tariff or rule language.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "citation-la-large-load",
      "source_url": "https://lpsc.louisiana.gov/"
    },
    {
      "state": "LA",
      "id": "large-load-term-policy-la-large-load-r-37905-infrastructure_cost_responsibility",
      "term_key": "infrastructure_cost_responsibility",
      "label": "Large Load Infrastructure Cost Responsibility",
      "category": "large_load",
      "proceeding_id": "policy-la-large-load-r-37905",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "pending",
      "numeric_value": null,
      "text_value": "Cost assignment under review",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The Commission is considering how private-use networks and utility facilities for new large loads should allocate costs.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "citation-la-large-load",
      "source_url": "https://lpsc.louisiana.gov/"
    },
    {
      "state": "LA",
      "id": "large-load-term-policy-la-large-load-r-37905-reporting_and_true_up",
      "term_key": "reporting_and_true_up",
      "label": "Reporting and true-up",
      "category": "large_load",
      "proceeding_id": "policy-la-large-load-r-37905",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "pending",
      "numeric_value": null,
      "text_value": "Comments and guidelines remain nonbinding",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The related large-load-guidelines repository informs the docket but does not create an enforceable customer obligation.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "citation-la-large-load",
      "source_url": "https://lpsc.louisiana.gov/"
    },
    {
      "state": "LA",
      "id": "large-load-term-policy-la-large-load-r-37905-service_structure",
      "term_key": "service_structure",
      "label": "Service structure",
      "category": "large_load",
      "proceeding_id": "policy-la-large-load-r-37905",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "pending",
      "numeric_value": null,
      "text_value": "Private-use network and large-load framework under review",
      "boolean_value": null,
      "unit": null,
      "qualifier": "R-37905 is a rulemaking; it does not itself create an effective retail tariff.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "citation-la-large-load",
      "source_url": "https://lpsc.louisiana.gov/"
    },
    {
      "state": "MI",
      "id": "large-load-term-action-mi-consumers-large-load-terms-capacity_protection",
      "term_key": "capacity_protection",
      "label": "Capacity protection",
      "category": "large_load",
      "proceeding_id": "action-mi-consumers-large-load-terms",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "Up to five-year ramp; automatic five-year extensions",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The initial 15-year term accommodates a customer ramp and continues in five-year extensions unless the customer provides four years' termination notice.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "source-market-mi-consumers-u21859",
      "source_url": "https://www.michigan.gov/mpsc/commission/news-releases/2025/11/06/mpsc-approves-terms-of-service-between-consumers-energy-and-data-centers"
    },
    {
      "state": "MI",
      "id": "large-load-term-action-mi-consumers-large-load-terms-charges_and_assessments",
      "term_key": "charges_and_assessments",
      "label": "Charges and assessments",
      "category": "large_load",
      "proceeding_id": "action-mi-consumers-large-load-terms",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "$100,000 study fee reconciled to actual cost",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The administrative and engineering charge is trued up rather than retained as a flat fee regardless of work performed.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "source-market-mi-consumers-u21859",
      "source_url": "https://www.michigan.gov/mpsc/commission/news-releases/2025/11/06/mpsc-approves-terms-of-service-between-consumers-energy-and-data-centers"
    },
    {
      "state": "MI",
      "id": "observation-action-mi-consumers-large-load-terms-credit_collateral",
      "term_key": "credit_collateral",
      "label": "Large Load Credit Collateral",
      "category": "large_load",
      "proceeding_id": "action-mi-consumers-large-load-terms",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "Default collateral equals 50% of the exit fee",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Consumers Energy Rate GPD large-load provisions",
      "valid_from": "2025-11-07",
      "valid_to": null,
      "citation_id": "source-market-mi-consumers-annual-report",
      "source_url": "https://www.michigan.gov/mpsc/-/media/Project/Websites/mpsc/regulatory/reports/annual/MPSC_2025_Annual_Report.pdf"
    },
    {
      "state": "MI",
      "id": "observation-action-mi-consumers-large-load-terms-eligibility_threshold",
      "term_key": "eligibility_threshold",
      "label": "Large Load Eligibility Threshold",
      "category": "large_load",
      "proceeding_id": "action-mi-consumers-large-load-terms",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "100 MW individual or aggregate\n\nAggregation includes commonly owned sites of at least 20 MW within the utility's service territory.",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Consumers Energy Rate GPD large-load provisions",
      "valid_from": "2025-11-07",
      "valid_to": null,
      "citation_id": "source-market-mi-consumers-u21859",
      "source_url": "https://www.michigan.gov/mpsc/commission/news-releases/2025/11/06/mpsc-approves-terms-of-service-between-consumers-energy-and-data-centers"
    },
    {
      "state": "MI",
      "id": "observation-action-mi-consumers-large-load-terms-exit_fee",
      "term_key": "exit_fee",
      "label": "Large Load Exit Fee",
      "category": "large_load",
      "proceeding_id": "action-mi-consumers-large-load-terms",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "Remaining minimum bill plus system access charges\n\nThe tariff multiplies the applicable monthly minimum obligations by the months remaining in the contract term.",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Consumers Energy Rate GPD large-load provisions",
      "valid_from": "2025-11-07",
      "valid_to": null,
      "citation_id": "source-market-mi-consumers-annual-report",
      "source_url": "https://www.michigan.gov/mpsc/-/media/Project/Websites/mpsc/regulatory/reports/annual/MPSC_2025_Annual_Report.pdf"
    },
    {
      "state": "MI",
      "id": "observation-action-mi-consumers-large-load-terms-generation_resource_costs",
      "term_key": "generation_resource_costs",
      "label": "Large Load Generation Resource Costs",
      "category": "large_load",
      "proceeding_id": "action-mi-consumers-large-load-terms",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "Not identified in reviewed Consumers Energy sources",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Consumers Energy Rate GPD large-load provisions",
      "valid_from": "2025-11-07",
      "valid_to": null,
      "citation_id": "source-market-mi-consumers-annual-report",
      "source_url": "https://www.michigan.gov/mpsc/-/media/Project/Websites/mpsc/regulatory/reports/annual/MPSC_2025_Annual_Report.pdf"
    },
    {
      "state": "MI",
      "id": "observation-action-mi-consumers-large-load-terms-infrastructure_cost_responsibility",
      "term_key": "infrastructure_cost_responsibility",
      "label": "Large Load Infrastructure Cost Responsibility",
      "category": "large_load",
      "proceeding_id": "action-mi-consumers-large-load-terms",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "$100,000 study fee reconciled to actual cost\n\nEach new large-load customer also requires a Commission filing to demonstrate that customer-caused costs are appropriately assigned.",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Consumers Energy Rate GPD large-load provisions",
      "valid_from": "2025-11-07",
      "valid_to": null,
      "citation_id": "source-market-mi-consumers-annual-report",
      "source_url": "https://www.michigan.gov/mpsc/-/media/Project/Websites/mpsc/regulatory/reports/annual/MPSC_2025_Annual_Report.pdf"
    },
    {
      "state": "MI",
      "id": "observation-action-mi-consumers-large-load-terms-minimum_contract_term",
      "term_key": "minimum_contract_term",
      "label": "Large Load Minimum Contract Term",
      "category": "large_load",
      "proceeding_id": "action-mi-consumers-large-load-terms",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "15 years",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Consumers Energy Rate GPD large-load provisions",
      "valid_from": "2025-11-07",
      "valid_to": null,
      "citation_id": "source-market-mi-consumers-u21859",
      "source_url": "https://www.michigan.gov/mpsc/commission/news-releases/2025/11/06/mpsc-approves-terms-of-service-between-consumers-energy-and-data-centers"
    },
    {
      "state": "MI",
      "id": "observation-action-mi-consumers-large-load-terms-minimum_payment",
      "term_key": "minimum_payment",
      "label": "Large Load Minimum Payment",
      "category": "large_load",
      "proceeding_id": "action-mi-consumers-large-load-terms",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "80% of contracted demand",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Consumers Energy Rate GPD large-load provisions",
      "valid_from": "2025-11-07",
      "valid_to": null,
      "citation_id": "source-market-mi-consumers-u21859",
      "source_url": "https://www.michigan.gov/mpsc/commission/news-releases/2025/11/06/mpsc-approves-terms-of-service-between-consumers-energy-and-data-centers"
    },
    {
      "state": "MI",
      "id": "large-load-term-action-mi-consumers-large-load-terms-reporting_and_true_up",
      "term_key": "reporting_and_true_up",
      "label": "Reporting and true-up",
      "category": "large_load",
      "proceeding_id": "action-mi-consumers-large-load-terms",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "Annual demand, energy, capacity, and exit-fee reporting",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Consumers Energy must report tariff use and customer obligations to the Commission.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "source-market-mi-consumers-annual-report",
      "source_url": "https://www.michigan.gov/mpsc/-/media/Project/Websites/mpsc/regulatory/reports/annual/MPSC_2025_Annual_Report.pdf"
    },
    {
      "state": "MI",
      "id": "large-load-term-action-mi-consumers-large-load-terms-service_structure",
      "term_key": "service_structure",
      "label": "Service structure",
      "category": "large_load",
      "proceeding_id": "action-mi-consumers-large-load-terms",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "Rate GPD plus customer-specific Commission filing",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Each new customer requires an ex parte filing demonstrating cost assignment and the absence of subsidy; the Commission targets a 90-day review.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "source-market-mi-consumers-u21859",
      "source_url": "https://www.michigan.gov/mpsc/commission/news-releases/2025/11/06/mpsc-approves-terms-of-service-between-consumers-energy-and-data-centers"
    },
    {
      "state": "MI",
      "id": "large-load-term-action-mi-dte-special-contracts-capacity_protection",
      "term_key": "capacity_protection",
      "label": "Capacity protection",
      "category": "large_load",
      "proceeding_id": "action-mi-dte-special-contracts",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "Emergency curtailment before other customers",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The contracted load can be curtailed before ordinary customers during qualifying system emergencies.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "source-market-mi-consumer-protections",
      "source_url": "https://www.michigan.gov/mpsc/commission/news-releases/2026/01/27/mpsc-podcast-explores-data-center-issues-consumer-protections"
    },
    {
      "state": "MI",
      "id": "observation-action-mi-dte-special-contracts-credit_collateral",
      "term_key": "credit_collateral",
      "label": "Large Load Credit Collateral",
      "category": "large_load",
      "proceeding_id": "action-mi-dte-special-contracts",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "Upfront collateral required · public summary does not quantify",
      "boolean_value": null,
      "unit": null,
      "qualifier": "DTE Electric 1,383 MW data-center special contracts",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "source-market-mi-consumer-protections",
      "source_url": "https://www.michigan.gov/mpsc/commission/news-releases/2026/01/27/mpsc-podcast-explores-data-center-issues-consumer-protections"
    },
    {
      "state": "MI",
      "id": "observation-action-mi-dte-special-contracts-eligibility_threshold",
      "term_key": "eligibility_threshold",
      "label": "Large Load Eligibility Threshold",
      "category": "large_load",
      "proceeding_id": "action-mi-dte-special-contracts",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "1,383 MW project-specific load",
      "boolean_value": null,
      "unit": null,
      "qualifier": "DTE Electric 1,383 MW data-center special contracts",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "source-market-mi-dte-u21990",
      "source_url": "https://www.michigan.gov/mpsc/commission/events/2025/12/18/~/link.aspx?_id=5F5E5CA34D71466696AB507F9571E9FC&_z=z"
    },
    {
      "state": "MI",
      "id": "observation-action-mi-dte-special-contracts-exit_fee",
      "term_key": "exit_fee",
      "label": "Large Load Exit Fee",
      "category": "large_load",
      "proceeding_id": "action-mi-dte-special-contracts",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "Up to 10 years of minimum-demand charges",
      "boolean_value": null,
      "unit": null,
      "qualifier": "DTE Electric 1,383 MW data-center special contracts",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "source-market-mi-dte-u21990",
      "source_url": "https://www.michigan.gov/mpsc/commission/events/2025/12/18/~/link.aspx?_id=5F5E5CA34D71466696AB507F9571E9FC&_z=z"
    },
    {
      "state": "MI",
      "id": "observation-action-mi-dte-special-contracts-generation_resource_costs",
      "term_key": "generation_resource_costs",
      "label": "Large Load Generation Resource Costs",
      "category": "large_load",
      "proceeding_id": "action-mi-dte-special-contracts",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "Customer fully funds approximately 1,400 MW of storage",
      "boolean_value": null,
      "unit": null,
      "qualifier": "DTE Electric 1,383 MW data-center special contracts",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "source-market-mi-consumer-protections",
      "source_url": "https://www.michigan.gov/mpsc/commission/news-releases/2026/01/27/mpsc-podcast-explores-data-center-issues-consumer-protections"
    },
    {
      "state": "MI",
      "id": "observation-action-mi-dte-special-contracts-infrastructure_cost_responsibility",
      "term_key": "infrastructure_cost_responsibility",
      "label": "Large Load Infrastructure Cost Responsibility",
      "category": "large_load",
      "proceeding_id": "action-mi-dte-special-contracts",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "DTE bears service costs it cannot recover from the customer",
      "boolean_value": null,
      "unit": null,
      "qualifier": "DTE Electric 1,383 MW data-center special contracts",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "source-market-mi-dte-u21990",
      "source_url": "https://www.michigan.gov/mpsc/commission/events/2025/12/18/~/link.aspx?_id=5F5E5CA34D71466696AB507F9571E9FC&_z=z"
    },
    {
      "state": "MI",
      "id": "observation-action-mi-dte-special-contracts-minimum_contract_term",
      "term_key": "minimum_contract_term",
      "label": "Large Load Minimum Contract Term",
      "category": "large_load",
      "proceeding_id": "action-mi-dte-special-contracts",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "19 years",
      "boolean_value": null,
      "unit": null,
      "qualifier": "DTE Electric 1,383 MW data-center special contracts",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "source-market-mi-dte-u21990",
      "source_url": "https://www.michigan.gov/mpsc/commission/events/2025/12/18/~/link.aspx?_id=5F5E5CA34D71466696AB507F9571E9FC&_z=z"
    },
    {
      "state": "MI",
      "id": "observation-action-mi-dte-special-contracts-minimum_payment",
      "term_key": "minimum_payment",
      "label": "Large Load Minimum Payment",
      "category": "large_load",
      "proceeding_id": "action-mi-dte-special-contracts",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "80% of contracted demand",
      "boolean_value": null,
      "unit": null,
      "qualifier": "DTE Electric 1,383 MW data-center special contracts",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "source-market-mi-dte-u21990",
      "source_url": "https://www.michigan.gov/mpsc/commission/events/2025/12/18/~/link.aspx?_id=5F5E5CA34D71466696AB507F9571E9FC&_z=z"
    },
    {
      "state": "MI",
      "id": "large-load-term-action-mi-dte-special-contracts-reporting_and_true_up",
      "term_key": "reporting_and_true_up",
      "label": "Reporting and true-up",
      "category": "large_load",
      "proceeding_id": "action-mi-dte-special-contracts",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "Commission oversight of storage funding and cost recovery",
      "boolean_value": null,
      "unit": null,
      "qualifier": "DTE must preserve the approved allocation so other customers do not absorb unrecovered project costs.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "source-market-mi-consumer-protections",
      "source_url": "https://www.michigan.gov/mpsc/commission/news-releases/2026/01/27/mpsc-podcast-explores-data-center-issues-consumer-protections"
    },
    {
      "state": "MI",
      "id": "large-load-term-action-mi-dte-special-contracts-service_structure",
      "term_key": "service_structure",
      "label": "Service structure",
      "category": "large_load",
      "proceeding_id": "action-mi-dte-special-contracts",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "Project-specific special contracts pending a general tariff",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The Commission approved the identified contracts and directed DTE to file a generally available large-load tariff.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "source-market-mi-dte-u21990",
      "source_url": "https://www.michigan.gov/mpsc/commission/events/2025/12/18/~/link.aspx?_id=5F5E5CA34D71466696AB507F9571E9FC&_z=z"
    },
    {
      "state": "NJ",
      "id": "coverage-nj-rockland-electric-large-load",
      "term_key": "coverage_status",
      "label": "Large Load Coverage Status",
      "category": "large_load",
      "proceeding_id": null,
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": "jurisdiction-rockland-electric-electric",
      "status": "reported",
      "numeric_value": null,
      "text_value": "dedicated_tariff_effective",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Rockland Electric large-load coverage",
      "valid_from": "2026-07-14",
      "valid_to": null,
      "citation_id": "source-nj-bpu-rockland-sc7-coverage",
      "source_url": "https://www.nj.gov/bpu/pdf/boardorders/2026/20260630/2D%20ORDER%20RECO%20Base%20Rate%20Case.pdf"
    },
    {
      "state": "NJ",
      "id": "coverage-nj-rockland-electric-large-load-summary",
      "term_key": "coverage_summary",
      "label": "Large Load Coverage Summary",
      "category": "large_load",
      "proceeding_id": null,
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": "jurisdiction-rockland-electric-electric",
      "status": "reported",
      "numeric_value": null,
      "text_value": "Rockland Electric has an effective SC7 High Voltage Distribution option for qualifying large customers. The BPU originally approved it to serve a large data center, and the latest approved tariff retains the rate option.",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Rockland Electric large-load coverage",
      "valid_from": "2026-07-14",
      "valid_to": null,
      "citation_id": "source-nj-bpu-rockland-sc7-coverage",
      "source_url": "https://www.nj.gov/bpu/pdf/boardorders/2026/20260630/2D%20ORDER%20RECO%20Base%20Rate%20Case.pdf"
    },
    {
      "state": "NJ",
      "id": "term-rockland-electric-sc7-high-voltage-authorized-monthly_customer_charge_usd",
      "term_key": "monthly_customer_charge_usd",
      "label": "Monthly Customer Charge Usd",
      "category": "legacy_large_load",
      "proceeding_id": null,
      "tariff_version_id": "tariff-nj-bpu-rockland-electric-sc7-high-voltage-version-authorized",
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": 2288.12,
      "text_value": null,
      "boolean_value": null,
      "unit": null,
      "qualifier": "as_of_date=2026-07-01",
      "valid_from": "2026-07-01",
      "valid_to": null,
      "citation_id": "source-nj-bpu-rockland-sc7-current-rates",
      "source_url": "https://www.nj.gov/bpu/pdf/boardorders/2026/20260630/2D%20ORDER%20RECO%20Base%20Rate%20Case.pdf"
    },
    {
      "state": "NJ",
      "id": "term-rockland-electric-sc7-high-voltage-authorized-qualifying_demand_mw",
      "term_key": "qualifying_demand_mw",
      "label": "Qualifying Demand Mw",
      "category": "legacy_large_load",
      "proceeding_id": null,
      "tariff_version_id": "tariff-nj-bpu-rockland-electric-sc7-high-voltage-version-authorized",
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": 1,
      "text_value": null,
      "boolean_value": null,
      "unit": null,
      "qualifier": "as_of_date=2026-07-01",
      "valid_from": "2026-07-01",
      "valid_to": null,
      "citation_id": "source-nj-bpu-rockland-sc7-current-eligibility",
      "source_url": "https://www.nj.gov/bpu/pdf/boardorders/2026/20260630/2D%20ORDER%20RECO%20Base%20Rate%20Case.pdf"
    },
    {
      "state": "NJ",
      "id": "large-load-term-case-nj-bpu-er25060374-charges_and_assessments",
      "term_key": "charges_and_assessments",
      "label": "Charges and assessments",
      "category": "large_load",
      "proceeding_id": "case-nj-bpu-er25060374",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "Time-of-day customer, demand, and usage charges",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The schedule publishes voltage-specific monthly customer charges and demand/energy components rather than a single large-load charge.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "source-market-nj-rockland-sc7-current-order",
      "source_url": "https://www.nj.gov/bpu/pdf/boardorders/2026/20260630/2D%20ORDER%20RECO%20Base%20Rate%20Case.pdf"
    },
    {
      "state": "NJ",
      "id": "observation-action-nj-rockland-sc7-credit_collateral",
      "term_key": "credit_collateral",
      "label": "Large Load Credit Collateral",
      "category": "large_load",
      "proceeding_id": "case-nj-bpu-er25060374",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "not_specified",
      "numeric_value": null,
      "text_value": "No dedicated collateral standard stated in SC7",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Ordinary utility credit rules may still apply, but SC7 does not publish a data-center-specific security formula.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "source-market-nj-rockland-sc7-current-order",
      "source_url": "https://www.nj.gov/bpu/pdf/boardorders/2026/20260630/2D%20ORDER%20RECO%20Base%20Rate%20Case.pdf"
    },
    {
      "state": "NJ",
      "id": "observation-action-nj-rockland-sc7-eligibility_threshold",
      "term_key": "eligibility_threshold",
      "label": "Large Load Eligibility Threshold",
      "category": "large_load",
      "proceeding_id": "case-nj-bpu-er25060374",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "1 MW minimum demand",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Rockland Electric SC7 High Voltage Distribution",
      "valid_from": "2026-07-01",
      "valid_to": null,
      "citation_id": "source-market-nj-rockland-sc7-current-order",
      "source_url": "https://www.nj.gov/bpu/pdf/boardorders/2026/20260630/2D%20ORDER%20RECO%20Base%20Rate%20Case.pdf"
    },
    {
      "state": "NJ",
      "id": "observation-action-nj-rockland-sc7-exit_fee",
      "term_key": "exit_fee",
      "label": "Large Load Exit Fee",
      "category": "large_load",
      "proceeding_id": "case-nj-bpu-er25060374",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "not_specified",
      "numeric_value": null,
      "text_value": "No dedicated exit fee stated in SC7",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The reviewed schedule does not contain a stranded-asset make-whole charge.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "source-market-nj-rockland-sc7-current-order",
      "source_url": "https://www.nj.gov/bpu/pdf/boardorders/2026/20260630/2D%20ORDER%20RECO%20Base%20Rate%20Case.pdf"
    },
    {
      "state": "NJ",
      "id": "observation-action-nj-rockland-sc7-generation_resource_costs",
      "term_key": "generation_resource_costs",
      "label": "Large Load Generation Resource Costs",
      "category": "large_load",
      "proceeding_id": "case-nj-bpu-er25060374",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "not_applicable",
      "numeric_value": null,
      "text_value": "SC7 is a distribution rate",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The schedule does not establish a customer-specific generation procurement obligation.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "source-market-nj-rockland-sc7-current-order",
      "source_url": "https://www.nj.gov/bpu/pdf/boardorders/2026/20260630/2D%20ORDER%20RECO%20Base%20Rate%20Case.pdf"
    },
    {
      "state": "NJ",
      "id": "observation-action-nj-rockland-sc7-infrastructure_cost_responsibility",
      "term_key": "infrastructure_cost_responsibility",
      "label": "Large Load Infrastructure Cost Responsibility",
      "category": "large_load",
      "proceeding_id": "case-nj-bpu-er25060374",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "Customer provides primary/high-voltage receiving equipment",
      "boolean_value": null,
      "unit": null,
      "qualifier": "High-voltage service remains at the utility's discretion and the customer supplies the equipment needed to take service at the delivery voltage.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "source-market-nj-rockland-sc7-current-order",
      "source_url": "https://www.nj.gov/bpu/pdf/boardorders/2026/20260630/2D%20ORDER%20RECO%20Base%20Rate%20Case.pdf"
    },
    {
      "state": "NJ",
      "id": "observation-action-nj-rockland-sc7-minimum_contract_term",
      "term_key": "minimum_contract_term",
      "label": "Large Load Minimum Contract Term",
      "category": "large_load",
      "proceeding_id": "case-nj-bpu-er25060374",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "not_specified",
      "numeric_value": null,
      "text_value": "No special contract term stated in SC7",
      "boolean_value": null,
      "unit": null,
      "qualifier": "A customer changes class under the tariff's eligibility and annual-anniversary rules rather than a published multi-year commitment.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "source-market-nj-rockland-sc7-current-order",
      "source_url": "https://www.nj.gov/bpu/pdf/boardorders/2026/20260630/2D%20ORDER%20RECO%20Base%20Rate%20Case.pdf"
    },
    {
      "state": "NJ",
      "id": "observation-action-nj-rockland-sc7-minimum_payment",
      "term_key": "minimum_payment",
      "label": "Large Load Minimum Payment",
      "category": "large_load",
      "proceeding_id": "case-nj-bpu-er25060374",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "not_specified",
      "numeric_value": null,
      "text_value": "No dedicated take-or-pay requirement in SC7",
      "boolean_value": null,
      "unit": null,
      "qualifier": "SC7 is a time-of-day high-voltage distribution rate, not a modern large-load make-whole tariff.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "source-market-nj-rockland-sc7-current-order",
      "source_url": "https://www.nj.gov/bpu/pdf/boardorders/2026/20260630/2D%20ORDER%20RECO%20Base%20Rate%20Case.pdf"
    },
    {
      "state": "NJ",
      "id": "large-load-term-case-nj-bpu-er25060374-service_structure",
      "term_key": "service_structure",
      "label": "Service structure",
      "category": "large_load",
      "proceeding_id": "case-nj-bpu-er25060374",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "SC7 High Voltage Distribution time-of-day rate",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Eligibility begins at 1 MW based on measured demand in two of the prior twelve months.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "source-market-nj-rockland-sc7-current-order",
      "source_url": "https://www.nj.gov/bpu/pdf/boardorders/2026/20260630/2D%20ORDER%20RECO%20Base%20Rate%20Case.pdf"
    },
    {
      "state": "NY",
      "id": "large-load-term-policy-ny-large-load-26-e-0045-capacity_protection",
      "term_key": "capacity_protection",
      "label": "Capacity protection",
      "category": "large_load",
      "proceeding_id": "policy-ny-large-load-26-e-0045",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "pending",
      "numeric_value": null,
      "text_value": "Load flexibility and system planning under review",
      "boolean_value": null,
      "unit": null,
      "qualifier": "No enforceable statewide curtailment or flexibility requirement has been adopted in this proceeding.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "citation-ny-large-load",
      "source_url": "https://dps.ny.gov/event/comments-due-proceeding-motion-commission-address-interconnection-reforms-large-loads"
    },
    {
      "state": "NY",
      "id": "large-load-term-policy-ny-large-load-26-e-0045-coverage",
      "term_key": "coverage_status",
      "label": "Large Load Coverage Status",
      "category": "large_load",
      "proceeding_id": "policy-ny-large-load-26-e-0045",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "pending",
      "numeric_value": null,
      "text_value": "Policy or tariff proceeding pending",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The statewide policy remains under review; existing utility tariffs continue unless changed by Commission order.",
      "valid_from": "2026-02-12",
      "valid_to": null,
      "citation_id": "citation-ny-large-load",
      "source_url": "https://dps.ny.gov/event/comments-due-proceeding-motion-commission-address-interconnection-reforms-large-loads"
    },
    {
      "state": "NY",
      "id": "large-load-term-policy-ny-large-load-26-e-0045-generation_resource_costs",
      "term_key": "generation_resource_costs",
      "label": "Large Load Generation Resource Costs",
      "category": "large_load",
      "proceeding_id": "policy-ny-large-load-26-e-0045",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "pending",
      "numeric_value": null,
      "text_value": "Resource adequacy and procurement treatment under review",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The docket is considering supply and planning obligations created by large-load additions.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "citation-ny-large-load",
      "source_url": "https://dps.ny.gov/event/comments-due-proceeding-motion-commission-address-interconnection-reforms-large-loads"
    },
    {
      "state": "NY",
      "id": "large-load-term-policy-ny-large-load-26-e-0045-infrastructure_cost_responsibility",
      "term_key": "infrastructure_cost_responsibility",
      "label": "Large Load Infrastructure Cost Responsibility",
      "category": "large_load",
      "proceeding_id": "policy-ny-large-load-26-e-0045",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "pending",
      "numeric_value": null,
      "text_value": "Cost-causation and upgrade allocation under review",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The Commission is examining how new large loads fund interconnection and network expansion.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "citation-ny-large-load",
      "source_url": "https://dps.ny.gov/event/comments-due-proceeding-motion-commission-address-interconnection-reforms-large-loads"
    },
    {
      "state": "NY",
      "id": "large-load-term-policy-ny-large-load-26-e-0045-reporting_and_true_up",
      "term_key": "reporting_and_true_up",
      "label": "Reporting and true-up",
      "category": "large_load",
      "proceeding_id": "policy-ny-large-load-26-e-0045",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "pending",
      "numeric_value": null,
      "text_value": "Utilities and stakeholders are developing record evidence",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Future reporting and implementation requirements depend on a Commission order.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "citation-ny-large-load",
      "source_url": "https://dps.ny.gov/event/comments-due-proceeding-motion-commission-address-interconnection-reforms-large-loads"
    },
    {
      "state": "NY",
      "id": "large-load-term-policy-ny-large-load-26-e-0045-service_structure",
      "term_key": "service_structure",
      "label": "Service structure",
      "category": "large_load",
      "proceeding_id": "policy-ny-large-load-26-e-0045",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "pending",
      "numeric_value": null,
      "text_value": "Statewide large-load interconnection and tariff framework under review",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Case 26-E-0045 is a policy proceeding and has not yet produced a final statewide tariff.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "citation-ny-large-load",
      "source_url": "https://dps.ny.gov/event/comments-due-proceeding-motion-commission-address-interconnection-reforms-large-loads"
    },
    {
      "state": "NC",
      "id": "large-load-term-legislation-nc-s1026-credit_collateral",
      "term_key": "credit_collateral",
      "label": "Large Load Credit Collateral",
      "category": "large_load",
      "proceeding_id": null,
      "tariff_version_id": null,
      "legislation_id": "legislation-nc-s1026",
      "utility_jurisdiction_id": null,
      "status": "legislation_pending",
      "numeric_value": null,
      "text_value": "Financial-security protections contemplated",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Exact security mechanics would be established through Commission-approved tariffs if the bill is enacted.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "citation-legislation-nc-s1026",
      "source_url": "https://www.ncleg.gov/BillLookup/2025/S1026"
    },
    {
      "state": "NC",
      "id": "large-load-term-legislation-nc-s1026-infrastructure_cost_responsibility",
      "term_key": "infrastructure_cost_responsibility",
      "label": "Large Load Infrastructure Cost Responsibility",
      "category": "large_load",
      "proceeding_id": null,
      "tariff_version_id": null,
      "legislation_id": "legislation-nc-s1026",
      "utility_jurisdiction_id": null,
      "status": "legislation_pending",
      "numeric_value": null,
      "text_value": "Large-load customer cost responsibility",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The proposal is intended to prevent infrastructure and procurement costs from shifting to other customers.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "citation-legislation-nc-s1026",
      "source_url": "https://www.ncleg.gov/BillLookup/2025/S1026"
    },
    {
      "state": "NC",
      "id": "large-load-term-legislation-nc-s1026-minimum_contract_term",
      "term_key": "minimum_contract_term",
      "label": "Large Load Minimum Contract Term",
      "category": "large_load",
      "proceeding_id": null,
      "tariff_version_id": null,
      "legislation_id": "legislation-nc-s1026",
      "utility_jurisdiction_id": null,
      "status": "legislation_pending",
      "numeric_value": null,
      "text_value": "Long-term commitment contemplated",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The pending bill does not make a current utility tariff effective by itself.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "citation-legislation-nc-s1026",
      "source_url": "https://www.ncleg.gov/BillLookup/2025/S1026"
    },
    {
      "state": "NC",
      "id": "large-load-term-legislation-nc-s1026-minimum_payment",
      "term_key": "minimum_payment",
      "label": "Large Load Minimum Payment",
      "category": "large_load",
      "proceeding_id": null,
      "tariff_version_id": null,
      "legislation_id": "legislation-nc-s1026",
      "utility_jurisdiction_id": null,
      "status": "legislation_pending",
      "numeric_value": null,
      "text_value": "Minimum-payment protection contemplated",
      "boolean_value": null,
      "unit": null,
      "qualifier": "No enforceable statewide percentage applies until legislation and implementing tariffs are approved.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "citation-legislation-nc-s1026",
      "source_url": "https://www.ncleg.gov/BillLookup/2025/S1026"
    },
    {
      "state": "NC",
      "id": "large-load-term-legislation-nc-s1026-service_structure",
      "term_key": "service_structure",
      "label": "Service structure",
      "category": "large_load",
      "proceeding_id": null,
      "tariff_version_id": null,
      "legislation_id": "legislation-nc-s1026",
      "utility_jurisdiction_id": null,
      "status": "legislation_pending",
      "numeric_value": null,
      "text_value": "Commission-approved large-load tariff required",
      "boolean_value": null,
      "unit": null,
      "qualifier": "SB 1026 would require a dedicated framework but is not current tariff law.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "citation-legislation-nc-s1026",
      "source_url": "https://www.ncleg.gov/BillLookup/2025/S1026"
    },
    {
      "state": "OH",
      "id": "large-load-term-action-oh-aep-schedule-dct-charges_and_assessments",
      "term_key": "charges_and_assessments",
      "label": "Charges and assessments",
      "category": "large_load",
      "proceeding_id": "action-oh-aep-schedule-dct",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "Tiered study fees and project-specific upgrade security",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The customer funds the utility work needed to study and construct its interconnection rather than shifting that exposure to other customers.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "source-market-oh-aep-dct-page",
      "source_url": "https://www.aepohio.com/company/about/rates/data-center-tariff/"
    },
    {
      "state": "OH",
      "id": "observation-action-oh-aep-schedule-dct-credit_collateral",
      "term_key": "credit_collateral",
      "label": "Large Load Credit Collateral",
      "category": "large_load",
      "proceeding_id": "action-oh-aep-schedule-dct",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "50% of total minimum charges for the full contract term\n\nCollateral is waived only if the customer meets both the specified A-/A3 ratings and the liquidity test exceeding ten times the collateral requirement.",
      "boolean_value": null,
      "unit": null,
      "qualifier": "AEP Ohio Schedule DCT",
      "valid_from": "2025-07-23",
      "valid_to": null,
      "citation_id": "source-market-oh-aep-dct-page",
      "source_url": "https://www.aepohio.com/company/about/rates/data-center-tariff/"
    },
    {
      "state": "OH",
      "id": "observation-action-oh-aep-schedule-dct-eligibility_threshold",
      "term_key": "eligibility_threshold",
      "label": "Large Load Eligibility Threshold",
      "category": "large_load",
      "proceeding_id": "action-oh-aep-schedule-dct",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "More than 25 MW",
      "boolean_value": null,
      "unit": null,
      "qualifier": "AEP Ohio Schedule DCT",
      "valid_from": "2025-07-23",
      "valid_to": null,
      "citation_id": "source-market-oh-aep-dct-page",
      "source_url": "https://www.aepohio.com/company/about/rates/data-center-tariff/"
    },
    {
      "state": "OH",
      "id": "observation-action-oh-aep-schedule-dct-exit_fee",
      "term_key": "exit_fee",
      "label": "Large Load Exit Fee",
      "category": "large_load",
      "proceeding_id": "action-oh-aep-schedule-dct",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "36 months of minimum charges after year five\n\nThe reviewed tariff summary permits termination after the fifth post-ramp contract year upon payment of the stated exit charge.",
      "boolean_value": null,
      "unit": null,
      "qualifier": "AEP Ohio Schedule DCT",
      "valid_from": "2025-07-23",
      "valid_to": null,
      "citation_id": "source-market-oh-aep-dct-page",
      "source_url": "https://www.aepohio.com/company/about/rates/data-center-tariff/"
    },
    {
      "state": "OH",
      "id": "observation-action-oh-aep-schedule-dct-generation_resource_costs",
      "term_key": "generation_resource_costs",
      "label": "Large Load Generation Resource Costs",
      "category": "large_load",
      "proceeding_id": "action-oh-aep-schedule-dct",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "Not identified in reviewed AEP Ohio sources",
      "boolean_value": null,
      "unit": null,
      "qualifier": "AEP Ohio Schedule DCT",
      "valid_from": "2025-07-23",
      "valid_to": null,
      "citation_id": "source-market-oh-aep-dct-page",
      "source_url": "https://www.aepohio.com/company/about/rates/data-center-tariff/"
    },
    {
      "state": "OH",
      "id": "observation-action-oh-aep-schedule-dct-infrastructure_cost_responsibility",
      "term_key": "infrastructure_cost_responsibility",
      "label": "Large Load Infrastructure Cost Responsibility",
      "category": "large_load",
      "proceeding_id": "action-oh-aep-schedule-dct",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "Tiered study fees; full upgrade security is project-specific",
      "boolean_value": null,
      "unit": null,
      "qualifier": "AEP Ohio Schedule DCT",
      "valid_from": "2025-07-23",
      "valid_to": null,
      "citation_id": "source-market-oh-aep-dct-page",
      "source_url": "https://www.aepohio.com/company/about/rates/data-center-tariff/"
    },
    {
      "state": "OH",
      "id": "observation-action-oh-aep-schedule-dct-minimum_contract_term",
      "term_key": "minimum_contract_term",
      "label": "Large Load Minimum Contract Term",
      "category": "large_load",
      "proceeding_id": "action-oh-aep-schedule-dct",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "Load-ramp period plus 8 years",
      "boolean_value": null,
      "unit": null,
      "qualifier": "AEP Ohio Schedule DCT",
      "valid_from": "2025-07-23",
      "valid_to": null,
      "citation_id": "source-market-oh-aep-dct-page",
      "source_url": "https://www.aepohio.com/company/about/rates/data-center-tariff/"
    },
    {
      "state": "OH",
      "id": "observation-action-oh-aep-schedule-dct-minimum_payment",
      "term_key": "minimum_payment",
      "label": "Large Load Minimum Payment",
      "category": "large_load",
      "proceeding_id": "action-oh-aep-schedule-dct",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "85% above the first 25 MW · 100% above 75 MW\n\nThe tariff uses a tiered formula rather than one flat percentage for the customer's full contract capacity.",
      "boolean_value": null,
      "unit": null,
      "qualifier": "AEP Ohio Schedule DCT",
      "valid_from": "2025-07-23",
      "valid_to": null,
      "citation_id": "source-market-oh-aep-dct-page",
      "source_url": "https://www.aepohio.com/company/about/rates/data-center-tariff/"
    },
    {
      "state": "OH",
      "id": "large-load-term-action-oh-aep-schedule-dct-reporting_and_true_up",
      "term_key": "reporting_and_true_up",
      "label": "Reporting and true-up",
      "category": "large_load",
      "proceeding_id": "action-oh-aep-schedule-dct",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "Collateral and upgrade exposure update with the project",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Security reflects the remaining minimum-charge and construction exposure and can be waived only when both rating and liquidity tests are met.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "source-market-oh-aep-dct-page",
      "source_url": "https://www.aepohio.com/company/about/rates/data-center-tariff/"
    },
    {
      "state": "OH",
      "id": "large-load-term-action-oh-aep-schedule-dct-service_structure",
      "term_key": "service_structure",
      "label": "Service structure",
      "category": "large_load",
      "proceeding_id": "action-oh-aep-schedule-dct",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "Schedule DCT retail service",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The schedule applies to new data-center load above 25 MW and overlays study, ramp, minimum-demand, and security obligations.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "source-market-oh-aep-dct-page",
      "source_url": "https://www.aepohio.com/company/about/rates/data-center-tariff/"
    },
    {
      "state": "OR",
      "id": "large-load-term-action-or-pge-um-2377-charges_and_assessments",
      "term_key": "charges_and_assessments",
      "label": "Charges and assessments",
      "category": "large_load",
      "proceeding_id": "action-or-pge-um-2377",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "$0.01/kWh surcharge at 100 MW or more",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The surcharge applies to Schedule 96 customers with at least 100 MW of allocated system capacity and funds specified public-benefit purposes.",
      "valid_from": "2026-07-08",
      "valid_to": null,
      "citation_id": "citation-or-pge-um2377-final-order",
      "source_url": "https://apps.puc.state.or.us/orders/2026ords/26-154.pdf"
    },
    {
      "state": "OR",
      "id": "large-load-term-action-or-pge-um-2377-credit_collateral",
      "term_key": "credit_collateral",
      "label": "Large Load Credit Collateral",
      "category": "large_load",
      "proceeding_id": "action-or-pge-um-2377",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "A-/A3 senior unsecured rating or qualifying support",
      "boolean_value": null,
      "unit": null,
      "qualifier": "A customer that does not meet the tariff rating standard must provide acceptable support; letters of credit, cash, and surety bonds may qualify under the filed terms.",
      "valid_from": "2026-07-08",
      "valid_to": null,
      "citation_id": "citation-or-pge-um2377-final-order",
      "source_url": "https://apps.puc.state.or.us/orders/2026ords/26-154.pdf"
    },
    {
      "state": "OR",
      "id": "large-load-term-action-or-pge-um-2377-eligibility_threshold",
      "term_key": "eligibility_threshold",
      "label": "Large Load Eligibility Threshold",
      "category": "large_load",
      "proceeding_id": "action-or-pge-um-2377",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "20 MW",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Schedule 96 applies when a data-center facility requires or contracts for at least 20,000 kW.",
      "valid_from": "2026-07-08",
      "valid_to": null,
      "citation_id": "citation-or-pge-um2377-final-order",
      "source_url": "https://apps.puc.state.or.us/orders/2026ords/26-154.pdf"
    },
    {
      "state": "OR",
      "id": "large-load-term-action-or-pge-um-2377-exit_fee",
      "term_key": "exit_fee",
      "label": "Large Load Exit Fee",
      "category": "large_load",
      "proceeding_id": "action-or-pge-um-2377",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "Make-whole protection tied to remaining contract and facilities exposure",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The Rule I agreement preserves minimum-demand and exit obligations designed to recover stranded customer-caused investment.",
      "valid_from": "2026-07-08",
      "valid_to": null,
      "citation_id": "citation-or-pge-um2377-final-order",
      "source_url": "https://apps.puc.state.or.us/orders/2026ords/26-154.pdf"
    },
    {
      "state": "OR",
      "id": "large-load-term-action-or-pge-um-2377-generation_resource_costs",
      "term_key": "generation_resource_costs",
      "label": "Large Load Generation Resource Costs",
      "category": "large_load",
      "proceeding_id": "action-or-pge-um-2377",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "Clean-energy sufficiency required before service",
      "boolean_value": null,
      "unit": null,
      "qualifier": "PGE must demonstrate or procure adequate clean resources consistent with Oregon's statutory clean-energy requirements.",
      "valid_from": "2026-07-08",
      "valid_to": null,
      "citation_id": "citation-or-pge-um2377-final-order",
      "source_url": "https://apps.puc.state.or.us/orders/2026ords/26-154.pdf"
    },
    {
      "state": "OR",
      "id": "large-load-term-action-or-pge-um-2377-infrastructure_cost_responsibility",
      "term_key": "infrastructure_cost_responsibility",
      "label": "Large Load Infrastructure Cost Responsibility",
      "category": "large_load",
      "proceeding_id": "action-or-pge-um-2377",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "Dedicated distribution facilities directly assigned",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Customers bear the revenue requirement for exclusive-use and attributable facilities rather than socializing those costs.",
      "valid_from": "2026-07-08",
      "valid_to": null,
      "citation_id": "citation-or-pge-um2377-final-order",
      "source_url": "https://apps.puc.state.or.us/orders/2026ords/26-154.pdf"
    },
    {
      "state": "OR",
      "id": "large-load-term-action-or-pge-um-2377-minimum_contract_term",
      "term_key": "minimum_contract_term",
      "label": "Large Load Minimum Contract Term",
      "category": "large_load",
      "proceeding_id": "action-or-pge-um-2377",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "10–30 years based on load size",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The term is ten years at 20 MW, increases one year for each additional 10 MW, and reaches thirty years at 220 MW or more; renewals are ten years.",
      "valid_from": "2026-07-08",
      "valid_to": null,
      "citation_id": "citation-or-pge-um2377-final-order",
      "source_url": "https://apps.puc.state.or.us/orders/2026ords/26-154.pdf"
    },
    {
      "state": "OR",
      "id": "large-load-term-action-or-pge-um-2377-minimum_payment",
      "term_key": "minimum_payment",
      "label": "Large Load Minimum Payment",
      "category": "large_load",
      "proceeding_id": "action-or-pge-um-2377",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "90% generation and transmission minimum demand",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The Commission also retained direct recovery of customer-dedicated distribution costs through Rule I contract billing.",
      "valid_from": "2026-07-08",
      "valid_to": null,
      "citation_id": "citation-or-pge-um2377-final-order",
      "source_url": "https://apps.puc.state.or.us/orders/2026ords/26-154.pdf"
    },
    {
      "state": "OR",
      "id": "large-load-term-action-or-pge-um-2377-reporting_and_true_up",
      "term_key": "reporting_and_true_up",
      "label": "Reporting and true-up",
      "category": "large_load",
      "proceeding_id": "action-or-pge-um-2377",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "Commission compliance and planning review",
      "boolean_value": null,
      "unit": null,
      "qualifier": "PGE must implement the approved compliance tariff and address large-load resource and cost allocation in its planning and reporting.",
      "valid_from": "2026-07-08",
      "valid_to": null,
      "citation_id": "citation-or-pge-um2377-final-order",
      "source_url": "https://apps.puc.state.or.us/orders/2026ords/26-154.pdf"
    },
    {
      "state": "OR",
      "id": "large-load-term-action-or-pge-um-2377-service_structure",
      "term_key": "service_structure",
      "label": "Service structure",
      "category": "large_load",
      "proceeding_id": "action-or-pge-um-2377",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "PGE Schedule 96 plus mandatory Large Load Customer Agreement",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The retail tariff and Rule I agreement work together to establish rates, facilities, minimum demand, security, and exit obligations.",
      "valid_from": "2026-07-08",
      "valid_to": null,
      "citation_id": "citation-or-pge-um2377-final-order",
      "source_url": "https://apps.puc.state.or.us/orders/2026ords/26-154.pdf"
    },
    {
      "state": "PA",
      "id": "observation-coverage-pa-duquesne-light-large-load-application_deposit_usd",
      "term_key": "application_deposit_usd",
      "label": "Large Load Application Deposit Usd",
      "category": "large_load",
      "proceeding_id": null,
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": "jurisdiction-duquesne-light-electric",
      "status": "reported",
      "numeric_value": 250000,
      "text_value": null,
      "boolean_value": null,
      "unit": "USD",
      "qualifier": "Duquesne Light large-load coverage",
      "valid_from": "2026-07-14",
      "valid_to": null,
      "citation_id": "source-duquesne-large-load-customer-growth",
      "source_url": "https://duquesnelight.com/working-with-us/construction-renovation-and-service-request/large-load-customer-growth"
    },
    {
      "state": "PA",
      "id": "coverage-pa-duquesne-light-large-load",
      "term_key": "coverage_status",
      "label": "Large Load Coverage Status",
      "category": "large_load",
      "proceeding_id": null,
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": "jurisdiction-duquesne-light-electric",
      "status": "reported",
      "numeric_value": null,
      "text_value": "large_load_process_published",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Duquesne Light large-load coverage",
      "valid_from": "2026-07-14",
      "valid_to": null,
      "citation_id": "source-duquesne-large-load-customer-growth",
      "source_url": "https://duquesnelight.com/working-with-us/construction-renovation-and-service-request/large-load-customer-growth"
    },
    {
      "state": "PA",
      "id": "coverage-pa-firstenergy-pa-large-load",
      "term_key": "coverage_status",
      "label": "Large Load Coverage Status",
      "category": "large_load",
      "proceeding_id": null,
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": "jurisdiction-firstenergy-pa-electric",
      "status": "reported",
      "numeric_value": null,
      "text_value": "general_tariff_only",
      "boolean_value": null,
      "unit": null,
      "qualifier": "FirstEnergy Pennsylvania large-load coverage",
      "valid_from": "2026-07-14",
      "valid_to": null,
      "citation_id": "source-firstenergy-pa-retail-tariff-large-load-coverage",
      "source_url": "https://www.firstenergycorp.com/content/dam/customer/Customer%20Choice/Files/PA/tariffs/fe-pa-retail-tariff.pdf"
    },
    {
      "state": "PA",
      "id": "coverage-pa-firstenergy-pa-large-load-utility-met-ed",
      "term_key": "coverage_status",
      "label": "Large Load Coverage Status",
      "category": "large_load",
      "proceeding_id": null,
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": "jurisdiction-met-ed-electric",
      "status": "reported",
      "numeric_value": null,
      "text_value": "general_tariff_only",
      "boolean_value": null,
      "unit": null,
      "qualifier": "FirstEnergy Pennsylvania large-load coverage",
      "valid_from": "2026-07-14",
      "valid_to": null,
      "citation_id": "source-firstenergy-pa-retail-tariff-large-load-coverage",
      "source_url": "https://www.firstenergycorp.com/content/dam/customer/Customer%20Choice/Files/PA/tariffs/fe-pa-retail-tariff.pdf"
    },
    {
      "state": "PA",
      "id": "coverage-pa-firstenergy-pa-large-load-utility-penelec",
      "term_key": "coverage_status",
      "label": "Large Load Coverage Status",
      "category": "large_load",
      "proceeding_id": null,
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": "jurisdiction-penelec-electric",
      "status": "reported",
      "numeric_value": null,
      "text_value": "general_tariff_only",
      "boolean_value": null,
      "unit": null,
      "qualifier": "FirstEnergy Pennsylvania large-load coverage",
      "valid_from": "2026-07-14",
      "valid_to": null,
      "citation_id": "source-firstenergy-pa-retail-tariff-large-load-coverage",
      "source_url": "https://www.firstenergycorp.com/content/dam/customer/Customer%20Choice/Files/PA/tariffs/fe-pa-retail-tariff.pdf"
    },
    {
      "state": "PA",
      "id": "coverage-pa-firstenergy-pa-large-load-utility-penn-power",
      "term_key": "coverage_status",
      "label": "Large Load Coverage Status",
      "category": "large_load",
      "proceeding_id": null,
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": "jurisdiction-penn-power-electric",
      "status": "reported",
      "numeric_value": null,
      "text_value": "general_tariff_only",
      "boolean_value": null,
      "unit": null,
      "qualifier": "FirstEnergy Pennsylvania large-load coverage",
      "valid_from": "2026-07-14",
      "valid_to": null,
      "citation_id": "source-firstenergy-pa-retail-tariff-large-load-coverage",
      "source_url": "https://www.firstenergycorp.com/content/dam/customer/Customer%20Choice/Files/PA/tariffs/fe-pa-retail-tariff.pdf"
    },
    {
      "state": "PA",
      "id": "coverage-pa-firstenergy-pa-large-load-utility-west-penn-power",
      "term_key": "coverage_status",
      "label": "Large Load Coverage Status",
      "category": "large_load",
      "proceeding_id": null,
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": "jurisdiction-west-penn-power-electric",
      "status": "reported",
      "numeric_value": null,
      "text_value": "general_tariff_only",
      "boolean_value": null,
      "unit": null,
      "qualifier": "FirstEnergy Pennsylvania large-load coverage",
      "valid_from": "2026-07-14",
      "valid_to": null,
      "citation_id": "source-firstenergy-pa-retail-tariff-large-load-coverage",
      "source_url": "https://www.firstenergycorp.com/content/dam/customer/Customer%20Choice/Files/PA/tariffs/fe-pa-retail-tariff.pdf"
    },
    {
      "state": "PA",
      "id": "coverage-pa-peco-electric-large-load",
      "term_key": "coverage_status",
      "label": "Large Load Coverage Status",
      "category": "large_load",
      "proceeding_id": null,
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": "jurisdiction-peco-electric-electric",
      "status": "reported",
      "numeric_value": null,
      "text_value": "general_tariff_only",
      "boolean_value": null,
      "unit": null,
      "qualifier": "PECO Electric large-load coverage",
      "valid_from": "2026-07-14",
      "valid_to": null,
      "citation_id": "source-peco-current-electric-tariff-large-load-coverage",
      "source_url": "https://www.peco.com/cdn/assets/v3/assets/blt1b5616c79bacadb4/blt9448ea371fcf175a/69cbdc20a21ea55b33ba7d35/Current_Electric_tariff_effective_April_1_2026.pdf?branch=prod_alias"
    },
    {
      "state": "PA",
      "id": "coverage-pa-ppl-electric-large-load",
      "term_key": "coverage_status",
      "label": "Large Load Coverage Status",
      "category": "large_load",
      "proceeding_id": null,
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": "jurisdiction-ppl-electric-electric",
      "status": "reported",
      "numeric_value": null,
      "text_value": "dedicated_tariff_effective",
      "boolean_value": null,
      "unit": null,
      "qualifier": "PPL Electric large-load coverage",
      "valid_from": "2026-07-14",
      "valid_to": null,
      "citation_id": "source-ppl-current-tariff-toc-large-load-coverage",
      "source_url": "https://www.pplelectric.com/site/More/About-Us/Electric-Rates-and-Rules/Current-Electric-Tariff/Table-of-Contents"
    },
    {
      "state": "PA",
      "id": "coverage-pa-ugi-electric-large-load",
      "term_key": "coverage_status",
      "label": "Large Load Coverage Status",
      "category": "large_load",
      "proceeding_id": null,
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": "jurisdiction-ugi-electric-electric",
      "status": "reported",
      "numeric_value": null,
      "text_value": "commercial_load_intake",
      "boolean_value": null,
      "unit": null,
      "qualifier": "UGI Electric large-load coverage",
      "valid_from": "2026-07-14",
      "valid_to": null,
      "citation_id": "source-ugi-commercial-industrial-load-request",
      "source_url": "https://www.ugi.com/commercial-industrial-electric-load-request/"
    },
    {
      "state": "PA",
      "id": "coverage-pa-duquesne-light-large-load-summary",
      "term_key": "coverage_summary",
      "label": "Large Load Coverage Summary",
      "category": "large_load",
      "proceeding_id": null,
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": "jurisdiction-duquesne-light-electric",
      "status": "reported",
      "numeric_value": null,
      "text_value": "Duquesne Light publishes a dedicated large-load application and study process. The reviewed page requires a 10-year load ramp and a $250,000 deposit, but it is not an approved large-load rate schedule.",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Duquesne Light large-load coverage",
      "valid_from": "2026-07-14",
      "valid_to": null,
      "citation_id": "source-duquesne-large-load-customer-growth",
      "source_url": "https://duquesnelight.com/working-with-us/construction-renovation-and-service-request/large-load-customer-growth"
    },
    {
      "state": "PA",
      "id": "coverage-pa-firstenergy-pa-large-load-summary",
      "term_key": "coverage_summary",
      "label": "Large Load Coverage Summary",
      "category": "large_load",
      "proceeding_id": null,
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": "jurisdiction-firstenergy-pa-electric",
      "status": "reported",
      "numeric_value": null,
      "text_value": "The reviewed consolidated FirstEnergy Pennsylvania retail tariff covers the Met-Ed, Penelec, Penn Power, and West Penn Power rate districts. It does not identify a separate dedicated large-load or data-center schedule.",
      "boolean_value": null,
      "unit": null,
      "qualifier": "FirstEnergy Pennsylvania large-load coverage",
      "valid_from": "2026-07-14",
      "valid_to": null,
      "citation_id": "source-firstenergy-pa-retail-tariff-large-load-coverage",
      "source_url": "https://www.firstenergycorp.com/content/dam/customer/Customer%20Choice/Files/PA/tariffs/fe-pa-retail-tariff.pdf"
    },
    {
      "state": "PA",
      "id": "coverage-pa-firstenergy-pa-large-load-utility-met-ed-summary",
      "term_key": "coverage_summary",
      "label": "Large Load Coverage Summary",
      "category": "large_load",
      "proceeding_id": null,
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": "jurisdiction-met-ed-electric",
      "status": "reported",
      "numeric_value": null,
      "text_value": "The reviewed consolidated FirstEnergy Pennsylvania retail tariff covers the Met-Ed, Penelec, Penn Power, and West Penn Power rate districts. It does not identify a separate dedicated large-load or data-center schedule.",
      "boolean_value": null,
      "unit": null,
      "qualifier": "FirstEnergy Pennsylvania large-load coverage",
      "valid_from": "2026-07-14",
      "valid_to": null,
      "citation_id": "source-firstenergy-pa-retail-tariff-large-load-coverage",
      "source_url": "https://www.firstenergycorp.com/content/dam/customer/Customer%20Choice/Files/PA/tariffs/fe-pa-retail-tariff.pdf"
    },
    {
      "state": "PA",
      "id": "coverage-pa-firstenergy-pa-large-load-utility-penelec-summary",
      "term_key": "coverage_summary",
      "label": "Large Load Coverage Summary",
      "category": "large_load",
      "proceeding_id": null,
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": "jurisdiction-penelec-electric",
      "status": "reported",
      "numeric_value": null,
      "text_value": "The reviewed consolidated FirstEnergy Pennsylvania retail tariff covers the Met-Ed, Penelec, Penn Power, and West Penn Power rate districts. It does not identify a separate dedicated large-load or data-center schedule.",
      "boolean_value": null,
      "unit": null,
      "qualifier": "FirstEnergy Pennsylvania large-load coverage",
      "valid_from": "2026-07-14",
      "valid_to": null,
      "citation_id": "source-firstenergy-pa-retail-tariff-large-load-coverage",
      "source_url": "https://www.firstenergycorp.com/content/dam/customer/Customer%20Choice/Files/PA/tariffs/fe-pa-retail-tariff.pdf"
    },
    {
      "state": "PA",
      "id": "coverage-pa-firstenergy-pa-large-load-utility-penn-power-summary",
      "term_key": "coverage_summary",
      "label": "Large Load Coverage Summary",
      "category": "large_load",
      "proceeding_id": null,
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": "jurisdiction-penn-power-electric",
      "status": "reported",
      "numeric_value": null,
      "text_value": "The reviewed consolidated FirstEnergy Pennsylvania retail tariff covers the Met-Ed, Penelec, Penn Power, and West Penn Power rate districts. It does not identify a separate dedicated large-load or data-center schedule.",
      "boolean_value": null,
      "unit": null,
      "qualifier": "FirstEnergy Pennsylvania large-load coverage",
      "valid_from": "2026-07-14",
      "valid_to": null,
      "citation_id": "source-firstenergy-pa-retail-tariff-large-load-coverage",
      "source_url": "https://www.firstenergycorp.com/content/dam/customer/Customer%20Choice/Files/PA/tariffs/fe-pa-retail-tariff.pdf"
    },
    {
      "state": "PA",
      "id": "coverage-pa-firstenergy-pa-large-load-utility-west-penn-power-summary",
      "term_key": "coverage_summary",
      "label": "Large Load Coverage Summary",
      "category": "large_load",
      "proceeding_id": null,
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": "jurisdiction-west-penn-power-electric",
      "status": "reported",
      "numeric_value": null,
      "text_value": "The reviewed consolidated FirstEnergy Pennsylvania retail tariff covers the Met-Ed, Penelec, Penn Power, and West Penn Power rate districts. It does not identify a separate dedicated large-load or data-center schedule.",
      "boolean_value": null,
      "unit": null,
      "qualifier": "FirstEnergy Pennsylvania large-load coverage",
      "valid_from": "2026-07-14",
      "valid_to": null,
      "citation_id": "source-firstenergy-pa-retail-tariff-large-load-coverage",
      "source_url": "https://www.firstenergycorp.com/content/dam/customer/Customer%20Choice/Files/PA/tariffs/fe-pa-retail-tariff.pdf"
    },
    {
      "state": "PA",
      "id": "coverage-pa-peco-electric-large-load-summary",
      "term_key": "coverage_summary",
      "label": "Large Load Coverage Summary",
      "category": "large_load",
      "proceeding_id": null,
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": "jurisdiction-peco-electric-electric",
      "status": "reported",
      "numeric_value": null,
      "text_value": "The reviewed current PECO Electric Tariff No. 8 includes general commercial and industrial rate schedules. It does not identify a separate dedicated large-load or data-center schedule.",
      "boolean_value": null,
      "unit": null,
      "qualifier": "PECO Electric large-load coverage",
      "valid_from": "2026-07-14",
      "valid_to": null,
      "citation_id": "source-peco-current-electric-tariff-large-load-coverage",
      "source_url": "https://www.peco.com/cdn/assets/v3/assets/blt1b5616c79bacadb4/blt9448ea371fcf175a/69cbdc20a21ea55b33ba7d35/Current_Electric_tariff_effective_April_1_2026.pdf?branch=prod_alias"
    },
    {
      "state": "PA",
      "id": "coverage-pa-ppl-electric-large-load-summary",
      "term_key": "coverage_summary",
      "label": "Large Load Coverage Summary",
      "category": "large_load",
      "proceeding_id": null,
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": "jurisdiction-ppl-electric-electric",
      "status": "reported",
      "numeric_value": null,
      "text_value": "PPL Electric has an effective dedicated large-load schedule, Rate Schedule LP-6. Its reviewed eligibility and service terms are published separately in this tracker.",
      "boolean_value": null,
      "unit": null,
      "qualifier": "PPL Electric large-load coverage",
      "valid_from": "2026-07-14",
      "valid_to": null,
      "citation_id": "source-ppl-current-tariff-toc-large-load-coverage",
      "source_url": "https://www.pplelectric.com/site/More/About-Us/Electric-Rates-and-Rules/Current-Electric-Tariff/Table-of-Contents"
    },
    {
      "state": "PA",
      "id": "coverage-pa-ugi-electric-large-load-summary",
      "term_key": "coverage_summary",
      "label": "Large Load Coverage Summary",
      "category": "large_load",
      "proceeding_id": null,
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": "jurisdiction-ugi-electric-electric",
      "status": "reported",
      "numeric_value": null,
      "text_value": "UGI publishes a commercial and industrial electric load-request form for evaluating customer requirements and utility facilities. The reviewed page is an intake process, not a dedicated large-load rate schedule.",
      "boolean_value": null,
      "unit": null,
      "qualifier": "UGI Electric large-load coverage",
      "valid_from": "2026-07-14",
      "valid_to": null,
      "citation_id": "source-ugi-commercial-industrial-load-request",
      "source_url": "https://www.ugi.com/commercial-industrial-electric-load-request/"
    },
    {
      "state": "PA",
      "id": "observation-coverage-pa-duquesne-light-large-load-submitted_load_ramp_years",
      "term_key": "submitted_load_ramp_years",
      "label": "Large Load Submitted Load Ramp Years",
      "category": "large_load",
      "proceeding_id": null,
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": "jurisdiction-duquesne-light-electric",
      "status": "reported",
      "numeric_value": 10,
      "text_value": null,
      "boolean_value": null,
      "unit": "years",
      "qualifier": "Duquesne Light large-load coverage",
      "valid_from": "2026-07-14",
      "valid_to": null,
      "citation_id": "source-duquesne-large-load-customer-growth",
      "source_url": "https://duquesnelight.com/working-with-us/construction-renovation-and-service-request/large-load-customer-growth"
    },
    {
      "state": "PA",
      "id": "term-ppl-electric-lp-6-authorized-collateral_requirement",
      "term_key": "collateral_requirement",
      "label": "Collateral Requirement",
      "category": "legacy_large_load",
      "proceeding_id": null,
      "tariff_version_id": "tariff-pa-puc-ppl-electric-lp-6-version-authorized",
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "The customer must provide security equal to the rate-base cost of upgrades needed to serve it, using a letter of credit, parent guarantee, or another security instrument acceptable to PPL Electric.",
      "boolean_value": null,
      "unit": null,
      "qualifier": "as_of_date=2026-07-01",
      "valid_from": "2026-07-01",
      "valid_to": null,
      "citation_id": "source-pa-puc-ppl-lp6-compliance-terms",
      "source_url": "https://www.puc.pa.gov/pcdocs/1937729.pdf"
    },
    {
      "state": "PA",
      "id": "term-ppl-electric-lp-6-authorized-direct_upgrade_payment_requirement",
      "term_key": "direct_upgrade_payment_requirement",
      "label": "Direct Upgrade Payment Requirement",
      "category": "legacy_large_load",
      "proceeding_id": null,
      "tariff_version_id": "tariff-pa-puc-ppl-electric-lp-6-version-authorized",
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "Directly assignable transmission and distribution upgrades require contribution-in-aid-of-construction milestone payments before work is performed.",
      "boolean_value": null,
      "unit": null,
      "qualifier": "as_of_date=2026-07-01",
      "valid_from": "2026-07-01",
      "valid_to": null,
      "citation_id": "source-pa-puc-ppl-lp6-compliance-terms",
      "source_url": "https://www.puc.pa.gov/pcdocs/1937729.pdf"
    },
    {
      "state": "PA",
      "id": "term-ppl-electric-lp-6-authorized-exit_fee_requirement",
      "term_key": "exit_fee_requirement",
      "label": "Exit Fee Requirement",
      "category": "legacy_large_load",
      "proceeding_id": null,
      "tariff_version_id": "tariff-pa-puc-ppl-electric-lp-6-version-authorized",
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "The exit fee is the greater of the remaining minimum-load-guarantee obligation during the agreement term or the remaining Rate Base Security Obligation.",
      "boolean_value": null,
      "unit": null,
      "qualifier": "as_of_date=2026-07-01",
      "valid_from": "2026-07-01",
      "valid_to": null,
      "citation_id": "source-pa-puc-ppl-lp6-compliance-terms",
      "source_url": "https://www.puc.pa.gov/pcdocs/1937729.pdf"
    },
    {
      "state": "PA",
      "id": "term-ppl-electric-lp-6-authorized-firm_minimum_demand_percent_years_1_5",
      "term_key": "firm_minimum_demand_percent_years_1_5",
      "label": "Firm Minimum Demand Percent Years 1 5",
      "category": "legacy_large_load",
      "proceeding_id": null,
      "tariff_version_id": "tariff-pa-puc-ppl-electric-lp-6-version-authorized",
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": 80,
      "text_value": null,
      "boolean_value": null,
      "unit": null,
      "qualifier": "as_of_date=2026-07-01",
      "valid_from": "2026-07-01",
      "valid_to": null,
      "citation_id": "source-pa-puc-ppl-lp6-compliance-terms",
      "source_url": "https://www.puc.pa.gov/pcdocs/1937729.pdf"
    },
    {
      "state": "PA",
      "id": "term-ppl-electric-lp-6-authorized-firm_minimum_demand_percent_years_6_10",
      "term_key": "firm_minimum_demand_percent_years_6_10",
      "label": "Firm Minimum Demand Percent Years 6 10",
      "category": "legacy_large_load",
      "proceeding_id": null,
      "tariff_version_id": "tariff-pa-puc-ppl-electric-lp-6-version-authorized",
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": 50,
      "text_value": null,
      "boolean_value": null,
      "unit": null,
      "qualifier": "as_of_date=2026-07-01",
      "valid_from": "2026-07-01",
      "valid_to": null,
      "citation_id": "source-pa-puc-ppl-lp6-compliance-terms",
      "source_url": "https://www.puc.pa.gov/pcdocs/1937729.pdf"
    },
    {
      "state": "PA",
      "id": "term-ppl-electric-lp-6-authorized-interruptible_minimum_demand_percent_years_1_5",
      "term_key": "interruptible_minimum_demand_percent_years_1_5",
      "label": "Interruptible Minimum Demand Percent Years 1 5",
      "category": "legacy_large_load",
      "proceeding_id": null,
      "tariff_version_id": "tariff-pa-puc-ppl-electric-lp-6-version-authorized",
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": 60,
      "text_value": null,
      "boolean_value": null,
      "unit": null,
      "qualifier": "as_of_date=2026-07-01",
      "valid_from": "2026-07-01",
      "valid_to": null,
      "citation_id": "source-pa-puc-ppl-lp6-compliance-terms",
      "source_url": "https://www.puc.pa.gov/pcdocs/1937729.pdf"
    },
    {
      "state": "PA",
      "id": "term-ppl-electric-lp-6-authorized-interruptible_minimum_demand_percent_years_6_10",
      "term_key": "interruptible_minimum_demand_percent_years_6_10",
      "label": "Interruptible Minimum Demand Percent Years 6 10",
      "category": "legacy_large_load",
      "proceeding_id": null,
      "tariff_version_id": "tariff-pa-puc-ppl-electric-lp-6-version-authorized",
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": 30,
      "text_value": null,
      "boolean_value": null,
      "unit": null,
      "qualifier": "as_of_date=2026-07-01",
      "valid_from": "2026-07-01",
      "valid_to": null,
      "citation_id": "source-pa-puc-ppl-lp6-compliance-terms",
      "source_url": "https://www.puc.pa.gov/pcdocs/1937729.pdf"
    },
    {
      "state": "PA",
      "id": "term-ppl-electric-lp-6-authorized-maximum_ramp_years",
      "term_key": "maximum_ramp_years",
      "label": "Maximum Ramp Years",
      "category": "legacy_large_load",
      "proceeding_id": null,
      "tariff_version_id": "tariff-pa-puc-ppl-electric-lp-6-version-authorized",
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": 5,
      "text_value": null,
      "boolean_value": null,
      "unit": null,
      "qualifier": "as_of_date=2026-07-01",
      "valid_from": "2026-07-01",
      "valid_to": null,
      "citation_id": "source-pa-puc-ppl-lp6-compliance-terms",
      "source_url": "https://www.puc.pa.gov/pcdocs/1937729.pdf"
    },
    {
      "state": "PA",
      "id": "term-ppl-electric-lp-6-authorized-minimum_contract_years",
      "term_key": "minimum_contract_years",
      "label": "Minimum Contract Years",
      "category": "legacy_large_load",
      "proceeding_id": null,
      "tariff_version_id": "tariff-pa-puc-ppl-electric-lp-6-version-authorized",
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": 10,
      "text_value": null,
      "boolean_value": null,
      "unit": null,
      "qualifier": "as_of_date=2026-07-01",
      "valid_from": "2026-07-01",
      "valid_to": null,
      "citation_id": "source-pa-puc-ppl-lp6-compliance-terms",
      "source_url": "https://www.puc.pa.gov/pcdocs/1937729.pdf"
    },
    {
      "state": "PA",
      "id": "term-ppl-electric-lp-6-authorized-monthly_customer_charge_usd",
      "term_key": "monthly_customer_charge_usd",
      "label": "Monthly Customer Charge Usd",
      "category": "legacy_large_load",
      "proceeding_id": null,
      "tariff_version_id": "tariff-pa-puc-ppl-electric-lp-6-version-authorized",
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": 999.11,
      "text_value": null,
      "boolean_value": null,
      "unit": null,
      "qualifier": "as_of_date=2026-07-01",
      "valid_from": "2026-07-01",
      "valid_to": null,
      "citation_id": "source-pa-puc-ppl-lp6-compliance-terms",
      "source_url": "https://www.puc.pa.gov/pcdocs/1937729.pdf"
    },
    {
      "state": "PA",
      "id": "term-ppl-electric-lp-6-authorized-pre_security_satisfaction_minimum_demand_percent",
      "term_key": "pre_security_satisfaction_minimum_demand_percent",
      "label": "Pre Security Satisfaction Minimum Demand Percent",
      "category": "legacy_large_load",
      "proceeding_id": null,
      "tariff_version_id": "tariff-pa-puc-ppl-electric-lp-6-version-authorized",
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": 80,
      "text_value": null,
      "boolean_value": null,
      "unit": null,
      "qualifier": "as_of_date=2026-07-01",
      "valid_from": "2026-07-01",
      "valid_to": null,
      "citation_id": "source-pa-puc-ppl-lp6-compliance-terms",
      "source_url": "https://www.puc.pa.gov/pcdocs/1937729.pdf"
    },
    {
      "state": "PA",
      "id": "term-ppl-electric-lp-6-authorized-qualifying_aggregate_demand_mw",
      "term_key": "qualifying_aggregate_demand_mw",
      "label": "Qualifying Aggregate Demand Mw",
      "category": "legacy_large_load",
      "proceeding_id": null,
      "tariff_version_id": "tariff-pa-puc-ppl-electric-lp-6-version-authorized",
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": 75,
      "text_value": null,
      "boolean_value": null,
      "unit": null,
      "qualifier": "as_of_date=2026-07-01",
      "valid_from": "2026-07-01",
      "valid_to": null,
      "citation_id": "source-pa-puc-ppl-lp6-compliance-eligibility",
      "source_url": "https://www.puc.pa.gov/pcdocs/1937729.pdf"
    },
    {
      "state": "PA",
      "id": "term-ppl-electric-lp-6-authorized-qualifying_aggregate_radius_miles",
      "term_key": "qualifying_aggregate_radius_miles",
      "label": "Qualifying Aggregate Radius Miles",
      "category": "legacy_large_load",
      "proceeding_id": null,
      "tariff_version_id": "tariff-pa-puc-ppl-electric-lp-6-version-authorized",
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": 10,
      "text_value": null,
      "boolean_value": null,
      "unit": null,
      "qualifier": "as_of_date=2026-07-01",
      "valid_from": "2026-07-01",
      "valid_to": null,
      "citation_id": "source-pa-puc-ppl-lp6-compliance-eligibility",
      "source_url": "https://www.puc.pa.gov/pcdocs/1937729.pdf"
    },
    {
      "state": "PA",
      "id": "term-ppl-electric-lp-6-authorized-qualifying_demand_mw",
      "term_key": "qualifying_demand_mw",
      "label": "Qualifying Demand Mw",
      "category": "legacy_large_load",
      "proceeding_id": null,
      "tariff_version_id": "tariff-pa-puc-ppl-electric-lp-6-version-authorized",
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": 50,
      "text_value": null,
      "boolean_value": null,
      "unit": null,
      "qualifier": "as_of_date=2026-07-01",
      "valid_from": "2026-07-01",
      "valid_to": null,
      "citation_id": "source-pa-puc-ppl-lp6-compliance-eligibility",
      "source_url": "https://www.puc.pa.gov/pcdocs/1937729.pdf"
    },
    {
      "state": "PA",
      "id": "term-ppl-electric-lp-6-authorized-service_commencement_on_or_after",
      "term_key": "service_commencement_on_or_after",
      "label": "Service Commencement On Or After",
      "category": "legacy_large_load",
      "proceeding_id": null,
      "tariff_version_id": "tariff-pa-puc-ppl-electric-lp-6-version-authorized",
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "2025-10-01",
      "boolean_value": null,
      "unit": null,
      "qualifier": "as_of_date=2026-07-01",
      "valid_from": "2026-07-01",
      "valid_to": null,
      "citation_id": "source-pa-puc-ppl-lp6-compliance-eligibility",
      "source_url": "https://www.puc.pa.gov/pcdocs/1937729.pdf"
    },
    {
      "state": "PA",
      "id": "term-ppl-electric-lp-6-authorized-voltage_threshold_kv",
      "term_key": "voltage_threshold_kv",
      "label": "Voltage Threshold Kv",
      "category": "legacy_large_load",
      "proceeding_id": null,
      "tariff_version_id": "tariff-pa-puc-ppl-electric-lp-6-version-authorized",
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": 69,
      "text_value": null,
      "boolean_value": null,
      "unit": null,
      "qualifier": "as_of_date=2026-07-01",
      "valid_from": "2026-07-01",
      "valid_to": null,
      "citation_id": "source-pa-puc-ppl-lp6-compliance-eligibility",
      "source_url": "https://www.puc.pa.gov/pcdocs/1937729.pdf"
    },
    {
      "state": "PA",
      "id": "observation-action-pa-ppl-lp6-credit_collateral",
      "term_key": "credit_collateral",
      "label": "Large Load Credit Collateral",
      "category": "large_load",
      "proceeding_id": "case-pa-puc-r-2025-3057164",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "Security equal to rate-base cost of required upgrades",
      "boolean_value": null,
      "unit": null,
      "qualifier": "PPL Electric Rate Schedule LP-6",
      "valid_from": "2026-07-01",
      "valid_to": null,
      "citation_id": "source-market-pa-ppl-lp6-terms",
      "source_url": "https://www.puc.pa.gov/pcdocs/1937729.pdf"
    },
    {
      "state": "PA",
      "id": "observation-action-pa-ppl-lp6-eligibility_threshold",
      "term_key": "eligibility_threshold",
      "label": "Large Load Eligibility Threshold",
      "category": "large_load",
      "proceeding_id": "case-pa-puc-r-2025-3057164",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "50 MW single site · 75 MW aggregate within 10 miles",
      "boolean_value": null,
      "unit": null,
      "qualifier": "PPL Electric Rate Schedule LP-6",
      "valid_from": "2026-07-01",
      "valid_to": null,
      "citation_id": "source-market-pa-ppl-lp6-eligibility",
      "source_url": "https://www.puc.pa.gov/pcdocs/1937729.pdf"
    },
    {
      "state": "PA",
      "id": "observation-action-pa-ppl-lp6-exit_fee",
      "term_key": "exit_fee",
      "label": "Large Load Exit Fee",
      "category": "large_load",
      "proceeding_id": "case-pa-puc-r-2025-3057164",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "Greater of remaining minimum-load obligation or security obligation",
      "boolean_value": null,
      "unit": null,
      "qualifier": "PPL Electric Rate Schedule LP-6",
      "valid_from": "2026-07-01",
      "valid_to": null,
      "citation_id": "source-market-pa-ppl-lp6-terms",
      "source_url": "https://www.puc.pa.gov/pcdocs/1937729.pdf"
    },
    {
      "state": "PA",
      "id": "observation-action-pa-ppl-lp6-generation_resource_costs",
      "term_key": "generation_resource_costs",
      "label": "Large Load Generation Resource Costs",
      "category": "large_load",
      "proceeding_id": "case-pa-puc-r-2025-3057164",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "Not identified in the reviewed LP-6 sources",
      "boolean_value": null,
      "unit": null,
      "qualifier": "PPL Electric Rate Schedule LP-6",
      "valid_from": "2026-07-01",
      "valid_to": null,
      "citation_id": "source-market-pa-ppl-lp6-terms",
      "source_url": "https://www.puc.pa.gov/pcdocs/1937729.pdf"
    },
    {
      "state": "PA",
      "id": "observation-action-pa-ppl-lp6-infrastructure_cost_responsibility",
      "term_key": "infrastructure_cost_responsibility",
      "label": "Large Load Infrastructure Cost Responsibility",
      "category": "large_load",
      "proceeding_id": "case-pa-puc-r-2025-3057164",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "Advance milestone payments for directly assigned upgrades",
      "boolean_value": null,
      "unit": null,
      "qualifier": "PPL Electric Rate Schedule LP-6",
      "valid_from": "2026-07-01",
      "valid_to": null,
      "citation_id": "source-market-pa-ppl-lp6-terms",
      "source_url": "https://www.puc.pa.gov/pcdocs/1937729.pdf"
    },
    {
      "state": "PA",
      "id": "observation-action-pa-ppl-lp6-minimum_contract_term",
      "term_key": "minimum_contract_term",
      "label": "Large Load Minimum Contract Term",
      "category": "large_load",
      "proceeding_id": "case-pa-puc-r-2025-3057164",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "10 years",
      "boolean_value": null,
      "unit": null,
      "qualifier": "PPL Electric Rate Schedule LP-6",
      "valid_from": "2026-07-01",
      "valid_to": null,
      "citation_id": "source-market-pa-ppl-lp6-terms",
      "source_url": "https://www.puc.pa.gov/pcdocs/1937729.pdf"
    },
    {
      "state": "PA",
      "id": "observation-action-pa-ppl-lp6-minimum_payment",
      "term_key": "minimum_payment",
      "label": "Large Load Minimum Payment",
      "category": "large_load",
      "proceeding_id": "case-pa-puc-r-2025-3057164",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "Firm 80% then 50% · interruptible 60% then 30%\n\nMinimum-demand percentages step down after years one through five of the service agreement.",
      "boolean_value": null,
      "unit": null,
      "qualifier": "PPL Electric Rate Schedule LP-6",
      "valid_from": "2026-07-01",
      "valid_to": null,
      "citation_id": "source-market-pa-ppl-lp6-terms",
      "source_url": "https://www.puc.pa.gov/pcdocs/1937729.pdf"
    },
    {
      "state": "PA",
      "id": "large-load-term-policy-pa-puc-model-large-load-tariff-charges_and_assessments",
      "term_key": "charges_and_assessments",
      "label": "Charges and assessments",
      "category": "large_load",
      "proceeding_id": "policy-pa-puc-model-large-load-tariff",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "required",
      "numeric_value": null,
      "text_value": "Customer-caused network and interconnection costs",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Utility filings implement the model's minimum bill, ramp, security, and facilities-recovery mechanics.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "source-market-pa-model-tariff-order",
      "source_url": "https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-22/56_22_not.pdf"
    },
    {
      "state": "PA",
      "id": "state-term-action-pa-statewide-model-tariff-credit_collateral",
      "term_key": "credit_collateral",
      "label": "Large Load Credit Collateral",
      "category": "large_load",
      "proceeding_id": "policy-pa-puc-model-large-load-tariff",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "required",
      "numeric_value": null,
      "text_value": "Network and interconnection costs",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Collateral should fully cover network improvements and interconnection facilities, declining as construction and load-ramp milestones reduce the remaining exposure.",
      "valid_from": "2025-03-27",
      "valid_to": null,
      "citation_id": "source-market-pa-model-tariff-order",
      "source_url": "https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-22/56_22_not.pdf"
    },
    {
      "state": "PA",
      "id": "state-term-action-pa-statewide-model-tariff-eligibility_threshold",
      "term_key": "eligibility_threshold",
      "label": "Large Load Eligibility Threshold",
      "category": "large_load",
      "proceeding_id": "policy-pa-puc-model-large-load-tariff",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "required",
      "numeric_value": null,
      "text_value": "50 MW single site · 100 MW aggregate",
      "boolean_value": null,
      "unit": null,
      "qualifier": null,
      "valid_from": "2025-03-27",
      "valid_to": null,
      "citation_id": "source-market-pa-model-tariff-order",
      "source_url": "https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-22/56_22_not.pdf"
    },
    {
      "state": "PA",
      "id": "state-term-action-pa-statewide-model-tariff-exit_fee",
      "term_key": "exit_fee",
      "label": "Large Load Exit Fee",
      "category": "large_load",
      "proceeding_id": "policy-pa-puc-model-large-load-tariff",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "required",
      "numeric_value": null,
      "text_value": "Unrecovered facilities cost or remaining minimum charges",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The model uses the greater of the unrecovered network and interconnection cost or remaining minimum charges, subject to the specified one-to-five-year exit-fee period.",
      "valid_from": "2025-03-27",
      "valid_to": null,
      "citation_id": "source-market-pa-model-tariff-order",
      "source_url": "https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-22/56_22_not.pdf"
    },
    {
      "state": "PA",
      "id": "state-term-action-pa-statewide-model-tariff-generation_resource_costs",
      "term_key": "generation_resource_costs",
      "label": "Large Load Generation Resource Costs",
      "category": "large_load",
      "proceeding_id": "policy-pa-puc-model-large-load-tariff",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "not_identified",
      "numeric_value": null,
      "text_value": "Not identified in the reviewed statewide model",
      "boolean_value": null,
      "unit": null,
      "qualifier": null,
      "valid_from": "2025-03-27",
      "valid_to": null,
      "citation_id": "source-market-pa-model-tariff-order",
      "source_url": "https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-22/56_22_not.pdf"
    },
    {
      "state": "PA",
      "id": "state-term-action-pa-statewide-model-tariff-infrastructure_cost_responsibility",
      "term_key": "infrastructure_cost_responsibility",
      "label": "Large Load Infrastructure Cost Responsibility",
      "category": "large_load",
      "proceeding_id": "policy-pa-puc-model-large-load-tariff",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "implementation_pending",
      "numeric_value": null,
      "text_value": "Utility-specific filing required",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The model allocates customer-caused facilities and upgrade risk to the large-load customer, but enforceable mechanics depend on each approved utility tariff.",
      "valid_from": "2025-03-27",
      "valid_to": null,
      "citation_id": "source-market-pa-model-tariff-order",
      "source_url": "https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-22/56_22_not.pdf"
    },
    {
      "state": "PA",
      "id": "state-term-action-pa-statewide-model-tariff-minimum_contract_term",
      "term_key": "minimum_contract_term",
      "label": "Large Load Minimum Contract Term",
      "category": "large_load",
      "proceeding_id": "policy-pa-puc-model-large-load-tariff",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "required",
      "numeric_value": null,
      "text_value": "5+ years after a 3–5 year ramp",
      "boolean_value": null,
      "unit": null,
      "qualifier": null,
      "valid_from": "2025-03-27",
      "valid_to": null,
      "citation_id": "source-market-pa-model-tariff-order",
      "source_url": "https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-22/56_22_not.pdf"
    },
    {
      "state": "PA",
      "id": "state-term-action-pa-statewide-model-tariff-minimum_payment",
      "term_key": "minimum_payment",
      "label": "Large Load Minimum Payment",
      "category": "large_load",
      "proceeding_id": "policy-pa-puc-model-large-load-tariff",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "required",
      "numeric_value": null,
      "text_value": "80% of contracted demand",
      "boolean_value": null,
      "unit": null,
      "qualifier": null,
      "valid_from": "2025-03-27",
      "valid_to": null,
      "citation_id": "source-market-pa-model-tariff-order",
      "source_url": "https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-22/56_22_not.pdf"
    },
    {
      "state": "PA",
      "id": "large-load-term-policy-pa-puc-model-large-load-tariff-reporting_and_true_up",
      "term_key": "reporting_and_true_up",
      "label": "Reporting and true-up",
      "category": "large_load",
      "proceeding_id": "policy-pa-puc-model-large-load-tariff",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "implementation_pending",
      "numeric_value": null,
      "text_value": "Utility compliance filings and Commission approval",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The Commission reviews each implementation tariff and its evidence before the terms become enforceable for that utility.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "source-market-pa-model-tariff-order",
      "source_url": "https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-22/56_22_not.pdf"
    },
    {
      "state": "PA",
      "id": "large-load-term-policy-pa-puc-model-large-load-tariff-service_structure",
      "term_key": "service_structure",
      "label": "Service structure",
      "category": "large_load",
      "proceeding_id": "policy-pa-puc-model-large-load-tariff",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "required",
      "numeric_value": null,
      "text_value": "Statewide model with utility-specific tariff implementation",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The model is not self-executing; each electric distribution company files enforceable tariff language for Commission approval.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "source-market-pa-model-tariff-order",
      "source_url": "https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-22/56_22_not.pdf"
    },
    {
      "state": "TX",
      "id": "large-load-term-action-tx-ercot-large-load-rules-capacity_protection",
      "term_key": "capacity_protection",
      "label": "Capacity protection",
      "category": "large_load",
      "proceeding_id": "action-tx-ercot-large-load-rules",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "Controllability, telemetry, and operational coordination",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Covered loads must satisfy ERCOT modeling and operational requirements so the grid operator can plan and respond reliably.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "source-market-tx-ercot-nprr1234",
      "source_url": "https://www.ercot.com/mktrules/issues/NPRR1234"
    },
    {
      "state": "TX",
      "id": "large-load-term-action-tx-ercot-large-load-rules-charges_and_assessments",
      "term_key": "charges_and_assessments",
      "label": "Charges and assessments",
      "category": "large_load",
      "proceeding_id": "action-tx-ercot-large-load-rules",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "project_specific",
      "numeric_value": null,
      "text_value": "Transmission and interconnection upgrades identified through study",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Batch Zero and related studies identify system work, but the ERCOT protocol does not establish one statewide retail take-or-pay charge.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "source-market-tx-ercot-batch-zero",
      "source_url": "https://www.ercot.com/news/release/06182026-puct-approves-ercots"
    },
    {
      "state": "TX",
      "id": "state-term-action-tx-ercot-large-load-rules-credit_collateral",
      "term_key": "credit_collateral",
      "label": "Large Load Credit Collateral",
      "category": "large_load",
      "proceeding_id": "action-tx-ercot-large-load-rules",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "not_applicable",
      "numeric_value": null,
      "text_value": "Not established by the reviewed ERCOT rules",
      "boolean_value": null,
      "unit": null,
      "qualifier": null,
      "valid_from": null,
      "valid_to": null,
      "citation_id": "source-market-tx-ercot-nprr1234",
      "source_url": "https://www.ercot.com/mktrules/issues/NPRR1234"
    },
    {
      "state": "TX",
      "id": "state-term-action-tx-ercot-large-load-rules-eligibility_threshold",
      "term_key": "eligibility_threshold",
      "label": "Large Load Eligibility Threshold",
      "category": "large_load",
      "proceeding_id": "action-tx-ercot-large-load-rules",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "required",
      "numeric_value": null,
      "text_value": "25 MW visibility · 75 MW Batch Zero",
      "boolean_value": null,
      "unit": null,
      "qualifier": null,
      "valid_from": null,
      "valid_to": null,
      "citation_id": "source-market-tx-ercot-nprr1234",
      "source_url": "https://www.ercot.com/mktrules/issues/NPRR1234"
    },
    {
      "state": "TX",
      "id": "state-term-action-tx-ercot-large-load-rules-exit_fee",
      "term_key": "exit_fee",
      "label": "Large Load Exit Fee",
      "category": "large_load",
      "proceeding_id": "action-tx-ercot-large-load-rules",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "not_applicable",
      "numeric_value": null,
      "text_value": "Not established by the reviewed ERCOT rules",
      "boolean_value": null,
      "unit": null,
      "qualifier": null,
      "valid_from": null,
      "valid_to": null,
      "citation_id": "source-market-tx-ercot-nprr1234",
      "source_url": "https://www.ercot.com/mktrules/issues/NPRR1234"
    },
    {
      "state": "TX",
      "id": "state-term-action-tx-ercot-large-load-rules-generation_resource_costs",
      "term_key": "generation_resource_costs",
      "label": "Large Load Generation Resource Costs",
      "category": "large_load",
      "proceeding_id": "action-tx-ercot-large-load-rules",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "not_applicable",
      "numeric_value": null,
      "text_value": "Not established by the reviewed ERCOT grid rules",
      "boolean_value": null,
      "unit": null,
      "qualifier": null,
      "valid_from": null,
      "valid_to": null,
      "citation_id": "source-market-tx-ercot-nprr1234",
      "source_url": "https://www.ercot.com/mktrules/issues/NPRR1234"
    },
    {
      "state": "TX",
      "id": "state-term-action-tx-ercot-large-load-rules-infrastructure_cost_responsibility",
      "term_key": "infrastructure_cost_responsibility",
      "label": "Large Load Infrastructure Cost Responsibility",
      "category": "large_load",
      "proceeding_id": "action-tx-ercot-large-load-rules",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "implementation_pending",
      "numeric_value": null,
      "text_value": "Batch study identifies transmission needs",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Batch Zero evaluates system capacity and required transmission; it is not itself a statewide retail cost-recovery guarantee.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "source-market-tx-ercot-batch-zero",
      "source_url": "https://www.ercot.com/news/release/06182026-puct-approves-ercots"
    },
    {
      "state": "TX",
      "id": "state-term-action-tx-ercot-large-load-rules-minimum_contract_term",
      "term_key": "minimum_contract_term",
      "label": "Large Load Minimum Contract Term",
      "category": "large_load",
      "proceeding_id": "action-tx-ercot-large-load-rules",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "not_applicable",
      "numeric_value": null,
      "text_value": "Not a retail-contract provision",
      "boolean_value": null,
      "unit": null,
      "qualifier": null,
      "valid_from": null,
      "valid_to": null,
      "citation_id": "source-market-tx-ercot-nprr1234",
      "source_url": "https://www.ercot.com/mktrules/issues/NPRR1234"
    },
    {
      "state": "TX",
      "id": "state-term-action-tx-ercot-large-load-rules-minimum_payment",
      "term_key": "minimum_payment",
      "label": "Large Load Minimum Payment",
      "category": "large_load",
      "proceeding_id": "action-tx-ercot-large-load-rules",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "not_applicable",
      "numeric_value": null,
      "text_value": "Not a retail-rate provision",
      "boolean_value": null,
      "unit": null,
      "qualifier": null,
      "valid_from": null,
      "valid_to": null,
      "citation_id": "source-market-tx-ercot-nprr1234",
      "source_url": "https://www.ercot.com/mktrules/issues/NPRR1234"
    },
    {
      "state": "TX",
      "id": "large-load-term-action-tx-ercot-large-load-rules-reporting_and_true_up",
      "term_key": "reporting_and_true_up",
      "label": "Reporting and true-up",
      "category": "large_load",
      "proceeding_id": "action-tx-ercot-large-load-rules",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "25 MW visibility and study data requirements",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Large loads provide forecasts, models, and status updates; higher-impact projects enter the applicable study process.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "source-market-tx-ercot-nprr1234",
      "source_url": "https://www.ercot.com/mktrules/issues/NPRR1234"
    },
    {
      "state": "TX",
      "id": "large-load-term-action-tx-ercot-large-load-rules-service_structure",
      "term_key": "service_structure",
      "label": "Service structure",
      "category": "large_load",
      "proceeding_id": "action-tx-ercot-large-load-rules",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "ERCOT interconnection and operations rules, not a retail tariff",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Retail contract, collateral, and minimum-payment terms remain utility- or customer-specific.",
      "valid_from": null,
      "valid_to": null,
      "citation_id": "source-market-tx-ercot-nprr1234",
      "source_url": "https://www.ercot.com/mktrules/issues/NPRR1234"
    },
    {
      "state": "VA",
      "id": "observation-action-va-dominion-gs5-credit_collateral",
      "term_key": "credit_collateral",
      "label": "Large Load Credit Collateral",
      "category": "large_load",
      "proceeding_id": "case-va-scc-pur-2025-00058",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "Up to 60% of minimum charges over the contract term\n\nThe obligation applies to new customers without sufficient credit that contract for service on or after January 1, 2027.",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Dominion Energy Virginia GS-5 rate class",
      "valid_from": "2027-01-01",
      "valid_to": null,
      "citation_id": "source-market-va-scc-data-center-facts",
      "source_url": "https://www.scc.virginia.gov/about-the-scc/scc-facts/"
    },
    {
      "state": "VA",
      "id": "large-load-term-case-va-scc-pur-2025-00058-customer_waivers",
      "term_key": "customer_waivers",
      "label": "Customer waivers",
      "category": "large_load",
      "proceeding_id": "case-va-scc-pur-2025-00058",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "Pre-2016 existing customers excepted from new minimums",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The order distinguishes specified legacy customers from customers beginning service under the new framework.",
      "valid_from": "2027-01-01",
      "valid_to": null,
      "citation_id": "source-market-va-scc-gs5-release",
      "source_url": "https://www.scc.virginia.gov/about-the-scc/newsreleases/release/scc-issues-order-on-dev-biennial-review-2025/scc-rules-in-dev-biennial-review-case.html"
    },
    {
      "state": "VA",
      "id": "observation-action-va-dominion-gs5-eligibility_threshold",
      "term_key": "eligibility_threshold",
      "label": "Large Load Eligibility Threshold",
      "category": "large_load",
      "proceeding_id": "case-va-scc-pur-2025-00058",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "25 MW or more",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Dominion Energy Virginia GS-5 rate class",
      "valid_from": "2027-01-01",
      "valid_to": null,
      "citation_id": "source-market-va-scc-gs5-release",
      "source_url": "https://www.scc.virginia.gov/about-the-scc/newsreleases/release/scc-issues-order-on-dev-biennial-review-2025/scc-rules-in-dev-biennial-review-case.html"
    },
    {
      "state": "VA",
      "id": "observation-action-va-dominion-gs5-exit_fee",
      "term_key": "exit_fee",
      "label": "Large Load Exit Fee",
      "category": "large_load",
      "proceeding_id": "case-va-scc-pur-2025-00058",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "Not identified in reviewed SCC summaries",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Dominion Energy Virginia GS-5 rate class",
      "valid_from": "2027-01-01",
      "valid_to": null,
      "citation_id": "source-market-va-scc-data-center-facts",
      "source_url": "https://www.scc.virginia.gov/about-the-scc/scc-facts/"
    },
    {
      "state": "VA",
      "id": "observation-action-va-dominion-gs5-generation_resource_costs",
      "term_key": "generation_resource_costs",
      "label": "Large Load Generation Resource Costs",
      "category": "large_load",
      "proceeding_id": "case-va-scc-pur-2025-00058",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "Not identified in reviewed SCC summaries",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Dominion Energy Virginia GS-5 rate class",
      "valid_from": "2027-01-01",
      "valid_to": null,
      "citation_id": "source-market-va-scc-data-center-facts",
      "source_url": "https://www.scc.virginia.gov/about-the-scc/scc-facts/"
    },
    {
      "state": "VA",
      "id": "observation-action-va-dominion-gs5-infrastructure_cost_responsibility",
      "term_key": "infrastructure_cost_responsibility",
      "label": "Large Load Infrastructure Cost Responsibility",
      "category": "large_load",
      "proceeding_id": "case-va-scc-pur-2025-00058",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "Separate cost allocation and interconnection review\n\nThe SCC required separate GS-5 rates and further review of Dominion's large-load interconnection process and cost-allocation proposals.",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Dominion Energy Virginia GS-5 rate class",
      "valid_from": "2027-01-01",
      "valid_to": null,
      "citation_id": "source-market-va-scc-data-center-facts",
      "source_url": "https://www.scc.virginia.gov/about-the-scc/scc-facts/"
    },
    {
      "state": "VA",
      "id": "observation-action-va-dominion-gs5-minimum_contract_term",
      "term_key": "minimum_contract_term",
      "label": "Large Load Minimum Contract Term",
      "category": "large_load",
      "proceeding_id": "case-va-scc-pur-2025-00058",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "At least 14 years",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Dominion Energy Virginia GS-5 rate class",
      "valid_from": "2027-01-01",
      "valid_to": null,
      "citation_id": "source-market-va-scc-data-center-facts",
      "source_url": "https://www.scc.virginia.gov/about-the-scc/scc-facts/"
    },
    {
      "state": "VA",
      "id": "observation-action-va-dominion-gs5-minimum_payment",
      "term_key": "minimum_payment",
      "label": "Large Load Minimum Payment",
      "category": "large_load",
      "proceeding_id": "case-va-scc-pur-2025-00058",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "authorized",
      "numeric_value": null,
      "text_value": "85% T&D · 60% generation demand",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Dominion Energy Virginia GS-5 rate class",
      "valid_from": "2027-01-01",
      "valid_to": null,
      "citation_id": "source-market-va-scc-gs5-release",
      "source_url": "https://www.scc.virginia.gov/about-the-scc/newsreleases/release/scc-issues-order-on-dev-biennial-review-2025/scc-rules-in-dev-biennial-review-case.html"
    },
    {
      "state": "VA",
      "id": "large-load-term-case-va-scc-pur-2025-00058-reporting_and_true_up",
      "term_key": "reporting_and_true_up",
      "label": "Reporting and true-up",
      "category": "large_load",
      "proceeding_id": "case-va-scc-pur-2025-00058",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "implementation_pending",
      "numeric_value": null,
      "text_value": "Separate interconnection-process filing ordered",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The Commission directed Dominion to formalize the process used to study and connect large new loads.",
      "valid_from": "2027-01-01",
      "valid_to": null,
      "citation_id": "source-market-va-scc-data-center-facts",
      "source_url": "https://www.scc.virginia.gov/about-the-scc/scc-facts/"
    },
    {
      "state": "VA",
      "id": "large-load-term-case-va-scc-pur-2025-00058-service_structure",
      "term_key": "service_structure",
      "label": "Service structure",
      "category": "large_load",
      "proceeding_id": "case-va-scc-pur-2025-00058",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "Dominion GS-5 large general service",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The approved class applies to qualifying large customers and works with customer-specific contracts and interconnection requirements.",
      "valid_from": "2027-01-01",
      "valid_to": null,
      "citation_id": "source-market-va-scc-gs5-release",
      "source_url": "https://www.scc.virginia.gov/about-the-scc/newsreleases/release/scc-issues-order-on-dev-biennial-review-2025/scc-rules-in-dev-biennial-review-case.html"
    },
    {
      "state": "WI",
      "id": "large-load-term-action-wi-we-6630-te-113-capacity",
      "term_key": "capacity_protection",
      "label": "Capacity protection",
      "category": "large_load",
      "proceeding_id": "action-wi-we-6630-te-113",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "Mandatory charge after persistent 100 MW capacity shortfall",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The Insufficient Capacity Charge activates when seasonal metered peak demand exceeds subscribed Bespoke plus Fleet Firm capacity by more than the 100 MW variance for three consecutive years.",
      "valid_from": "2026-05-22",
      "valid_to": null,
      "citation_id": "citation-wi-6630-order-resources",
      "source_url": "https://apps.psc.wi.gov/ERF/ERFview/viewdoc.aspx?docid=591873"
    },
    {
      "state": "WI",
      "id": "large-load-term-action-wi-we-6630-te-113-charges",
      "term_key": "charges_and_assessments",
      "label": "Charges and assessments",
      "category": "large_load",
      "proceeding_id": "action-wi-we-6630-te-113",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "Fleet Firm charge, CPI-adjusted administration and 1.2% assessment",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Fleet Firm service uses the Cp1 billed-demand charge less allocated transmission costs. Administrative charges rise annually with CPI. Covered VLC bills include a 1.2% Act 141 assessment.",
      "valid_from": "2026-05-22",
      "valid_to": null,
      "citation_id": "citation-wi-6630-order-charges",
      "source_url": "https://apps.psc.wi.gov/ERF/ERFview/viewdoc.aspx?docid=591873"
    },
    {
      "state": "WI",
      "id": "large-load-term-action-wi-we-6630-te-113-coverage",
      "term_key": "coverage_status",
      "label": "Large Load Coverage Status",
      "category": "large_load",
      "proceeding_id": "action-wi-we-6630-te-113",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "Utility-specific approved tariffs",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The final order approves linked We Energies tariffs; it does not create a statewide tariff for every Wisconsin utility.",
      "valid_from": "2026-05-22",
      "valid_to": null,
      "citation_id": "citation-wi-6630-order-overview",
      "source_url": "https://apps.psc.wi.gov/ERF/ERFview/viewdoc.aspx?docid=591873"
    },
    {
      "state": "WI",
      "id": "large-load-term-action-wi-we-6630-te-113-credit-collateral",
      "term_key": "credit_collateral",
      "label": "Large Load Credit Collateral",
      "category": "large_load",
      "proceeding_id": "action-wi-we-6630-te-113",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective_under_challenge",
      "numeric_value": null,
      "text_value": "Security unless A-/A3 plus financial test is met",
      "boolean_value": null,
      "unit": null,
      "qualifier": "VLC security equals dedicated-distribution net book value plus 1.3 times 24 months of specified charges; Bespoke security equals subscribed-resource net book value. Exemption requires A-/A3 and either net worth of 2 times security or liquidity above 10 times security.",
      "valid_from": "2026-05-22",
      "valid_to": null,
      "citation_id": "citation-wi-6630-order-credit",
      "source_url": "https://apps.psc.wi.gov/ERF/ERFview/viewdoc.aspx?docid=591873"
    },
    {
      "state": "WI",
      "id": "large-load-term-action-wi-we-6630-te-113-waivers",
      "term_key": "customer_waivers",
      "label": "Customer waivers",
      "category": "large_load",
      "proceeding_id": "action-wi-we-6630-te-113",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "Large Energy Customer petition and benefit-recapture rights waived",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The customer permanently waives seeking Large Energy Customer status and waives class-level grant recapture, while remaining eligible for grants under the same individual caps as other customers.",
      "valid_from": "2026-05-22",
      "valid_to": null,
      "citation_id": "citation-wi-6630-order-overview",
      "source_url": "https://apps.psc.wi.gov/ERF/ERFview/viewdoc.aspx?docid=591873"
    },
    {
      "state": "WI",
      "id": "large-load-term-action-wi-we-6630-te-113-eligibility",
      "term_key": "eligibility_threshold",
      "label": "Large Load Eligibility Threshold",
      "category": "large_load",
      "proceeding_id": "action-wi-we-6630-te-113",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "100 MW aggregate forecast threshold",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The tariff is mandatory for customers at the Commission's 100 MW very-large-customer threshold.",
      "valid_from": "2026-05-22",
      "valid_to": null,
      "citation_id": "citation-wi-6630-order-eligibility-term",
      "source_url": "https://apps.psc.wi.gov/ERF/ERFview/viewdoc.aspx?docid=591873"
    },
    {
      "state": "WI",
      "id": "large-load-term-action-wi-we-6630-te-113-exit",
      "term_key": "exit_fee",
      "label": "Large Load Exit Fee",
      "category": "large_load",
      "proceeding_id": "action-wi-we-6630-te-113",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "Unrecoverable development cost or resource net book value",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Before commercial operation, the customer pays its share of nonrecoverable equipment, development and labor costs. After operation, it pays unrecoverable resource net book value. We Energies must mitigate costs and invoice within 90 days.",
      "valid_from": "2026-05-22",
      "valid_to": null,
      "citation_id": "citation-wi-6630-order-resources",
      "source_url": "https://apps.psc.wi.gov/ERF/ERFview/viewdoc.aspx?docid=591873"
    },
    {
      "state": "WI",
      "id": "large-load-term-action-wi-we-6630-te-113-generation",
      "term_key": "generation_resource_costs",
      "label": "Large Load Generation Resource Costs",
      "category": "large_load",
      "proceeding_id": "action-wi-we-6630-te-113",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "Sufficient Bespoke Resource subscription required",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Subscriptions must avoid long-term reliance on fleet or market firm service. Capacity-only resources are excluded; qualifying company-owned, contracted or managed resources may be outside MISO LRZ 2.",
      "valid_from": "2026-05-22",
      "valid_to": null,
      "citation_id": "citation-wi-6630-order-resources",
      "source_url": "https://apps.psc.wi.gov/ERF/ERFview/viewdoc.aspx?docid=591873"
    },
    {
      "state": "WI",
      "id": "large-load-term-action-wi-we-6630-te-113-infrastructure",
      "term_key": "infrastructure_cost_responsibility",
      "label": "Large Load Infrastructure Cost Responsibility",
      "category": "large_load",
      "proceeding_id": "action-wi-we-6630-te-113",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "Dedicated distribution facilities and customer-specific cost of capital",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Facilities serving VLCs are dedicated or customer-owned. The approved economic cost of capital uses 10.48%-10.98% ROE, 57% equity and 43% debt, prevailing debt cost and applicable taxes.",
      "valid_from": "2026-05-22",
      "valid_to": null,
      "citation_id": "citation-wi-6630-order-resources",
      "source_url": "https://apps.psc.wi.gov/ERF/ERFview/viewdoc.aspx?docid=591873"
    },
    {
      "state": "WI",
      "id": "large-load-term-action-wi-we-6630-te-113-minimum-term",
      "term_key": "minimum_contract_term",
      "label": "Large Load Minimum Contract Term",
      "category": "large_load",
      "proceeding_id": "action-wi-we-6630-te-113",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "15-year VLC term; resource term follows asset life",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The initial VLC term is 15 years. Bespoke Resources run at least through depreciable life; wind and solar run at least 20 years or for the resource-contract duration.",
      "valid_from": "2026-05-22",
      "valid_to": null,
      "citation_id": "citation-wi-6630-order-resources",
      "source_url": "https://apps.psc.wi.gov/ERF/ERFview/viewdoc.aspx?docid=591873"
    },
    {
      "state": "WI",
      "id": "large-load-term-action-wi-we-6630-te-113-minimum-payment",
      "term_key": "minimum_payment",
      "label": "Large Load Minimum Payment",
      "category": "large_load",
      "proceeding_id": "action-wi-we-6630-te-113",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "Transmission billed at greater of forecast or actual demand",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Minimum billing demand is 100% of initially forecasted load or actual demand in the billing period, whichever is higher. Monthly transmission under-recovery is deferred to the next rate case.",
      "valid_from": "2026-05-22",
      "valid_to": null,
      "citation_id": "citation-wi-6630-order-billing",
      "source_url": "https://apps.psc.wi.gov/ERF/ERFview/viewdoc.aspx?docid=591873"
    },
    {
      "state": "WI",
      "id": "large-load-term-action-wi-we-6630-te-113-reporting",
      "term_key": "reporting_and_true_up",
      "label": "Reporting and true-up",
      "category": "large_load",
      "proceeding_id": "action-wi-we-6630-te-113",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "Contract, resource, capacity, transmission and financial reporting",
      "boolean_value": null,
      "unit": null,
      "qualifier": "We Energies must file customer contracts, resource choices, capacity reports, related FERC filings, annual transmission revenues and ATC impacts, and separate VLC financials. A future rider may issue charges or credits for cost-recovery misalignment.",
      "valid_from": "2026-05-22",
      "valid_to": null,
      "citation_id": "citation-wi-6630-order-reporting",
      "source_url": "https://apps.psc.wi.gov/ERF/ERFview/viewdoc.aspx?docid=591873"
    },
    {
      "state": "WI",
      "id": "large-load-term-action-wi-we-6630-te-113-service-structure",
      "term_key": "service_structure",
      "label": "Service structure",
      "category": "large_load",
      "proceeding_id": "action-wi-we-6630-te-113",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "effective",
      "numeric_value": null,
      "text_value": "VLC market-pricing service plus Bespoke Resources agreement",
      "boolean_value": null,
      "unit": null,
      "qualifier": "A qualifying load takes mandatory VLC service and executes one or more resource agreements. Load on the VLC tariff cannot also take another We Energies retail tariff except Bespoke Resources.",
      "valid_from": "2026-05-22",
      "valid_to": null,
      "citation_id": "citation-wi-6630-order-overview",
      "source_url": "https://apps.psc.wi.gov/ERF/ERFview/viewdoc.aspx?docid=591873"
    },
    {
      "state": "WI",
      "id": "large-load-term-action-wi-wpl-6680-te-115-charges",
      "term_key": "charges_and_assessments",
      "label": "Charges and assessments",
      "category": "large_load",
      "proceeding_id": "action-wi-wpl-6680-te-115",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "pending",
      "numeric_value": null,
      "text_value": "State energy-efficiency and renewable-program contribution",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The Commission required the customer to contribute to Wisconsin's statewide energy-efficiency and renewable-energy program. The reviewed summary does not publish an amount.",
      "valid_from": "2026-05-07",
      "valid_to": null,
      "citation_id": "citation-wi-6680-program-resources",
      "source_url": "https://psc.wi.gov/Documents/PressReleases/05.08.26PressRelease.PDF"
    },
    {
      "state": "WI",
      "id": "large-load-term-action-wi-wpl-6680-te-115-coverage",
      "term_key": "coverage_status",
      "label": "Large Load Coverage Status",
      "category": "large_load",
      "proceeding_id": "action-wi-wpl-6680-te-115",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "pending",
      "numeric_value": null,
      "text_value": "One modified customer agreement; general tariff ordered for future customers",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The current agreement covers one customer. Future Wisconsin Power and Light data-center customers would take service under the ordered stand-alone tariff once filed and approved.",
      "valid_from": "2026-05-07",
      "valid_to": null,
      "citation_id": "citation-wi-6680-future-tariff",
      "source_url": "https://psc.wi.gov/Documents/PressReleases/05.08.26PressRelease.PDF"
    },
    {
      "state": "WI",
      "id": "large-load-term-action-wi-wpl-6680-te-115-credit",
      "term_key": "credit_collateral",
      "label": "Large Load Credit Collateral",
      "category": "large_load",
      "proceeding_id": "action-wi-wpl-6680-te-115",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "pending",
      "numeric_value": null,
      "text_value": "Commission-imposed financial safeguards",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The official decision summary confirms financial safeguards but does not state a rating threshold, collateral formula, or dollar amount. Those details are not inferred from the separate We Energies tariff.",
      "valid_from": "2026-05-07",
      "valid_to": null,
      "citation_id": "citation-wi-6680-protections",
      "source_url": "https://psc.wi.gov/Documents/PressReleases/05.08.26PressRelease.PDF"
    },
    {
      "state": "WI",
      "id": "large-load-term-action-wi-wpl-6680-te-115-exit",
      "term_key": "exit_fee",
      "label": "Large Load Exit Fee",
      "category": "large_load",
      "proceeding_id": "action-wi-wpl-6680-te-115",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "pending",
      "numeric_value": null,
      "text_value": "Strengthened termination charge",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The Commission strengthened the proposed charge to protect existing customers if the data-center customer leaves. The reviewed summary does not state the formula or amount.",
      "valid_from": "2026-05-07",
      "valid_to": null,
      "citation_id": "citation-wi-6680-protections",
      "source_url": "https://psc.wi.gov/Documents/PressReleases/05.08.26PressRelease.PDF"
    },
    {
      "state": "WI",
      "id": "large-load-term-action-wi-wpl-6680-te-115-resources",
      "term_key": "generation_resource_costs",
      "label": "Large Load Generation Resource Costs",
      "category": "large_load",
      "proceeding_id": "action-wi-wpl-6680-te-115",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "pending",
      "numeric_value": null,
      "text_value": "Renewable Energy Procurement Agreements approved",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The Commission approved associated agreements for the customer to use renewable resources. The reviewed summary does not publish the resource quantities, prices, or duration.",
      "valid_from": "2026-05-07",
      "valid_to": null,
      "citation_id": "citation-wi-6680-program-resources",
      "source_url": "https://psc.wi.gov/Documents/PressReleases/05.08.26PressRelease.PDF"
    },
    {
      "state": "WI",
      "id": "large-load-term-action-wi-wpl-6680-te-115-reporting",
      "term_key": "reporting_and_true_up",
      "label": "Reporting and true-up",
      "category": "large_load",
      "proceeding_id": "action-wi-wpl-6680-te-115",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "pending",
      "numeric_value": null,
      "text_value": "Additional reporting and future-adjustment mechanism",
      "boolean_value": null,
      "unit": null,
      "qualifier": "The Commission added reporting to show how the contract operates in practice and created a mechanism for later adjustments if needed.",
      "valid_from": "2026-05-07",
      "valid_to": null,
      "citation_id": "citation-wi-6680-protections",
      "source_url": "https://psc.wi.gov/Documents/PressReleases/05.08.26PressRelease.PDF"
    },
    {
      "state": "WI",
      "id": "large-load-term-action-wi-wpl-6680-te-115-service-structure",
      "term_key": "service_structure",
      "label": "Service structure",
      "category": "large_load",
      "proceeding_id": "action-wi-wpl-6680-te-115",
      "tariff_version_id": null,
      "legislation_id": null,
      "utility_jurisdiction_id": null,
      "status": "pending",
      "numeric_value": null,
      "text_value": "Customer-specific agreement under Individual Contract Rate tariff",
      "boolean_value": null,
      "unit": null,
      "qualifier": "Wisconsin Power and Light filed an Electric Service Agreement for one customer under its existing Individual Contract Rate tariff. This is not the uniform We Energies tariff model.",
      "valid_from": "2026-05-07",
      "valid_to": null,
      "citation_id": "citation-wi-6680-overview",
      "source_url": "https://psc.wi.gov/Documents/PressReleases/05.08.26PressRelease.PDF"
    }
  ]
}