  "schema_version": "1.1.0",
  "records": [
    {
      "id": "event-action-mi-dte-special-contracts-action",
      "proceeding_id": "action-mi-dte-special-contracts",
      "event_type": "other_material_event",
      "title": "DTE Electric 1,383 MW data-center special contracts",
      "start_date": null,
      "end_date": null,
      "date_precision": "unknown",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": "The MPSC conditionally approved project-specific supply and storage contracts with longer payment protection, early-termination charges, collateral, and customer-funded storage resources.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-market-mi-dte-u21990",
      "source_url": "https://www.michigan.gov/mpsc/commission/events/2025/12/18/~/link.aspx?_id=5F5E5CA34D71466696AB507F9571E9FC&_z=z",
      "state": "MI",
      "utility_id": null,
      "utility_name": null,
      "docket_number": "U-21990"
    },
    {
      "id": "event-action-pa-statewide-model-tariff-action",
      "proceeding_id": "policy-pa-puc-model-large-load-tariff",
      "event_type": "other_material_event",
      "title": "PA PUC statewide model large-load tariff",
      "start_date": null,
      "end_date": null,
      "date_precision": "unknown",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": "The Commission adopted a common baseline for utility filings. The model is not self-executing; each electric distribution company must obtain approval for its enforceable tariff.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-market-pa-model-tariff-order",
      "source_url": "https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-22/56_22_not.pdf",
      "state": "PA",
      "utility_id": null,
      "utility_name": null,
      "docket_number": "M-2025-3054271"
    },
    {
      "id": "event-action-tx-ercot-large-load-rules-action",
      "proceeding_id": "action-tx-ercot-large-load-rules",
      "event_type": "other_material_event",
      "title": "ERCOT large-load interconnection rules and Batch Zero",
      "start_date": null,
      "end_date": null,
      "date_precision": "unknown",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": "Texas is using grid-modeling, interconnection, and transmission-study rules rather than one statewide retail large-load tariff. Retail contract protections therefore cannot be inferred from the ERCOT framework.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-market-tx-ercot-nprr1234",
      "source_url": "https://www.ercot.com/mktrules/issues/NPRR1234",
      "state": "TX",
      "utility_id": null,
      "utility_name": null,
      "docket_number": "NPRR1234 · NPRR1325 · PGRR145"
    },
    {
      "id": "event-michigan-next-watch",
      "proceeding_id": "action-mi-consumers-large-load-terms",
      "event_type": "other_material_event",
      "title": "DTE generally applicable tariff",
      "start_date": null,
      "end_date": null,
      "date_precision": "unknown",
      "date_basis": "official_commission",
      "status": "conditional",
      "condition_text": "The December 2025 order directed DTE to file a large-load tariff. RateBase has not yet published a reviewed disposition of that follow-up.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-market-mi-dte-u21990",
      "source_url": "https://www.michigan.gov/mpsc/commission/events/2025/12/18/~/link.aspx?_id=5F5E5CA34D71466696AB507F9571E9FC&_z=z",
      "state": "MI",
      "utility_id": null,
      "utility_name": null,
      "docket_number": "U-21859"
    },
    {
      "id": "event-new-jersey-next-watch",
      "proceeding_id": "case-nj-bpu-er25060374",
      "event_type": "other_material_event",
      "title": "Other New Jersey electric utilities",
      "start_date": null,
      "end_date": null,
      "date_precision": "unknown",
      "date_basis": "official_commission",
      "status": "conditional",
      "condition_text": "Expansion must be established utility by utility through BPU-approved tariffs; RateBase does not infer statewide coverage from Rockland's SC7.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-market-nj-rockland-sc7-order",
      "source_url": "https://www.nj.gov/bpu/pdf/boardorders/2008/9-12-08-2D.pdf",
      "state": "NJ",
      "utility_id": "utility-rockland-electric",
      "utility_name": "Rockland Electric",
      "docket_number": "ER25060374"
    },
    {
      "id": "event-ohio-next-watch",
      "proceeding_id": "action-oh-aep-schedule-dct",
      "event_type": "other_material_event",
      "title": "Contracted-load conversion",
      "start_date": null,
      "end_date": null,
      "date_precision": "unknown",
      "date_basis": "official_commission",
      "status": "conditional",
      "condition_text": "AEP Ohio reported 5,642 MW under binding tariff contracts in February 2026; track later study tranches and additional signed contracts.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-market-oh-aep-tariff-update",
      "source_url": "https://www.aepohio.com/company/news/view?releaseID=10753",
      "state": "OH",
      "utility_id": null,
      "utility_name": null,
      "docket_number": "24-0508-EL-ATA"
    },
    {
      "id": "event-pennsylvania-next-watch",
      "proceeding_id": "policy-pa-puc-model-large-load-tariff",
      "event_type": "other_material_event",
      "title": "Utility-specific tariff implementation",
      "start_date": null,
      "end_date": null,
      "date_precision": "unknown",
      "date_basis": "official_commission",
      "status": "conditional",
      "condition_text": "The model is not self-executing. Track each electric distribution company's filing and Commission approval for the enforceable customer terms.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-market-pa-model-tariff-order",
      "source_url": "https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-22/56_22_not.pdf",
      "state": "PA",
      "utility_id": null,
      "utility_name": null,
      "docket_number": "M-2025-3054271"
    },
    {
      "id": "event-texas-next-watch",
      "proceeding_id": "action-tx-ercot-large-load-rules",
      "event_type": "other_material_event",
      "title": "Batch Zero applicant classifications",
      "start_date": null,
      "end_date": null,
      "date_precision": "unknown",
      "date_basis": "official_commission",
      "status": "conditional",
      "condition_text": "ERCOT expects to classify projects in August 2026, followed by a final transmission plan in fall 2027.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-market-tx-ercot-batch-zero",
      "source_url": "https://www.ercot.com/news/release/06182026-puct-approves-ercots",
      "state": "TX",
      "utility_id": null,
      "utility_name": null,
      "docket_number": "NPRR1234 · NPRR1325 · PGRR145"
    },
    {
      "id": "event-virginia-next-watch",
      "proceeding_id": "case-va-scc-pur-2025-00058",
      "event_type": "other_material_event",
      "title": "GS-5 implementation",
      "start_date": null,
      "end_date": null,
      "date_precision": "unknown",
      "date_basis": "official_commission",
      "status": "conditional",
      "condition_text": "Track Dominion's transition of qualifying new load into GS-5 ahead of the January 1, 2027 effective date.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-market-va-scc-gs5-release",
      "source_url": "https://www.scc.virginia.gov/about-the-scc/newsreleases/release/scc-issues-order-on-dev-biennial-review-2025/scc-rules-in-dev-biennial-review-case.html",
      "state": "VA",
      "utility_id": "utility-dominion-energy-virginia",
      "utility_name": "Dominion Energy Virginia",
      "docket_number": "PUR-2025-00058"
    },
    {
      "id": "event-ga-psc-42315-opened-2019-01-03",
      "proceeding_id": "action-ga-agl-42315",
      "event_type": "case_opened",
      "title": "Docket opened",
      "start_date": "2019-01-03",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-ga-psc-discovery-42315",
      "source_url": "https://psc.ga.gov/facts-advanced-search/docket/?docketId=42315",
      "state": "GA",
      "utility_id": "utility-atlanta-gas-light",
      "utility_name": "Atlanta Gas Light",
      "docket_number": "42315"
    },
    {
      "id": "event-appalachian-natural-gas-pur-2018-00015-final-order",
      "proceeding_id": "case-appalachian-natural-gas-pur-2018-00015",
      "event_type": "order_entered",
      "title": "Virginia SCC entered the Appalachian Natural Gas final order",
      "start_date": "2019-11-15",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-appalachian-natural-gas-pur-2018-00015-final-order",
      "source_url": "https://www.scc.virginia.gov/docketsearch/DOCS/4jtj01%21.PDF",
      "state": "VA",
      "utility_id": "utility-appalachian-natural-gas-va",
      "utility_name": "Appalachian Natural Gas",
      "docket_number": "PUR-2018-00015"
    },
    {
      "id": "event-semco-u20479-order-entered",
      "proceeding_id": "case-semco-energy-gas-u-20479",
      "event_type": "order_entered",
      "title": "MPSC approved the SEMCO settlement",
      "start_date": "2019-12-06",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-semco-u22002-summary-page-2",
      "source_url": "https://openmpsc.com/files/26/a00cs00001XkOjlAAF.pdf",
      "state": "MI",
      "utility_id": "utility-semco-energy-gas",
      "utility_name": "SEMCO Energy Gas",
      "docket_number": "U-20479"
    },
    {
      "id": "event-ga-psc-42959-opened-2019-12-11",
      "proceeding_id": "action-ga-liberty-42959",
      "event_type": "case_opened",
      "title": "Docket opened",
      "start_date": "2019-12-11",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-ga-psc-discovery-42959",
      "source_url": "https://psc.ga.gov/facts-advanced-search/docket/?docketId=42959",
      "state": "GA",
      "utility_id": "utility-liberty-ga",
      "utility_name": "Liberty Utilities — Georgia",
      "docket_number": "42959"
    },
    {
      "id": "event-washington-gas-virginia-pur-2018-00080-final-order",
      "proceeding_id": "case-washington-gas-virginia-pur-2018-00080",
      "event_type": "order_entered",
      "title": "Virginia SCC entered the Washington Gas final order",
      "start_date": "2019-12-20",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-washington-gas-virginia-pur-2018-00080-final-order",
      "source_url": "https://www.scc.virginia.gov/docketsearch/DOCS/4kfv01%21.PDF",
      "state": "VA",
      "utility_id": "utility-washington-gas-virginia",
      "utility_name": "Washington Gas Virginia",
      "docket_number": "PUR-2018-00080"
    },
    {
      "id": "event-indiana-michigan-power-u-20359-order",
      "proceeding_id": "case-indiana-michigan-power-u-20359",
      "event_type": "order_entered",
      "title": "Final order issued",
      "start_date": "2020-01-23",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-indiana-michigan-power-u-20359-official",
      "source_url": "https://www.michigan.gov/-/media/Project/Websites/mpsc/regulatory/reports/annual/MPSC_2020_Annual_Report.pdf",
      "state": "MI",
      "utility_id": "utility-indiana-michigan-power",
      "utility_name": "Indiana Michigan Power",
      "docket_number": "U-20359"
    },
    {
      "id": "event-pa-puc-r-2019-3015162-2020-01-28-filed",
      "proceeding_id": "case-pa-puc-r-2019-3015162",
      "event_type": "application_filed",
      "title": "General rate application filed",
      "start_date": "2020-01-28",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-ugi-r-2019-3015162-history",
      "source_url": "https://www.ugi.com/rate-filing-old/past/",
      "state": "PA",
      "utility_id": "utility-ugi-gas",
      "utility_name": "UGI Gas",
      "docket_number": "R-2019-3015162"
    },
    {
      "id": "event-nj-bpu-er20020146-2020-02-18-filed",
      "proceeding_id": "case-nj-bpu-er20020146",
      "event_type": "application_filed",
      "title": "Base rate petition filed",
      "start_date": "2020-02-18",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nj-bpu-er20020146-order",
      "source_url": "https://www.nj.gov/bpu/pdf/boardorders/2020/20201028/2B%20-%20ORDER%20JCP%26L%202020%20Base%20Rate%20Filing.pdf",
      "state": "NJ",
      "utility_id": "utility-jersey-central-power-light",
      "utility_name": "JCP&L",
      "docket_number": "ER20020146"
    },
    {
      "id": "event-centerpoint-houston-electric-49421-order",
      "proceeding_id": "case-centerpoint-houston-electric-49421",
      "event_type": "order_entered",
      "title": "Final order issued",
      "start_date": "2020-03-09",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-centerpoint-houston-electric-49421-official",
      "source_url": "https://interchange.puc.texas.gov/Documents/57467_114_1488875.PDF",
      "state": "TX",
      "utility_id": "utility-centerpoint-houston-electric",
      "utility_name": "CenterPoint Houston Electric",
      "docket_number": "49421"
    },
    {
      "id": "event-nj-bpu-gr20030243-2020-03-13-filed",
      "proceeding_id": "case-nj-bpu-gr20030243",
      "event_type": "application_filed",
      "title": "Base rate petition filed",
      "start_date": "2020-03-13",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nj-bpu-gr20030243-order",
      "source_url": "https://nj.gov/bpu/pdf/boardorders/2020/20200923/2K%20-%20ORDER%20South%20Jersey%20Gas%202020%20BRC.pdf",
      "state": "NJ",
      "utility_id": "utility-south-jersey-gas",
      "utility_name": "South Jersey Gas",
      "docket_number": "GR20030243"
    },
    {
      "id": "event-aep-texas-49494-order",
      "proceeding_id": "case-aep-texas-49494",
      "event_type": "order_entered",
      "title": "Final order issued",
      "start_date": "2020-04-06",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-aep-texas-49494-official",
      "source_url": "https://interchange.puc.texas.gov/Documents/57467_114_1488875.PDF",
      "state": "TX",
      "utility_id": "utility-aep-texas",
      "utility_name": "AEP Texas",
      "docket_number": "49494"
    },
    {
      "id": "event-atmos-west-texas-gud-10900-order",
      "proceeding_id": "case-atmos-west-texas-gud-10900",
      "event_type": "order_entered",
      "title": "Final order issued",
      "start_date": "2020-04-21",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-atmos-west-texas-gud-10900-official",
      "source_url": "https://www.rrc.texas.gov/hearings/dockets/gas-utility-dockets/gud-10900/",
      "state": "TX",
      "utility_id": "utility-atmos-west-texas",
      "utility_name": "Atmos West Texas",
      "docket_number": "GUD-10900"
    },
    {
      "id": "event-pa-puc-r-2020-3018835-2020-04-24-filed",
      "proceeding_id": "case-pa-puc-r-2020-3018835",
      "event_type": "application_filed",
      "title": "General rate application filed",
      "start_date": "2020-04-24",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-columbia-r-2020-3018835-sec",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1111711/000111171121000036/nix-20210930.htm",
      "state": "PA",
      "utility_id": "utility-columbia-gas-pa",
      "utility_name": "Columbia Gas of Pennsylvania",
      "docket_number": "R-2020-3018835"
    },
    {
      "id": "event-dte-electric-u-20561-order",
      "proceeding_id": "case-dte-electric-u-20561",
      "event_type": "order_entered",
      "title": "Final order issued",
      "start_date": "2020-05-08",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-dte-electric-u-20561-official",
      "source_url": "https://www.michigan.gov/-/media/Project/Websites/mpsc/regulatory/reports/annual/MPSC_2020_Annual_Report.pdf",
      "state": "MI",
      "utility_id": "utility-dte-electric",
      "utility_name": "DTE Electric",
      "docket_number": "U-20561"
    },
    {
      "id": "event-texas-gas-service-gud-10928-order",
      "proceeding_id": "case-texas-gas-service-gud-10928",
      "event_type": "order_entered",
      "title": "Final order issued",
      "start_date": "2020-08-04",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-texas-gas-service-gud-10928-official",
      "source_url": "https://www.rrc.texas.gov/hearings/dockets/gas-utility-dockets/gud-10928/",
      "state": "TX",
      "utility_id": "utility-texas-gas-service",
      "utility_name": "Texas Gas Service",
      "docket_number": "GUD-10928"
    },
    {
      "id": "event-sps-texas-49831-order",
      "proceeding_id": "case-sps-texas-49831",
      "event_type": "order_entered",
      "title": "Final order issued",
      "start_date": "2020-08-27",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-sps-texas-49831-official",
      "source_url": "https://interchange.puc.texas.gov/Documents/57467_114_1488875.PDF",
      "state": "TX",
      "utility_id": "utility-sps-texas",
      "utility_name": "SPS Texas",
      "docket_number": "49831"
    },
    {
      "id": "event-nj-bpu-gr20030243-2020-09-23-final-order",
      "proceeding_id": "case-nj-bpu-gr20030243",
      "event_type": "order_entered",
      "title": "Board approved settlement",
      "start_date": "2020-09-23",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nj-bpu-gr20030243-order",
      "source_url": "https://nj.gov/bpu/pdf/boardorders/2020/20200923/2K%20-%20ORDER%20South%20Jersey%20Gas%202020%20BRC.pdf",
      "state": "NJ",
      "utility_id": "utility-south-jersey-gas",
      "utility_name": "South Jersey Gas",
      "docket_number": "GR20030243"
    },
    {
      "id": "event-pa-puc-r-2020-3018929-2020-09-30-filed",
      "proceeding_id": "case-pa-puc-r-2020-3018929",
      "event_type": "application_filed",
      "title": "General rate application filed",
      "start_date": "2020-09-30",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-peco-r-2020-3018929-request",
      "source_url": "https://www.sec.gov/Archives/edgar/data/9466/000110935721000018/exc-20210224992.htm",
      "state": "PA",
      "utility_id": "utility-peco-gas",
      "utility_name": "PECO Gas",
      "docket_number": "R-2020-3018929"
    },
    {
      "id": "event-pa-puc-r-2019-3015162-2020-10-08-final-order",
      "proceeding_id": "case-pa-puc-r-2019-3015162",
      "event_type": "order_entered",
      "title": "Commission approved settlement",
      "start_date": "2020-10-08",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-ugi-r-2019-3015162-sec",
      "source_url": "https://www.sec.gov/Archives/edgar/data/884614/000088461422000010/ugi-20211231.htm",
      "state": "PA",
      "utility_id": "utility-ugi-gas",
      "utility_name": "UGI Gas",
      "docket_number": "R-2019-3015162"
    },
    {
      "id": "event-nj-bpu-er20020146-2020-10-28-final-order",
      "proceeding_id": "case-nj-bpu-er20020146",
      "event_type": "order_entered",
      "title": "Board adopted settlement",
      "start_date": "2020-10-28",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nj-bpu-er20020146-order",
      "source_url": "https://www.nj.gov/bpu/pdf/boardorders/2020/20201028/2B%20-%20ORDER%20JCP%26L%202020%20Base%20Rate%20Filing.pdf",
      "state": "NJ",
      "utility_id": "utility-jersey-central-power-light",
      "utility_name": "JCP&L",
      "docket_number": "ER20020146"
    },
    {
      "id": "event-appalachian-power-pur-2020-00015-order",
      "proceeding_id": "case-appalachian-power-pur-2020-00015",
      "event_type": "order_entered",
      "title": "Final order issued",
      "start_date": "2020-11-24",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-appalachian-power-pur-2020-00015-official",
      "source_url": "https://www.scc.virginia.gov/about-the-scc/annual-reports/older-reports/",
      "state": "VA",
      "utility_id": "utility-appalachian-power-va",
      "utility_name": "Appalachian Power",
      "docket_number": "PUR-2020-00015"
    },
    {
      "id": "event-epcor-gas-texas-gud-10988-order",
      "proceeding_id": "case-epcor-gas-texas-gud-10988",
      "event_type": "order_entered",
      "title": "Final order issued",
      "start_date": "2020-12-08",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-epcor-gas-texas-gud-10988-official",
      "source_url": "https://www.rrc.texas.gov/hearings/dockets/gas-utility-dockets/gud-10988/",
      "state": "TX",
      "utility_id": "utility-epcor-gas-texas",
      "utility_name": "EPCOR Gas Texas",
      "docket_number": "GUD-10988"
    },
    {
      "id": "event-nj-bpu-er20120746-2020-12-09-filed",
      "proceeding_id": "case-nj-bpu-er20120746",
      "event_type": "application_filed",
      "title": "Base rate petition filed",
      "start_date": "2020-12-09",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nj-bpu-er20120746-order",
      "source_url": "https://nj.gov/bpu/pdf/boardorders/2021/20210714/2B%20ORDER%20ACE%202020%20BRC.pdf",
      "state": "NJ",
      "utility_id": "utility-atlantic-city-electric",
      "utility_name": "Atlantic City Electric",
      "docket_number": "ER20120746"
    },
    {
      "id": "event-consumers-energy-u-20697-order",
      "proceeding_id": "case-consumers-energy-u-20697",
      "event_type": "order_entered",
      "title": "Final order issued",
      "start_date": "2020-12-17",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-consumers-energy-u-20697-official",
      "source_url": "https://www.michigan.gov/-/media/Project/Websites/mpsc/regulatory/reports/annual/MPSC_2020_Annual_Report.pdf",
      "state": "MI",
      "utility_id": "utility-consumers-energy",
      "utility_name": "Consumers Energy",
      "docket_number": "U-20697"
    },
    {
      "id": "event-pa-puc-r-2019-3015162-2021-01-01-rates-effective",
      "proceeding_id": "case-pa-puc-r-2019-3015162",
      "event_type": "rates_effective",
      "title": "First authorized rate phase became effective",
      "start_date": "2021-01-01",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-ugi-r-2019-3015162-sec",
      "source_url": "https://www.sec.gov/Archives/edgar/data/884614/000088461422000010/ugi-20211231.htm",
      "state": "PA",
      "utility_id": "utility-ugi-gas",
      "utility_name": "UGI Gas",
      "docket_number": "R-2019-3015162"
    },
    {
      "id": "event-pa-puc-r-2020-3018835-2021-01-23-rates-effective",
      "proceeding_id": "case-pa-puc-r-2020-3018835",
      "event_type": "rates_effective",
      "title": "Authorized rates became effective",
      "start_date": "2021-01-23",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-columbia-r-2020-3018835-sec",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1111711/000111171121000036/nix-20210930.htm",
      "state": "PA",
      "utility_id": "utility-columbia-gas-pa",
      "utility_name": "Columbia Gas of Pennsylvania",
      "docket_number": "R-2020-3018835"
    },
    {
      "id": "event-pa-puc-r-2021-3023618-2021-02-08-filed",
      "proceeding_id": "case-pa-puc-r-2021-3023618",
      "event_type": "application_filed",
      "title": "General rate application filed",
      "start_date": "2021-02-08",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-ugi-r-2021-3023618-history",
      "source_url": "https://www.ugi.com/rate-filing-old/past/",
      "state": "PA",
      "utility_id": "utility-ugi-electric",
      "utility_name": "UGI Electric",
      "docket_number": "R-2021-3023618"
    },
    {
      "id": "event-pa-puc-r-2020-3018835-2021-02-19-final-order",
      "proceeding_id": "case-pa-puc-r-2020-3018835",
      "event_type": "order_entered",
      "title": "Final opinion and order entered",
      "start_date": "2021-02-19",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-pa-puc-r-2020-3018835-docket",
      "source_url": "https://www.puc.pa.gov/docket/R-2020-3018835",
      "state": "PA",
      "utility_id": "utility-columbia-gas-pa",
      "utility_name": "Columbia Gas of Pennsylvania",
      "docket_number": "R-2020-3018835"
    },
    {
      "id": "event-nj-bpu-gr21030679-2021-03-30-filed",
      "proceeding_id": "case-nj-bpu-gr21030679",
      "event_type": "application_filed",
      "title": "Base rate petition filed",
      "start_date": "2021-03-30",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nj-bpu-gr21030679-order",
      "source_url": "https://www.nj.gov/bpu/bpu/pdf/boardorders/2021/20211117/2K%20ORDER%20NJNG%202021%20BRC.pdf",
      "state": "NJ",
      "utility_id": "utility-new-jersey-natural-gas",
      "utility_name": "New Jersey Natural Gas",
      "docket_number": "GR21030679"
    },
    {
      "id": "event-pa-puc-r-2021-3024296-2021-03-30-filed",
      "proceeding_id": "case-pa-puc-r-2021-3024296",
      "event_type": "application_filed",
      "title": "General rate application filed",
      "start_date": "2021-03-30",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-columbia-r-2021-3024296-sec",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1111711/000111171122000007/nix-20211231.htm",
      "state": "PA",
      "utility_id": "utility-columbia-gas-pa",
      "utility_name": "Columbia Gas of Pennsylvania",
      "docket_number": "R-2021-3024296"
    },
    {
      "id": "event-pa-puc-r-2021-3024601-2021-03-30-filed",
      "proceeding_id": "case-pa-puc-r-2021-3024601",
      "event_type": "application_filed",
      "title": "General rate application filed",
      "start_date": "2021-03-30",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-peco-r-2021-3024601-request",
      "source_url": "https://www.sec.gov/Archives/edgar/data/22606/000110935721000077/exc-20210804992.htm",
      "state": "PA",
      "utility_id": "utility-peco-electric",
      "utility_name": "PECO Electric",
      "docket_number": "R-2021-3024601"
    },
    {
      "id": "event-pa-puc-r-2021-3024750-2021-04-16-filed",
      "proceeding_id": "case-pa-puc-r-2021-3024750",
      "event_type": "application_filed",
      "title": "General rate application filed",
      "start_date": "2021-04-16",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-duquesne-r-2021-3024750-filing",
      "source_url": "https://newsroom.duquesnelight.com/duquesne-light-company-lighting-the-way-toward-a-sustainable-future-with-proposals-focused-on-economic-recovery-reliable-infrastructure-electric-vehicles",
      "state": "PA",
      "utility_id": "utility-duquesne-light",
      "utility_name": "Duquesne Light",
      "docket_number": "R-2021-3024750"
    },
    {
      "id": "event-nj-bpu-er21050823-2021-05-21-filed",
      "proceeding_id": "case-nj-bpu-er21050823",
      "event_type": "application_filed",
      "title": "Base rate petition filed",
      "start_date": "2021-05-21",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nj-bpu-er21050823-order",
      "source_url": "https://www.nj.gov/bpu/bpu/pdf/boardorders/2021/20211215/2B%20ORDER%20RECO%202021%20BRC.pdf",
      "state": "NJ",
      "utility_id": "utility-rockland-electric",
      "utility_name": "Rockland Electric",
      "docket_number": "ER21050823"
    },
    {
      "id": "event-epe-52195-application-filed",
      "proceeding_id": "case-el-paso-electric-52195",
      "event_type": "application_filed",
      "title": "El Paso Electric filed its Texas base-rate application",
      "start_date": "2021-06-01",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-epe-52195-final-order-page-2",
      "source_url": "https://interchange.puc.texas.gov/Documents/52195_620_1238994.PDF",
      "state": "TX",
      "utility_id": "utility-el-paso-electric",
      "utility_name": "El Paso Electric",
      "docket_number": "52195"
    },
    {
      "id": "event-pa-puc-r-2020-3018929-2021-06-22-final-order",
      "proceeding_id": "case-pa-puc-r-2020-3018929",
      "event_type": "order_entered",
      "title": "Commission order issued",
      "start_date": "2021-06-22",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-peco-r-2020-3018929-outcome",
      "source_url": "https://www.sec.gov/Archives/edgar/data/22606/000110935721000077/exc-20210804992.htm",
      "state": "PA",
      "utility_id": "utility-peco-gas",
      "utility_name": "PECO Gas",
      "docket_number": "R-2020-3018929"
    },
    {
      "id": "event-pa-puc-r-2020-3018929-2021-07-01-rates-effective",
      "proceeding_id": "case-pa-puc-r-2020-3018929",
      "event_type": "rates_effective",
      "title": "Authorized rates became effective",
      "start_date": "2021-07-01",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-peco-r-2020-3018929-outcome",
      "source_url": "https://www.sec.gov/Archives/edgar/data/22606/000110935721000077/exc-20210804992.htm",
      "state": "PA",
      "utility_id": "utility-peco-gas",
      "utility_name": "PECO Gas",
      "docket_number": "R-2020-3018929"
    },
    {
      "id": "event-nj-bpu-er20120746-2021-07-14-final-order",
      "proceeding_id": "case-nj-bpu-er20120746",
      "event_type": "order_entered",
      "title": "Board adopted settlement",
      "start_date": "2021-07-14",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nj-bpu-er20120746-order",
      "source_url": "https://nj.gov/bpu/pdf/boardorders/2021/20210714/2B%20ORDER%20ACE%202020%20BRC.pdf",
      "state": "NJ",
      "utility_id": "utility-atlantic-city-electric",
      "utility_name": "Atlantic City Electric",
      "docket_number": "ER20120746"
    },
    {
      "id": "event-michigan-gas-utilities-u-20718-order",
      "proceeding_id": "case-michigan-gas-utilities-u-20718",
      "event_type": "order_entered",
      "title": "Final order issued",
      "start_date": "2021-09-09",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-michigan-gas-utilities-u-20718-official",
      "source_url": "https://www.michigan.gov/mpsc/-/media/Project/Websites/mpsc/regulatory/reports/annual/MPSC_2021_Annual_Report.pdf",
      "state": "MI",
      "utility_id": "utility-michigan-gas-utilities",
      "utility_name": "Michigan Gas Utilities",
      "docket_number": "U-20718"
    },
    {
      "id": "event-pa-puc-r-2021-3023618-2021-10-28-final-order",
      "proceeding_id": "case-pa-puc-r-2021-3023618",
      "event_type": "order_entered",
      "title": "Commission approved settlement",
      "start_date": "2021-10-28",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-ugi-r-2021-3023618-sec",
      "source_url": "https://www.sec.gov/Archives/edgar/data/884614/000088461423000046/ugi-20230331.htm",
      "state": "PA",
      "utility_id": "utility-ugi-electric",
      "utility_name": "UGI Electric",
      "docket_number": "R-2021-3023618"
    },
    {
      "id": "event-nj-bpu-er20020146-2021-11-01-rates-effective",
      "proceeding_id": "case-nj-bpu-er20020146",
      "event_type": "rates_effective",
      "title": "Revised base rates became effective",
      "start_date": "2021-11-01",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nj-bpu-er20020146-order",
      "source_url": "https://www.nj.gov/bpu/pdf/boardorders/2020/20201028/2B%20-%20ORDER%20JCP%26L%202020%20Base%20Rate%20Filing.pdf",
      "state": "NJ",
      "utility_id": "utility-jersey-central-power-light",
      "utility_name": "JCP&L",
      "docket_number": "ER20020146"
    },
    {
      "id": "event-epe-52195-rates-effective",
      "proceeding_id": "case-el-paso-electric-52195",
      "event_type": "rates_effective",
      "title": "Authorized rates effective",
      "start_date": "2021-11-03",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": "The September 15, 2022 final order applies the agreed rates to electricity consumed on and after November 3, 2021.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-epe-52195-final-order-page-8",
      "source_url": "https://interchange.puc.texas.gov/Documents/52195_620_1238994.PDF",
      "state": "TX",
      "utility_id": "utility-el-paso-electric",
      "utility_name": "El Paso Electric",
      "docket_number": "52195"
    },
    {
      "id": "event-pa-puc-r-2021-3023618-2021-11-09-rates-effective",
      "proceeding_id": "case-pa-puc-r-2021-3023618",
      "event_type": "rates_effective",
      "title": "Authorized rates became effective",
      "start_date": "2021-11-09",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-ugi-r-2021-3023618-sec",
      "source_url": "https://www.sec.gov/Archives/edgar/data/884614/000088461423000046/ugi-20230331.htm",
      "state": "PA",
      "utility_id": "utility-ugi-electric",
      "utility_name": "UGI Electric",
      "docket_number": "R-2021-3023618"
    },
    {
      "id": "event-nj-bpu-gr21030679-2021-11-17-final-order",
      "proceeding_id": "case-nj-bpu-gr21030679",
      "event_type": "order_entered",
      "title": "Board approved settlement",
      "start_date": "2021-11-17",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nj-bpu-gr21030679-order",
      "source_url": "https://www.nj.gov/bpu/bpu/pdf/boardorders/2021/20211117/2K%20ORDER%20NJNG%202021%20BRC.pdf",
      "state": "NJ",
      "utility_id": "utility-new-jersey-natural-gas",
      "utility_name": "New Jersey Natural Gas",
      "docket_number": "GR21030679"
    },
    {
      "id": "event-pa-puc-r-2021-3024601-2021-11-18-final-order",
      "proceeding_id": "case-pa-puc-r-2021-3024601",
      "event_type": "order_entered",
      "title": "Commission approved settlement",
      "start_date": "2021-11-18",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-peco-r-2021-3024601-outcome",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1109357/000110935722000076/R35.htm",
      "state": "PA",
      "utility_id": "utility-peco-electric",
      "utility_name": "PECO Electric",
      "docket_number": "R-2021-3024601"
    },
    {
      "id": "event-nj-bpu-er21050823-2021-12-15-final-order",
      "proceeding_id": "case-nj-bpu-er21050823",
      "event_type": "order_entered",
      "title": "Board approved settlement",
      "start_date": "2021-12-15",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nj-bpu-er21050823-order",
      "source_url": "https://www.nj.gov/bpu/bpu/pdf/boardorders/2021/20211215/2B%20ORDER%20RECO%202021%20BRC.pdf",
      "state": "NJ",
      "utility_id": "utility-rockland-electric",
      "utility_name": "Rockland Electric",
      "docket_number": "ER21050823"
    },
    {
      "id": "event-pa-puc-r-2021-3024296-2021-12-16-final-order",
      "proceeding_id": "case-pa-puc-r-2021-3024296",
      "event_type": "order_entered",
      "title": "Commission approved settlement",
      "start_date": "2021-12-16",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-pa-puc-r-2021-3024296-docket",
      "source_url": "https://www.puc.pa.gov/docket/R-2021-3024296",
      "state": "PA",
      "utility_id": "utility-columbia-gas-pa",
      "utility_name": "Columbia Gas of Pennsylvania",
      "docket_number": "R-2021-3024296"
    },
    {
      "id": "event-pa-puc-r-2021-3024750-2021-12-16-final-order",
      "proceeding_id": "case-pa-puc-r-2021-3024750",
      "event_type": "order_entered",
      "title": "Commission approved settlement",
      "start_date": "2021-12-16",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-pa-puc-r-2021-3024750-final-order",
      "source_url": "https://www.puc.pa.gov/pcdocs/1727976.docx",
      "state": "PA",
      "utility_id": "utility-duquesne-light",
      "utility_name": "Duquesne Light",
      "docket_number": "R-2021-3024750"
    },
    {
      "id": "event-nj-bpu-gr21121254-2021-12-28-filed",
      "proceeding_id": "case-nj-bpu-gr21121254",
      "event_type": "application_filed",
      "title": "Base rate petition filed",
      "start_date": "2021-12-28",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nj-bpu-gr21121254-order",
      "source_url": "https://www.nj.gov/bpu/pdf/boardorders/2022/20220817/2D%20ORDER%20ETG%20Base%20Rate%20Case.pdf",
      "state": "NJ",
      "utility_id": "utility-elizabethtown-gas",
      "utility_name": "Elizabethtown Gas",
      "docket_number": "GR21121254"
    },
    {
      "id": "event-pa-puc-r-2021-3024296-2021-12-29-rates-effective",
      "proceeding_id": "case-pa-puc-r-2021-3024296",
      "event_type": "rates_effective",
      "title": "Authorized rates became effective",
      "start_date": "2021-12-29",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-columbia-r-2021-3024296-sec",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1111711/000111171122000007/nix-20211231.htm",
      "state": "PA",
      "utility_id": "utility-columbia-gas-pa",
      "utility_name": "Columbia Gas of Pennsylvania",
      "docket_number": "R-2021-3024296"
    },
    {
      "id": "event-nj-bpu-er20120746-2022-01-01-rates-effective",
      "proceeding_id": "case-nj-bpu-er20120746",
      "event_type": "rates_effective",
      "title": "Revised base rates became effective",
      "start_date": "2022-01-01",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nj-bpu-er20120746-order",
      "source_url": "https://nj.gov/bpu/pdf/boardorders/2021/20210714/2B%20ORDER%20ACE%202020%20BRC.pdf",
      "state": "NJ",
      "utility_id": "utility-atlantic-city-electric",
      "utility_name": "Atlantic City Electric",
      "docket_number": "ER20120746"
    },
    {
      "id": "event-pa-puc-r-2021-3024601-2022-01-01-rates-effective",
      "proceeding_id": "case-pa-puc-r-2021-3024601",
      "event_type": "rates_effective",
      "title": "Authorized rates became effective",
      "start_date": "2022-01-01",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-peco-r-2021-3024601-outcome",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1109357/000110935722000076/R35.htm",
      "state": "PA",
      "utility_id": "utility-peco-electric",
      "utility_name": "PECO Electric",
      "docket_number": "R-2021-3024601"
    },
    {
      "id": "event-swepco-texas-51415-order",
      "proceeding_id": "case-swepco-texas-51415",
      "event_type": "order_entered",
      "title": "Final order issued",
      "start_date": "2022-01-14",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-swepco-texas-51415-official",
      "source_url": "https://interchange.puc.texas.gov/Search/Filings?ControlNumber=51415",
      "state": "TX",
      "utility_id": "utility-swepco-texas",
      "utility_name": "SWEPCO Texas",
      "docket_number": "51415"
    },
    {
      "id": "event-pa-puc-r-2021-3024750-2022-01-15-rates-effective",
      "proceeding_id": "case-pa-puc-r-2021-3024750",
      "event_type": "rates_effective",
      "title": "Authorized rates became effective",
      "start_date": "2022-01-15",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-duquesne-r-2021-3024750-outcome",
      "source_url": "https://newsroom.duquesnelight.com/duquesne-light-companys-proposed-rate-increase-approved-by-puc",
      "state": "PA",
      "utility_id": "utility-duquesne-light",
      "utility_name": "Duquesne Light",
      "docket_number": "R-2021-3024750"
    },
    {
      "id": "event-pa-puc-r-2021-3030218-2022-01-28-filed",
      "proceeding_id": "case-pa-puc-r-2021-3030218",
      "event_type": "application_filed",
      "title": "General rate application filed",
      "start_date": "2022-01-28",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-ugi-r-2021-3030218-history",
      "source_url": "https://www.ugi.com/rate-filing-old/past/",
      "state": "PA",
      "utility_id": "utility-ugi-gas",
      "utility_name": "UGI Gas",
      "docket_number": "R-2021-3030218"
    },
    {
      "id": "event-ga-psc-44280-opened-2022-02-04",
      "proceeding_id": "case-ga-gpc-44280",
      "event_type": "case_opened",
      "title": "Docket opened",
      "start_date": "2022-02-04",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-ga-psc-discovery-44280",
      "source_url": "https://psc.ga.gov/facts-advanced-search/docket/?docketId=44280",
      "state": "GA",
      "utility_id": "utility-georgia-power",
      "utility_name": "Georgia Power",
      "docket_number": "44280"
    },
    {
      "id": "event-pa-puc-r-2022-3031211-2022-03-18-filed",
      "proceeding_id": "case-pa-puc-r-2022-3031211",
      "event_type": "application_filed",
      "title": "General rate application filed",
      "start_date": "2022-03-18",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-columbia-r-2022-3031211-filing",
      "source_url": "https://investors.nisource.com/financial-news/news-details/2022/Columbia-Gas-of-Pennsylvania-Proposes-Further-Safety-Investments-Through-Aging-Infrastructure-Replacements-Upgrades/default.aspx",
      "state": "PA",
      "utility_id": "utility-columbia-gas-pa",
      "utility_name": "Columbia Gas of Pennsylvania",
      "docket_number": "R-2022-3031211"
    },
    {
      "id": "event-pa-puc-r-2022-3031113-2022-03-31-filed",
      "proceeding_id": "case-pa-puc-r-2022-3031113",
      "event_type": "application_filed",
      "title": "General rate application filed",
      "start_date": "2022-03-31",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-peco-r-2022-3031113-sec",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1109357/000110935723000018/exc-20221231.htm",
      "state": "PA",
      "utility_id": "utility-peco-gas",
      "utility_name": "PECO Gas",
      "docket_number": "R-2022-3031113"
    },
    {
      "id": "event-nj-bpu-gr22040253-2022-04-14-filed",
      "proceeding_id": "case-nj-bpu-gr22040253",
      "event_type": "application_filed",
      "title": "Base rate petition filed",
      "start_date": "2022-04-14",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nj-bpu-gr22040253-order",
      "source_url": "https://www.nj.gov/bpu/pdf/boardorders/2022/20221221/2E%20ORDER%20SJG%202022%20Base%20Rate%20Case.pdf",
      "state": "NJ",
      "utility_id": "utility-south-jersey-gas",
      "utility_name": "South Jersey Gas",
      "docket_number": "GR22040253"
    },
    {
      "id": "event-va-scc-pur-2022-00036-filed",
      "proceeding_id": "case-va-scc-pur-2022-00036",
      "event_type": "application_filed",
      "title": "General rate application filed",
      "start_date": "2022-04-29",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-va-scc-pur-2022-00036-final-order",
      "source_url": "https://www.scc.virginia.gov/docketsearch/DOCS/7s5q01%21.PDF",
      "state": "VA",
      "utility_id": "utility-columbia-gas-virginia",
      "utility_name": "Columbia Gas of Virginia",
      "docket_number": "PUR-2022-00036"
    },
    {
      "id": "event-tx-puct-53601-filed",
      "proceeding_id": "case-tx-puct-53601",
      "event_type": "application_filed",
      "title": "Base-rate application filed",
      "start_date": "2022-05-13",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-tx-puct-53601-application",
      "source_url": "https://interchange.puc.texas.gov/Documents/53601_1_1208302.PDF",
      "state": "TX",
      "utility_id": "utility-oncor",
      "utility_name": "Oncor",
      "docket_number": "53601"
    },
    {
      "id": "event-sps-texas-51802-order",
      "proceeding_id": "case-sps-texas-51802",
      "event_type": "order_entered",
      "title": "Final order issued",
      "start_date": "2022-05-20",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-sps-texas-51802-official",
      "source_url": "https://interchange.puc.texas.gov/Search/Filings?ControlNumber=51802",
      "state": "TX",
      "utility_id": "utility-sps-texas",
      "utility_name": "SPS Texas",
      "docket_number": "51802"
    },
    {
      "id": "event-old-dominion-power-pur-2021-00171-final-order",
      "proceeding_id": "case-old-dominion-power-pur-2021-00171",
      "event_type": "order_entered",
      "title": "Commission entered the final order approving the partial stipulation",
      "start_date": "2022-05-25",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-old-dominion-power-pur-2021-00171-mechanism-roe",
      "source_url": "https://www.scc.virginia.gov/docketsearch/DOCS/775g01!.PDF",
      "state": "VA",
      "utility_id": "utility-old-dominion-power",
      "utility_name": "Old Dominion Power",
      "docket_number": "PUR-2021-00171"
    },
    {
      "id": "event-nj-bpu-gr21121254-2022-08-17-final-order",
      "proceeding_id": "case-nj-bpu-gr21121254",
      "event_type": "order_entered",
      "title": "Board approved settlement",
      "start_date": "2022-08-17",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nj-bpu-gr21121254-order",
      "source_url": "https://www.nj.gov/bpu/pdf/boardorders/2022/20220817/2D%20ORDER%20ETG%20Base%20Rate%20Case.pdf",
      "state": "NJ",
      "utility_id": "utility-elizabethtown-gas",
      "utility_name": "Elizabethtown Gas",
      "docket_number": "GR21121254"
    },
    {
      "id": "event-markham-gas-os-22-00008970-final-order",
      "proceeding_id": "case-markham-gas-os-22-00008970",
      "event_type": "order_entered",
      "title": "Commission entered the final order approving the settlement",
      "start_date": "2022-08-30",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-markham-gas-os-22-00008970-capital-terms",
      "source_url": "https://apps.rrc.texas.gov/portal/s/ietrs-public-file-correspondence/a0yt0000003Rt9D/casedoc0000084298",
      "state": "TX",
      "utility_id": "utility-markham-gas",
      "utility_name": "Markham Gas",
      "docket_number": "OS-22-00008970"
    },
    {
      "id": "event-el-paso-electric-52195-order",
      "proceeding_id": "case-el-paso-electric-52195",
      "event_type": "order_entered",
      "title": "Final order issued",
      "start_date": "2022-09-15",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-el-paso-electric-52195-official",
      "source_url": "https://interchange.puc.texas.gov/Search/Filings?ControlNumber=52195",
      "state": "TX",
      "utility_id": "utility-el-paso-electric",
      "utility_name": "El Paso Electric",
      "docket_number": "52195"
    },
    {
      "id": "event-pa-puc-r-2021-3030218-2022-09-15-final-order",
      "proceeding_id": "case-pa-puc-r-2021-3030218",
      "event_type": "order_entered",
      "title": "Commission approved settlement",
      "start_date": "2022-09-15",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-ugi-r-2021-3030218-sec",
      "source_url": "https://www.sec.gov/Archives/edgar/data/884614/000088461423000046/ugi-20230331.htm",
      "state": "PA",
      "utility_id": "utility-ugi-gas",
      "utility_name": "UGI Gas",
      "docket_number": "R-2021-3030218"
    },
    {
      "id": "event-pa-puc-r-2022-3031113-2022-10-27-final-order",
      "proceeding_id": "case-pa-puc-r-2022-3031113",
      "event_type": "order_entered",
      "title": "Commission approved settlement",
      "start_date": "2022-10-27",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-pa-puc-r-2022-3031113-docket",
      "source_url": "https://www.puc.pa.gov/docket/R-2022-3031113",
      "state": "PA",
      "utility_id": "utility-peco-gas",
      "utility_name": "PECO Gas",
      "docket_number": "R-2022-3031113"
    },
    {
      "id": "event-pa-puc-r-2022-3035730-2022-10-28-filed",
      "proceeding_id": "case-pa-puc-r-2022-3035730",
      "event_type": "application_filed",
      "title": "General rate application filed",
      "start_date": "2022-10-28",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nfg-r-2022-3035730-filing",
      "source_url": "https://www.nationalfuel.com/news/puc-schedules-public-input-hearings-on-rate-increase-request-by-national-fuel-gas-distribution-corporation/",
      "state": "PA",
      "utility_id": "utility-national-fuel-gas-pa",
      "utility_name": "National Fuel Gas",
      "docket_number": "R-2022-3035730"
    },
    {
      "id": "event-pa-puc-r-2021-3030218-2022-10-29-rates-effective",
      "proceeding_id": "case-pa-puc-r-2021-3030218",
      "event_type": "rates_effective",
      "title": "First authorized rate phase became effective",
      "start_date": "2022-10-29",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-ugi-r-2021-3030218-sec",
      "source_url": "https://www.sec.gov/Archives/edgar/data/884614/000088461423000046/ugi-20230331.htm",
      "state": "PA",
      "utility_id": "utility-ugi-gas",
      "utility_name": "UGI Gas",
      "docket_number": "R-2021-3030218"
    },
    {
      "id": "event-pa-puc-r-2022-3031211-2022-12-08-final-order",
      "proceeding_id": "case-pa-puc-r-2022-3031211",
      "event_type": "order_entered",
      "title": "Commission entered final order",
      "start_date": "2022-12-08",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-columbia-r-2022-3031211-court",
      "source_url": "https://www.pacourts.us/assets/opinions/Commonwealth/out/90CD23_9-30-24.pdf",
      "state": "PA",
      "utility_id": "utility-columbia-gas-pa",
      "utility_name": "Columbia Gas of Pennsylvania",
      "docket_number": "R-2022-3031211"
    },
    {
      "id": "event-nj-bpu-gr22040253-2022-12-21-final-order",
      "proceeding_id": "case-nj-bpu-gr22040253",
      "event_type": "order_entered",
      "title": "Board approved settlement",
      "start_date": "2022-12-21",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nj-bpu-gr22040253-order",
      "source_url": "https://www.nj.gov/bpu/pdf/boardorders/2022/20221221/2E%20ORDER%20SJG%202022%20Base%20Rate%20Case.pdf",
      "state": "NJ",
      "utility_id": "utility-south-jersey-gas",
      "utility_name": "South Jersey Gas",
      "docket_number": "GR22040253"
    },
    {
      "id": "event-pa-puc-r-2022-3031113-2023-01-01-rates-effective",
      "proceeding_id": "case-pa-puc-r-2022-3031113",
      "event_type": "rates_effective",
      "title": "Authorized rates became effective",
      "start_date": "2023-01-01",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-peco-r-2022-3031113-sec",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1109357/000110935723000018/exc-20221231.htm",
      "state": "PA",
      "utility_id": "utility-peco-gas",
      "utility_name": "PECO Gas",
      "docket_number": "R-2022-3031113"
    },
    {
      "id": "event-pa-puc-r-2022-3037368-2023-01-27-filed",
      "proceeding_id": "case-pa-puc-r-2022-3037368",
      "event_type": "application_filed",
      "title": "General rate application filed",
      "start_date": "2023-01-27",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-ugi-r-2022-3037368-history",
      "source_url": "https://www.ugi.com/rate-filing-old/past/",
      "state": "PA",
      "utility_id": "utility-ugi-electric",
      "utility_name": "UGI Electric",
      "docket_number": "R-2022-3037368"
    },
    {
      "id": "event-nj-bpu-er23020091-2023-02-15-filed",
      "proceeding_id": "case-nj-bpu-er23020091",
      "event_type": "application_filed",
      "title": "Base rate petition filed",
      "start_date": "2023-02-15",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nj-bpu-er23020091-order",
      "source_url": "https://www.nj.gov/bpu/pdf/boardorders/2023/20231117/2A%20ORDER%20ACE%20Base%20Rate%20Case.pdf",
      "state": "NJ",
      "utility_id": "utility-atlantic-city-electric",
      "utility_name": "Atlantic City Electric",
      "docket_number": "ER23020091"
    },
    {
      "id": "event-onalaska-water-gas-os-22-00010576-final-order",
      "proceeding_id": "case-onalaska-water-gas-os-22-00010576",
      "event_type": "order_entered",
      "title": "Commission entered the final order approving the settlement",
      "start_date": "2023-02-28",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-onalaska-water-gas-os-22-00010576-capital-terms",
      "source_url": "https://apps.rrc.texas.gov/portal/s/ietrs-public-file-correspondence/a0y8z000000EsNj/casedoc0000096290",
      "state": "TX",
      "utility_id": "utility-onalaska-water-gas",
      "utility_name": "Onalaska Water and Gas",
      "docket_number": "OS-22-00010576"
    },
    {
      "id": "event-nj-bpu-er23030144-2023-03-16-filed",
      "proceeding_id": "case-nj-bpu-er23030144",
      "event_type": "application_filed",
      "title": "Base rate petition filed",
      "start_date": "2023-03-16",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nj-bpu-er23030144-order",
      "source_url": "https://www.nj.gov/bpu/pdf/boardorders/2024/20240214/2B%20ORDER%20JCP%26L%20Base%20Rate%20Case.pdf",
      "state": "NJ",
      "utility_id": "utility-jersey-central-power-light",
      "utility_name": "JCP&L",
      "docket_number": "ER23030144"
    },
    {
      "id": "event-tx-puct-53601-final-order",
      "proceeding_id": "case-tx-puct-53601",
      "event_type": "order_entered",
      "title": "Final order issued",
      "start_date": "2023-04-06",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-tx-puct-53601-order-rehearing",
      "source_url": "https://interchange.puc.texas.gov/Documents/53601_937_1303321.PDF",
      "state": "TX",
      "utility_id": "utility-oncor",
      "utility_name": "Oncor",
      "docket_number": "53601"
    },
    {
      "id": "event-va-scc-pur-2022-00036-final-order",
      "proceeding_id": "case-va-scc-pur-2022-00036",
      "event_type": "order_entered",
      "title": "Final order approving stipulation",
      "start_date": "2023-05-15",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-va-scc-pur-2022-00036-final-order",
      "source_url": "https://www.scc.virginia.gov/docketsearch/DOCS/7s5q01%21.PDF",
      "state": "VA",
      "utility_id": "utility-columbia-gas-virginia",
      "utility_name": "Columbia Gas of Virginia",
      "docket_number": "PUR-2022-00036"
    },
    {
      "id": "event-va-scc-pur-2022-00036-rates-effective",
      "proceeding_id": "case-va-scc-pur-2022-00036",
      "event_type": "rates_effective",
      "title": "Compliance tariffs effective",
      "start_date": "2023-05-31",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-va-columbia-pur-2022-00036-tariff",
      "source_url": "https://www.columbiagasva.com/docs/librariesprovider10/rates-and-tariffs/virginia-tariff.pdf",
      "state": "VA",
      "utility_id": "utility-columbia-gas-virginia",
      "utility_name": "Columbia Gas of Virginia",
      "docket_number": "PUR-2022-00036"
    },
    {
      "id": "event-pa-puc-r-2022-3035730-2023-06-15-final-order",
      "proceeding_id": "case-pa-puc-r-2022-3035730",
      "event_type": "order_entered",
      "title": "Commission approved settlement",
      "start_date": "2023-06-15",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nfg-r-2022-3035730-outcome",
      "source_url": "https://www.nationalfuel.com/news/settlement-approved-for-delivery-charge-increases-in-pa/",
      "state": "PA",
      "utility_id": "utility-national-fuel-gas-pa",
      "utility_name": "National Fuel Gas",
      "docket_number": "R-2022-3035730"
    },
    {
      "id": "event-tx-puct-53601-rehearing-order",
      "proceeding_id": "case-tx-puct-53601",
      "event_type": "rehearing_decision",
      "title": "Order on rehearing issued",
      "start_date": "2023-06-30",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-tx-puct-53601-order-rehearing",
      "source_url": "https://interchange.puc.texas.gov/Documents/53601_937_1303321.PDF",
      "state": "TX",
      "utility_id": "utility-oncor",
      "utility_name": "Oncor",
      "docket_number": "53601"
    },
    {
      "id": "event-pa-puc-r-2022-3035730-2023-08-01-rates-effective",
      "proceeding_id": "case-pa-puc-r-2022-3035730",
      "event_type": "rates_effective",
      "title": "Authorized rates became effective",
      "start_date": "2023-08-01",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nfg-r-2022-3035730-outcome",
      "source_url": "https://www.nationalfuel.com/news/settlement-approved-for-delivery-charge-increases-in-pa/",
      "state": "PA",
      "utility_id": "utility-national-fuel-gas-pa",
      "utility_name": "National Fuel Gas",
      "docket_number": "R-2022-3035730"
    },
    {
      "id": "event-t-and-l-gas-os-23-00012594-final-order",
      "proceeding_id": "case-t-and-l-gas-os-23-00012594",
      "event_type": "order_entered",
      "title": "Commission entered the final order approving the settlement",
      "start_date": "2023-08-22",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-t-and-l-gas-os-23-00012594-capital-terms",
      "source_url": "https://apps.rrc.texas.gov/portal/s/ietrs-public-file-correspondence/a0y8z000000LGUS/casedoc0000109122",
      "state": "TX",
      "utility_id": "utility-t-and-l-gas",
      "utility_name": "T & L Gas",
      "docket_number": "OS-23-00012594"
    },
    {
      "id": "event-entergy-texas-53719-order",
      "proceeding_id": "case-entergy-texas-53719",
      "event_type": "order_entered",
      "title": "Final order issued",
      "start_date": "2023-08-24",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-entergy-texas-53719-official",
      "source_url": "https://interchange.puc.texas.gov/Search/Filings?ControlNumber=53719",
      "state": "TX",
      "utility_id": "utility-entergy-texas",
      "utility_name": "Entergy Texas",
      "docket_number": "53719"
    },
    {
      "id": "event-case-la-entergy-u-36959-opened",
      "proceeding_id": "case-la-entergy-u-36959",
      "event_type": "application_filed",
      "title": "Application filed",
      "start_date": "2023-09-01",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-la-discovery-u-36959",
      "source_url": "https://lpscpubvalence.lpsc.louisiana.gov/portal/PSC/DocketDetails?docketId=31370",
      "state": "LA",
      "utility_id": "utility-entergy-louisiana",
      "utility_name": "Entergy Louisiana",
      "docket_number": "U-36959"
    },
    {
      "id": "event-southwestern-virginia-gas-pur-2022-00196-order",
      "proceeding_id": "case-southwestern-virginia-gas-pur-2022-00196",
      "event_type": "order_entered",
      "title": "Final order issued",
      "start_date": "2023-09-08",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-southwestern-virginia-gas-pur-2022-00196-official",
      "source_url": "https://www.scc.virginia.gov/media/sccvirginiagov-home/about-the-scc/annual-reports/2023AR.pdf",
      "state": "VA",
      "utility_id": "utility-southwestern-virginia-gas",
      "utility_name": "Southwestern Virginia Gas",
      "docket_number": "PUR-2022-00196"
    },
    {
      "id": "event-sienergy-os-23-00013504-final-order",
      "proceeding_id": "case-sienergy-os-23-00013504",
      "event_type": "order_entered",
      "title": "Commission entered the final order approving the unanimous settlement",
      "start_date": "2023-09-19",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-sienergy-os-23-00013504-black-box-omissions",
      "source_url": "https://apps.rrc.texas.gov/portal/s/ietrs-public-file-correspondence/a0y8z000000Lzb8/casedoc0000111018",
      "state": "TX",
      "utility_id": "utility-sienergy",
      "utility_name": "SiEnergy",
      "docket_number": "OS-23-00013504"
    },
    {
      "id": "event-pa-puc-r-2022-3037368-2023-09-21-final-order",
      "proceeding_id": "case-pa-puc-r-2022-3037368",
      "event_type": "order_entered",
      "title": "Commission approved settlement",
      "start_date": "2023-09-21",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-ugi-r-2022-3037368-sec",
      "source_url": "https://www.sec.gov/Archives/edgar/data/884614/000088461425000053/ugi-20250930.htm",
      "state": "PA",
      "utility_id": "utility-ugi-electric",
      "utility_name": "UGI Electric",
      "docket_number": "R-2022-3037368"
    },
    {
      "id": "event-pa-puc-r-2022-3037368-2023-10-01-rates-effective",
      "proceeding_id": "case-pa-puc-r-2022-3037368",
      "event_type": "rates_effective",
      "title": "Authorized rates became effective",
      "start_date": "2023-10-01",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-ugi-r-2022-3037368-sec",
      "source_url": "https://www.sec.gov/Archives/edgar/data/884614/000088461425000053/ugi-20250930.htm",
      "state": "PA",
      "utility_id": "utility-ugi-electric",
      "utility_name": "UGI Electric",
      "docket_number": "R-2022-3037368"
    },
    {
      "id": "event-nj-bpu-er23020091-2023-11-17-final-order",
      "proceeding_id": "case-nj-bpu-er23020091",
      "event_type": "order_entered",
      "title": "Board approved settlement",
      "start_date": "2023-11-17",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nj-bpu-er23020091-order",
      "source_url": "https://www.nj.gov/bpu/pdf/boardorders/2023/20231117/2A%20ORDER%20ACE%20Base%20Rate%20Case.pdf",
      "state": "NJ",
      "utility_id": "utility-atlantic-city-electric",
      "utility_name": "Atlantic City Electric",
      "docket_number": "ER23020091"
    },
    {
      "id": "event-appalachian-power-pur-2023-00002-order",
      "proceeding_id": "case-appalachian-power-pur-2023-00002",
      "event_type": "order_entered",
      "title": "Final order issued",
      "start_date": "2023-11-30",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-appalachian-power-pur-2023-00002-official",
      "source_url": "https://www.scc.virginia.gov/media/sccvirginiagov-home/about-the-scc/annual-reports/2023AR.pdf",
      "state": "VA",
      "utility_id": "utility-appalachian-power-va",
      "utility_name": "Appalachian Power",
      "docket_number": "PUR-2023-00002"
    },
    {
      "id": "event-roanoke-gas-pur-2022-00205-order",
      "proceeding_id": "case-roanoke-gas-pur-2022-00205",
      "event_type": "order_entered",
      "title": "Final order issued",
      "start_date": "2023-12-19",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-roanoke-gas-pur-2022-00205-official",
      "source_url": "https://www.scc.virginia.gov/media/sccvirginiagov-home/about-the-scc/annual-reports/2023AR.pdf",
      "state": "VA",
      "utility_id": "utility-roanoke-gas",
      "utility_name": "Roanoke Gas",
      "docket_number": "PUR-2022-00205"
    },
    {
      "id": "event-nj-bpu-er23120924-2023-12-29-filed",
      "proceeding_id": "case-nj-bpu-er23120924",
      "event_type": "application_filed",
      "title": "Electric base rate petition filed",
      "start_date": "2023-12-29",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nj-bpu-er23120924-order",
      "source_url": "https://nj.gov/bpu/pdf/boardorders/2024/20241009/2A%20ORDER%20PS%2023%20BRC.pdf",
      "state": "NJ",
      "utility_id": "utility-pseg-electric",
      "utility_name": "PSE&G Electric",
      "docket_number": "ER23120924"
    },
    {
      "id": "event-nj-bpu-gr23120925-2023-12-29-filed",
      "proceeding_id": "case-nj-bpu-gr23120925",
      "event_type": "application_filed",
      "title": "Gas base rate petition filed",
      "start_date": "2023-12-29",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nj-bpu-gr23120925-order",
      "source_url": "https://nj.gov/bpu/pdf/boardorders/2024/20241009/2A%20ORDER%20PS%2023%20BRC.pdf",
      "state": "NJ",
      "utility_id": "utility-pseg-gas",
      "utility_name": "PSE&G Gas",
      "docket_number": "GR23120925"
    },
    {
      "id": "event-pa-puc-r-2023-3044549-2023-12-29-filed",
      "proceeding_id": "case-pa-puc-r-2023-3044549",
      "event_type": "application_filed",
      "title": "General rate application filed",
      "start_date": "2023-12-29",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-peoples-r-2023-3044549-sec",
      "source_url": "https://www.sec.gov/Archives/edgar/data/78128/000156276225000189/wtrg-20250630x10q.htm",
      "state": "PA",
      "utility_id": "utility-peoples-natural-gas",
      "utility_name": "Peoples Natural Gas",
      "docket_number": "R-2023-3044549"
    },
    {
      "id": "event-pa-puc-discovery-r-2023-3044549-posted",
      "proceeding_id": "case-pa-puc-r-2023-3044549",
      "event_type": "case_posted",
      "title": "Rate increase filing posted by Commission",
      "start_date": "2024-01-02",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-pa-puc-discovery-r-2023-3044549",
      "source_url": "https://www.puc.pa.gov/docket/R-2023-3044549",
      "state": "PA",
      "utility_id": "utility-peoples-natural-gas",
      "utility_name": "Peoples Natural Gas",
      "docket_number": "R-2023-3044549"
    },
    {
      "id": "event-coserv-gas-os-23-00014771-final-order",
      "proceeding_id": "case-coserv-gas-os-23-00014771",
      "event_type": "order_entered",
      "title": "Commission entered the final order approving the settlement",
      "start_date": "2024-01-30",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-coserv-gas-os-23-00014771-capital-terms",
      "source_url": "https://apps.rrc.texas.gov/portal/s/ietrs-public-file-correspondence/a0y8z000000P7AC/casedoc0000120079",
      "state": "TX",
      "utility_id": "utility-coserv-gas",
      "utility_name": "CoServ Gas",
      "docket_number": "OS-23-00014771"
    },
    {
      "id": "event-nj-bpu-gr24010071-2024-01-31-filed",
      "proceeding_id": "case-nj-bpu-gr24010071",
      "event_type": "application_filed",
      "title": "Base rate petition filed",
      "start_date": "2024-01-31",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nj-bpu-gr24010071-order",
      "source_url": "https://www.nj.gov/bpu/pdf/boardorders/2024/20241121/2B%20ORDER%20NJNG%20Base%20Rate%20Case.pdf",
      "state": "NJ",
      "utility_id": "utility-new-jersey-natural-gas",
      "utility_name": "New Jersey Natural Gas",
      "docket_number": "GR24010071"
    },
    {
      "id": "event-nj-bpu-er23020091-2024-02-01-rates-effective",
      "proceeding_id": "case-nj-bpu-er23020091",
      "event_type": "rates_effective",
      "title": "Second phase of revised base rates became effective",
      "start_date": "2024-02-01",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nj-bpu-er23020091-order",
      "source_url": "https://www.nj.gov/bpu/pdf/boardorders/2023/20231117/2A%20ORDER%20ACE%20Base%20Rate%20Case.pdf",
      "state": "NJ",
      "utility_id": "utility-atlantic-city-electric",
      "utility_name": "Atlantic City Electric",
      "docket_number": "ER23020091"
    },
    {
      "id": "event-columbia-case-opened",
      "proceeding_id": "case-pa-puc-r-2024-3046519",
      "event_type": "case_opened",
      "title": "Commission docket opened",
      "start_date": "2024-02-14",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-pa-puc-discovery-r-2024-3046519",
      "source_url": "https://www.puc.pa.gov/docket/R-2024-3046519",
      "state": "PA",
      "utility_id": "utility-columbia-gas-pa",
      "utility_name": "Columbia Gas of Pennsylvania",
      "docket_number": "R-2024-3046519"
    },
    {
      "id": "event-nj-bpu-er23030144-2024-02-14-final-order",
      "proceeding_id": "case-nj-bpu-er23030144",
      "event_type": "order_entered",
      "title": "Board approved settlement",
      "start_date": "2024-02-14",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nj-bpu-er23030144-order",
      "source_url": "https://www.nj.gov/bpu/pdf/boardorders/2024/20240214/2B%20ORDER%20JCP%26L%20Base%20Rate%20Case.pdf",
      "state": "NJ",
      "utility_id": "utility-jersey-central-power-light",
      "utility_name": "JCP&L",
      "docket_number": "ER23030144"
    },
    {
      "id": "event-nj-bpu-gr24020158-2024-02-29-filed",
      "proceeding_id": "case-nj-bpu-gr24020158",
      "event_type": "application_filed",
      "title": "Base rate petition filed",
      "start_date": "2024-02-29",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nj-bpu-gr24020158-order",
      "source_url": "https://www.nj.gov/bpu/pdf/boardorders/2024/20241121/2C%20ORDER%20ETG%20Base%20Rate%20Case.pdf",
      "state": "NJ",
      "utility_id": "utility-elizabethtown-gas",
      "utility_name": "Elizabethtown Gas",
      "docket_number": "GR24020158"
    },
    {
      "id": "event-consumers-energy-u-21389-order",
      "proceeding_id": "case-consumers-energy-u-21389",
      "event_type": "order_entered",
      "title": "Final order issued",
      "start_date": "2024-03-01",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-consumers-energy-u-21389-official",
      "source_url": "https://www.michigan.gov/mpsc/-/media/Project/Websites/mpsc/regulatory/reports/annual/MPSC_2024_Annual_Report.pdf",
      "state": "MI",
      "utility_id": "utility-consumers-energy",
      "utility_name": "Consumers Energy",
      "docket_number": "U-21389"
    },
    {
      "id": "event-pa-puc-r-2024-3046523-2024-03-20-filed",
      "proceeding_id": "case-pa-puc-r-2024-3046523",
      "event_type": "application_filed",
      "title": "General rate application filed",
      "start_date": "2024-03-20",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-duquesne-r-2024-3046523-filing",
      "source_url": "https://newsroom.duquesnelight.com/duquesne-light-company-making-prudent-investments-to-better-serve-customers-and-local-communities",
      "state": "PA",
      "utility_id": "utility-duquesne-light",
      "utility_name": "Duquesne Light",
      "docket_number": "R-2024-3046523"
    },
    {
      "id": "event-pa-puc-r-2024-3046931-2024-03-28-filed",
      "proceeding_id": "case-pa-puc-r-2024-3046931",
      "event_type": "application_filed",
      "title": "General rate application filed",
      "start_date": "2024-03-28",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-peco-r-2024-3046931-sec",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1109357/000110935725000041/exc-20250212ex992.htm",
      "state": "PA",
      "utility_id": "utility-peco-electric",
      "utility_name": "PECO Electric",
      "docket_number": "R-2024-3046931"
    },
    {
      "id": "event-pa-puc-r-2024-3046932-2024-03-28-filed",
      "proceeding_id": "case-pa-puc-r-2024-3046932",
      "event_type": "application_filed",
      "title": "General rate application filed",
      "start_date": "2024-03-28",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-peco-r-2024-3046932-sec",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1109357/000110935725000078/exc-20241231ars.pdf",
      "state": "PA",
      "utility_id": "utility-peco-gas",
      "utility_name": "PECO Gas",
      "docket_number": "R-2024-3046932"
    },
    {
      "id": "event-pa-puc-r-2024-3047068-2024-04-02-filed",
      "proceeding_id": "case-pa-puc-r-2024-3047068",
      "event_type": "application_filed",
      "title": "Consolidated general rate application filed",
      "start_date": "2024-04-02",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-firstenergy-r-2024-3047068-sec",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1031296/000103129624000043/fe-20240630.htm",
      "state": "PA",
      "utility_id": "utility-firstenergy-pa",
      "utility_name": "FirstEnergy Pennsylvania",
      "docket_number": "R-2024-3047068"
    },
    {
      "id": "event-sps-texas-54634-final-order",
      "proceeding_id": "case-sps-texas-54634",
      "event_type": "final_order",
      "title": "PUCT entered final order approving the unopposed agreement",
      "start_date": "2024-04-11",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-sps-texas-54634-authorized-capital-return",
      "source_url": "https://interchange.puc.texas.gov/Documents/54634_569_1382374.PDF",
      "state": "TX",
      "utility_id": "utility-sps-texas",
      "utility_name": "SPS Texas",
      "docket_number": "54634"
    },
    {
      "id": "event-atmos-virginia-pur-2023-00008-order",
      "proceeding_id": "case-atmos-virginia-pur-2023-00008",
      "event_type": "order_entered",
      "title": "Final order issued",
      "start_date": "2024-05-13",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-atmos-virginia-pur-2023-00008-official",
      "source_url": "https://www.scc.virginia.gov/media/sccvirginiagov-home/about-the-scc/annual-reports/2024AR.pdf",
      "state": "VA",
      "utility_id": "utility-atmos-virginia",
      "utility_name": "Atmos Energy Virginia",
      "docket_number": "PUR-2023-00008"
    },
    {
      "id": "event-mi-mpsc-u-21585-filed",
      "proceeding_id": "case-mi-mpsc-u-21585",
      "event_type": "application_filed",
      "title": "Electric rate application filed",
      "start_date": "2024-05-31",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-mi-mpsc-u-21585-order-summary",
      "source_url": "https://www.michigan.gov/mpsc/commission/news-releases/2025/03/21/commission-approves-%24153-8m-for-consumers-energy-to-improve-grid-reliability",
      "state": "MI",
      "utility_id": "utility-consumers-energy",
      "utility_name": "Consumers Energy",
      "docket_number": "U-21585"
    },
    {
      "id": "event-oh-puco-24-468-el-air-filed",
      "proceeding_id": "case-oh-puco-24-468-el-air",
      "event_type": "application_filed",
      "title": "Distribution rate application filed",
      "start_date": "2024-05-31",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-oh-puco-24-468-el-air-rehearing",
      "source_url": "https://content.govdelivery.com/accounts/OHPUC/bulletins/40a718d",
      "state": "OH",
      "utility_id": "utility-ohio-edison",
      "utility_name": "Ohio Edison",
      "docket_number": "24-0468-EL-AIR"
    },
    {
      "id": "event-nj-bpu-er23030144-2024-06-01-rates-effective",
      "proceeding_id": "case-nj-bpu-er23030144",
      "event_type": "rates_effective",
      "title": "Revised base rates became effective",
      "start_date": "2024-06-01",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nj-bpu-er23030144-order",
      "source_url": "https://www.nj.gov/bpu/pdf/boardorders/2024/20240214/2B%20ORDER%20JCP%26L%20Base%20Rate%20Case.pdf",
      "state": "NJ",
      "utility_id": "utility-jersey-central-power-light",
      "utility_name": "JCP&L",
      "docket_number": "ER23030144"
    },
    {
      "id": "event-centerpoint-entex-os-23-00015513-final-order",
      "proceeding_id": "case-centerpoint-entex-os-23-00015513",
      "event_type": "order_entered",
      "title": "Commission entered the final order approving the settlement",
      "start_date": "2024-06-25",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-centerpoint-entex-os-23-00015513-capital-terms",
      "source_url": "https://apps.rrc.texas.gov/portal/s/ietrs-public-file-correspondence/a0y8z000000UQ61/casedoc0000130467",
      "state": "TX",
      "utility_id": "utility-centerpoint-entex",
      "utility_name": "CenterPoint Entex",
      "docket_number": "OS-23-00015513"
    },
    {
      "id": "event-indiana-michigan-power-u-21461-order",
      "proceeding_id": "case-indiana-michigan-power-u-21461",
      "event_type": "order_entered",
      "title": "Final order issued",
      "start_date": "2024-07-02",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-indiana-michigan-power-u-21461-official",
      "source_url": "https://www.michigan.gov/mpsc/-/media/Project/Websites/mpsc/regulatory/reports/annual/MPSC_2024_Annual_Report.pdf",
      "state": "MI",
      "utility_id": "utility-indiana-michigan-power",
      "utility_name": "Indiana Michigan Power",
      "docket_number": "U-21461"
    },
    {
      "id": "event-alpena-power-u-21488-order",
      "proceeding_id": "case-alpena-power-u-21488",
      "event_type": "order_entered",
      "title": "Final order issued",
      "start_date": "2024-07-23",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-alpena-power-u-21488-official",
      "source_url": "https://www.michigan.gov/mpsc/-/media/Project/Websites/mpsc/regulatory/reports/annual/MPSC_2024_Annual_Report.pdf",
      "state": "MI",
      "utility_id": "utility-alpena-power",
      "utility_name": "Alpena Power",
      "docket_number": "U-21488"
    },
    {
      "id": "event-consumers-energy-u-21490-order",
      "proceeding_id": "case-consumers-energy-u-21490",
      "event_type": "order_entered",
      "title": "Final order issued",
      "start_date": "2024-07-23",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-consumers-energy-u-21490-official",
      "source_url": "https://www.michigan.gov/mpsc/-/media/Project/Websites/mpsc/regulatory/reports/annual/MPSC_2024_Annual_Report.pdf",
      "state": "MI",
      "utility_id": "utility-consumers-energy",
      "utility_name": "Consumers Energy",
      "docket_number": "U-21490"
    },
    {
      "id": "event-pa-puc-r-2023-3044549-2024-09-12-final-order",
      "proceeding_id": "case-pa-puc-r-2023-3044549",
      "event_type": "order_entered",
      "title": "Commission approved settlement",
      "start_date": "2024-09-12",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-pa-puc-r-2023-3044549-docket",
      "source_url": "https://www.puc.pa.gov/docket/R-2023-3044549",
      "state": "PA",
      "utility_id": "utility-peoples-natural-gas",
      "utility_name": "Peoples Natural Gas",
      "docket_number": "R-2023-3044549"
    },
    {
      "id": "event-michigan-gas-utilities-u-21540-order",
      "proceeding_id": "case-michigan-gas-utilities-u-21540",
      "event_type": "order_entered",
      "title": "Final order issued",
      "start_date": "2024-09-26",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-michigan-gas-utilities-u-21540-official",
      "source_url": "https://www.michigan.gov/mpsc/-/media/Project/Websites/mpsc/regulatory/reports/annual/MPSC_2024_Annual_Report.pdf",
      "state": "MI",
      "utility_id": "utility-michigan-gas-utilities",
      "utility_name": "Michigan Gas Utilities",
      "docket_number": "U-21540"
    },
    {
      "id": "event-uppco-u-21555-order",
      "proceeding_id": "case-uppco-u-21555",
      "event_type": "order_entered",
      "title": "Final order issued",
      "start_date": "2024-09-26",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-uppco-u-21555-official",
      "source_url": "https://www.michigan.gov/mpsc/-/media/Project/Websites/mpsc/regulatory/reports/annual/MPSC_2024_Annual_Report.pdf",
      "state": "MI",
      "utility_id": "utility-uppco",
      "utility_name": "UPPCO",
      "docket_number": "U-21555"
    },
    {
      "id": "event-uppco-u21555-order-entered",
      "proceeding_id": "case-uppco-u-21555",
      "event_type": "order_entered",
      "title": "MPSC approved the UPPCO settlement",
      "start_date": "2024-09-26",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-uppco-u22032-summary-page-2",
      "source_url": "https://mi-psc.my.site.com/sfc/servlet.shepherd/version/download/068cs0000222MgoAAE",
      "state": "MI",
      "utility_id": "utility-uppco",
      "utility_name": "UPPCO",
      "docket_number": "U-21555"
    },
    {
      "id": "event-pa-puc-r-2023-3044549-2024-09-27-rates-effective",
      "proceeding_id": "case-pa-puc-r-2023-3044549",
      "event_type": "rates_effective",
      "title": "Authorized rates became effective",
      "start_date": "2024-09-27",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-peoples-r-2023-3044549-sec",
      "source_url": "https://www.sec.gov/Archives/edgar/data/78128/000156276225000189/wtrg-20250630x10q.htm",
      "state": "PA",
      "utility_id": "utility-peoples-natural-gas",
      "utility_name": "Peoples Natural Gas",
      "docket_number": "R-2023-3044549"
    },
    {
      "id": "event-columbia-gas-va-pur-2024-00030-rates-effective",
      "proceeding_id": "case-columbia-gas-virginia-pur-2024-00030",
      "event_type": "rates_effective",
      "title": "Interim base rates took effect",
      "start_date": "2024-10-01",
      "end_date": null,
      "date_precision": "month",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": "Effective with the first billing unit of October 2024; later made final subject to ordered refunds.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-columbia-gas-va-pur-2024-00030-pages-2-3",
      "source_url": "https://www.scc.virginia.gov/docketsearch/DOCS/85l401%21.PDF",
      "state": "VA",
      "utility_id": "utility-columbia-gas-virginia",
      "utility_name": "Columbia Gas of Virginia",
      "docket_number": "PUR-2024-00030"
    },
    {
      "id": "event-nj-bpu-er23120924-2024-10-09-final-order",
      "proceeding_id": "case-nj-bpu-er23120924",
      "event_type": "order_entered",
      "title": "Board approved combined PSE&G settlement",
      "start_date": "2024-10-09",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nj-bpu-er23120924-order",
      "source_url": "https://nj.gov/bpu/pdf/boardorders/2024/20241009/2A%20ORDER%20PS%2023%20BRC.pdf",
      "state": "NJ",
      "utility_id": "utility-pseg-electric",
      "utility_name": "PSE&G Electric",
      "docket_number": "ER23120924"
    },
    {
      "id": "event-nj-bpu-gr23120925-2024-10-09-final-order",
      "proceeding_id": "case-nj-bpu-gr23120925",
      "event_type": "order_entered",
      "title": "Board approved combined PSE&G settlement",
      "start_date": "2024-10-09",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nj-bpu-gr23120925-order",
      "source_url": "https://nj.gov/bpu/pdf/boardorders/2024/20241009/2A%20ORDER%20PS%2023%20BRC.pdf",
      "state": "NJ",
      "utility_id": "utility-pseg-gas",
      "utility_name": "PSE&G Gas",
      "docket_number": "GR23120925"
    },
    {
      "id": "event-umerc-u-21541-final-order",
      "proceeding_id": "case-umerc-u-21541",
      "event_type": "order_entered",
      "title": "MPSC approved the UMERC rate-case settlement",
      "start_date": "2024-10-10",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-umerc-u-21541-current-economics",
      "source_url": "https://www.sec.gov/Archives/edgar/data/783325/000010781524000248/wec-20240930.htm",
      "state": "MI",
      "utility_id": "utility-umerc",
      "utility_name": "UMERC",
      "docket_number": "U-21541"
    },
    {
      "id": "event-oh-puco-24-832-ga-air-filed",
      "proceeding_id": "case-oh-puco-24-832-ga-air",
      "event_type": "application_filed",
      "title": "Gas distribution rate application filed",
      "start_date": "2024-10-29",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-oh-centerpoint-24-832-ga-air-rate-review",
      "source_url": "https://www.centerpointenergy.com/en-us/Corp/Pages/Ohio-Rate-Case.aspx",
      "state": "OH",
      "utility_id": "utility-centerpoint-energy-ohio",
      "utility_name": "CenterPoint Energy Ohio",
      "docket_number": "24-0832-GA-AIR"
    },
    {
      "id": "event-dte-gas-u-21291-order",
      "proceeding_id": "case-dte-gas-u-21291",
      "event_type": "order_entered",
      "title": "Final order issued",
      "start_date": "2024-11-07",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-dte-gas-u-21291-official",
      "source_url": "https://www.michigan.gov/mpsc/-/media/Project/Websites/mpsc/regulatory/reports/annual/MPSC_2024_Annual_Report.pdf",
      "state": "MI",
      "utility_id": "utility-dte-gas",
      "utility_name": "DTE Gas",
      "docket_number": "U-21291"
    },
    {
      "id": "event-pa-puc-r-2024-3046523-2024-11-07-final-order",
      "proceeding_id": "case-pa-puc-r-2024-3046523",
      "event_type": "order_entered",
      "title": "Commission approved settlement",
      "start_date": "2024-11-07",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-pa-puc-r-2024-3046523-final-order",
      "source_url": "https://www.puc.pa.gov/pcdocs/1855536.pdf",
      "state": "PA",
      "utility_id": "utility-duquesne-light",
      "utility_name": "Duquesne Light",
      "docket_number": "R-2024-3046523"
    },
    {
      "id": "event-aep-texas-56165-order",
      "proceeding_id": "case-aep-texas-56165",
      "event_type": "order_entered",
      "title": "Final order issued",
      "start_date": "2024-11-17",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-aep-texas-56165-official",
      "source_url": "https://interchange.puc.texas.gov/Search/Filings?ControlNumber=56165",
      "state": "TX",
      "utility_id": "utility-aep-texas",
      "utility_name": "AEP Texas",
      "docket_number": "56165"
    },
    {
      "id": "event-tx-rrc-os-24-00019196-filed",
      "proceeding_id": "case-tx-rrc-os-24-00019196",
      "event_type": "application_filed",
      "title": "Statement of intent filed",
      "start_date": "2024-11-18",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-tx-rrc-os-24-00019196-hearing-notice",
      "source_url": "https://www.rrc.texas.gov/media/22qhhesi/1245bu.pdf",
      "state": "TX",
      "utility_id": "utility-atmos-mid-tex",
      "utility_name": "Atmos Energy Mid-Tex",
      "docket_number": "OS-24-00019196"
    },
    {
      "id": "event-appalachian-power-pur-2024-00024-order",
      "proceeding_id": "case-appalachian-power-pur-2024-00024",
      "event_type": "order_entered",
      "title": "Final order issued",
      "start_date": "2024-11-20",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-appalachian-power-pur-2024-00024-official",
      "source_url": "https://www.scc.virginia.gov/media/sccvirginiagov-home/about-the-scc/annual-reports/2024AR.pdf",
      "state": "VA",
      "utility_id": "utility-appalachian-power-va",
      "utility_name": "Appalachian Power",
      "docket_number": "PUR-2024-00024"
    },
    {
      "id": "event-columbia-final-order",
      "proceeding_id": "case-pa-puc-r-2024-3046519",
      "event_type": "final_order",
      "title": "Commission final order",
      "start_date": "2024-11-21",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-columbia-2024-outcome",
      "source_url": "https://www.puc.pa.gov/pcdocs/1856836.pdf",
      "state": "PA",
      "utility_id": "utility-columbia-gas-pa",
      "utility_name": "Columbia Gas of Pennsylvania",
      "docket_number": "R-2024-3046519"
    },
    {
      "id": "event-nj-bpu-er24110854-2024-11-21-filed",
      "proceeding_id": "case-nj-bpu-er24110854",
      "event_type": "application_filed",
      "title": "Base rate petition filed",
      "start_date": "2024-11-21",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nj-bpu-er24110854-order",
      "source_url": "https://www.nj.gov/bpu/pdf/boardorders/2025/20251121/2F%20ORDER%20ACE%20BRC.pdf",
      "state": "NJ",
      "utility_id": "utility-atlantic-city-electric",
      "utility_name": "Atlantic City Electric",
      "docket_number": "ER24110854"
    },
    {
      "id": "event-nj-bpu-gr24010071-2024-11-21-final-order",
      "proceeding_id": "case-nj-bpu-gr24010071",
      "event_type": "order_entered",
      "title": "Board approved settlement",
      "start_date": "2024-11-21",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nj-bpu-gr24010071-order",
      "source_url": "https://www.nj.gov/bpu/pdf/boardorders/2024/20241121/2B%20ORDER%20NJNG%20Base%20Rate%20Case.pdf",
      "state": "NJ",
      "utility_id": "utility-new-jersey-natural-gas",
      "utility_name": "New Jersey Natural Gas",
      "docket_number": "GR24010071"
    },
    {
      "id": "event-nj-bpu-gr24020158-2024-11-21-final-order",
      "proceeding_id": "case-nj-bpu-gr24020158",
      "event_type": "order_entered",
      "title": "Board approved settlement",
      "start_date": "2024-11-21",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nj-bpu-gr24020158-order",
      "source_url": "https://www.nj.gov/bpu/pdf/boardorders/2024/20241121/2C%20ORDER%20ETG%20Base%20Rate%20Case.pdf",
      "state": "NJ",
      "utility_id": "utility-elizabethtown-gas",
      "utility_name": "Elizabethtown Gas",
      "docket_number": "GR24020158"
    },
    {
      "id": "event-pa-puc-r-2024-3047068-2024-11-21-final-order",
      "proceeding_id": "case-pa-puc-r-2024-3047068",
      "event_type": "order_entered",
      "title": "Commission approved settlement",
      "start_date": "2024-11-21",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-firstenergy-r-2024-3047068-outcome",
      "source_url": "https://investors.firstenergycorp.com/investor-materials/news-releases/news-details/2024/Settlement-Reached-in-FirstEnergy-Pennsylvanias-Rate-Review-that-Supports-Enhanced-Service-Reliability-and-Customer-Assistance-Programs/default.aspx",
      "state": "PA",
      "utility_id": "utility-firstenergy-pa",
      "utility_name": "FirstEnergy Pennsylvania",
      "docket_number": "R-2024-3047068"
    },
    {
      "id": "event-elizabethtown-gas-2024-rates-effective",
      "proceeding_id": "case-nj-bpu-gr24020158",
      "event_type": "rates_effective",
      "title": "Authorized base rates became effective",
      "start_date": "2024-12-01",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-elizabethtown-gas-2024-effective-date",
      "source_url": "https://www.nj.gov/bpu/pdf/boardorders/2024/20241121/2C%20ORDER%20ETG%20Base%20Rate%20Case.pdf",
      "state": "NJ",
      "utility_id": "utility-elizabethtown-gas",
      "utility_name": "Elizabethtown Gas",
      "docket_number": "GR24020158"
    },
    {
      "id": "event-pa-puc-r-2024-3046931-2024-12-12-final-order",
      "proceeding_id": "case-pa-puc-r-2024-3046931",
      "event_type": "order_entered",
      "title": "Commission approved settlement",
      "start_date": "2024-12-12",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-peco-r-2024-3046931-sec",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1109357/000110935725000041/exc-20250212ex992.htm",
      "state": "PA",
      "utility_id": "utility-peco-electric",
      "utility_name": "PECO Electric",
      "docket_number": "R-2024-3046931"
    },
    {
      "id": "event-pa-puc-r-2024-3046932-2024-12-12-final-order",
      "proceeding_id": "case-pa-puc-r-2024-3046932",
      "event_type": "order_entered",
      "title": "Commission approved settlement",
      "start_date": "2024-12-12",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-peco-r-2024-3046932-sec",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1109357/000110935725000078/exc-20241231ars.pdf",
      "state": "PA",
      "utility_id": "utility-peco-gas",
      "utility_name": "PECO Gas",
      "docket_number": "R-2024-3046932"
    },
    {
      "id": "event-columbia-rates-effective",
      "proceeding_id": "case-pa-puc-r-2024-3046519",
      "event_type": "rates_effective",
      "title": "New base rates effective",
      "start_date": "2024-12-14",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-columbia-2024-outcome",
      "source_url": "https://www.puc.pa.gov/pcdocs/1856836.pdf",
      "state": "PA",
      "utility_id": "utility-columbia-gas-pa",
      "utility_name": "Columbia Gas of Pennsylvania",
      "docket_number": "R-2024-3046519"
    },
    {
      "id": "event-mi-mpsc-u-21806-filed",
      "proceeding_id": "case-mi-mpsc-u-21806",
      "event_type": "application_filed",
      "title": "Gas rate application filed",
      "start_date": "2024-12-16",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-mi-consumers-u-21806-application",
      "source_url": "https://www.consumersenergy.com/-/media/CE/Documents/rates/u-21806-application.pdf",
      "state": "MI",
      "utility_id": "utility-consumers-energy",
      "utility_name": "Consumers Energy",
      "docket_number": "U-21806"
    },
    {
      "id": "event-nsp-michigan-u-21565-order",
      "proceeding_id": "case-nsp-michigan-u-21565",
      "event_type": "order_entered",
      "title": "Final order issued",
      "start_date": "2024-12-19",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nsp-michigan-u-21565-official",
      "source_url": "https://www.michigan.gov/mpsc/-/media/Project/Websites/mpsc/regulatory/reports/annual/MPSC_2024_Annual_Report.pdf",
      "state": "MI",
      "utility_id": "utility-nsp-michigan",
      "utility_name": "Xcel Energy Michigan",
      "docket_number": "U-21565"
    },
    {
      "id": "event-pa-puc-r-2024-3046523-2024-12-20-rates-effective",
      "proceeding_id": "case-pa-puc-r-2024-3046523",
      "event_type": "rates_effective",
      "title": "Authorized rates became effective",
      "start_date": "2024-12-20",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-duquesne-r-2024-3046523-outcome",
      "source_url": "https://newsroom.duquesnelight.com/pennsylvania-public-utility-commission-approves-duquesne-light-companys-proposed-rate-increase",
      "state": "PA",
      "utility_id": "utility-duquesne-light",
      "utility_name": "Duquesne Light",
      "docket_number": "R-2024-3046523"
    },
    {
      "id": "event-action-wi-we-6630-te-113-opened",
      "proceeding_id": "action-wi-we-6630-te-113",
      "event_type": "case_opened",
      "title": "Proceeding opened",
      "start_date": "2025-01-01",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-wi-large-load",
      "source_url": "https://psc.wi.gov/Documents/PressReleases/04.24.2026PressRelease.PDF",
      "state": "WI",
      "utility_id": "utility-wisconsin-electric",
      "utility_name": "We Energies",
      "docket_number": "6630-TE-113"
    },
    {
      "id": "event-pa-puc-r-2024-3046931-2025-01-01-rates-effective",
      "proceeding_id": "case-pa-puc-r-2024-3046931",
      "event_type": "rates_effective",
      "title": "Authorized rates became effective",
      "start_date": "2025-01-01",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-peco-r-2024-3046931-sec",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1109357/000110935725000041/exc-20250212ex992.htm",
      "state": "PA",
      "utility_id": "utility-peco-electric",
      "utility_name": "PECO Electric",
      "docket_number": "R-2024-3046931"
    },
    {
      "id": "event-pa-puc-r-2024-3046932-2025-01-01-rates-effective",
      "proceeding_id": "case-pa-puc-r-2024-3046932",
      "event_type": "rates_effective",
      "title": "Authorized rates became effective",
      "start_date": "2025-01-01",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-peco-r-2024-3046932-sec",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1109357/000110935725000078/exc-20241231ars.pdf",
      "state": "PA",
      "utility_id": "utility-peco-gas",
      "utility_name": "PECO Gas",
      "docket_number": "R-2024-3046932"
    },
    {
      "id": "event-pa-puc-r-2024-3047068-2025-01-01-rates-effective",
      "proceeding_id": "case-pa-puc-r-2024-3047068",
      "event_type": "rates_effective",
      "title": "Authorized rates became effective",
      "start_date": "2025-01-01",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-firstenergy-r-2024-3047068-outcome",
      "source_url": "https://investors.firstenergycorp.com/investor-materials/news-releases/news-details/2024/Settlement-Reached-in-FirstEnergy-Pennsylvanias-Rate-Review-that-Supports-Enhanced-Service-Reliability-and-Customer-Assistance-Programs/default.aspx",
      "state": "PA",
      "utility_id": "utility-firstenergy-pa",
      "utility_name": "FirstEnergy Pennsylvania",
      "docket_number": "R-2024-3047068"
    },
    {
      "id": "event-policy-az-large-load-e-00000a-25-0069-opened",
      "proceeding_id": "policy-az-large-load-e-00000a-25-0069",
      "event_type": "case_opened",
      "title": "Proceeding opened",
      "start_date": "2025-01-01",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-az-large-load",
      "source_url": "https://azcc.gov/news/home/2026/04/20/acc-large-load-data-center-workshop-highlights",
      "state": "AZ",
      "utility_id": "utility-aps",
      "utility_name": "Arizona Public Service",
      "docket_number": "E-00000A-25-0069"
    },
    {
      "id": "event-nc-piedmont-g9-sub837-final-order",
      "proceeding_id": "case-nc-piedmont-g9-sub837",
      "event_type": "final_order",
      "title": "Final order entered",
      "start_date": "2025-01-07",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-nc-piedmont-g9-sub837-final-order",
      "source_url": "https://starw1.ncuc.gov/NCUC/ViewFile.aspx?Id=7474301c-7626-47cf-8fe7-7692c3f4c08f",
      "state": "NC",
      "utility_id": "utility-piedmont-natural-gas",
      "utility_name": "Piedmont Natural Gas",
      "docket_number": "G-9 SUB 837"
    },
    {
      "id": "event-nc-denc-e22-sub694-final-order",
      "proceeding_id": "case-nc-denc-e22-sub694",
      "event_type": "final_order",
      "title": "Final order entered",
      "start_date": "2025-01-14",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-nc-denc-e22-sub694-final-order",
      "source_url": "https://starw1.ncuc.gov/NCUC/ViewFile.aspx?Id=feb5245a-d16f-4367-b28d-2406ba8686a5",
      "state": "NC",
      "utility_id": "utility-dominion-energy-north-carolina-electric",
      "utility_name": "Dominion Energy North Carolina",
      "docket_number": "E-22 SUB 694"
    },
    {
      "id": "event-dte-electric-u-21534-order",
      "proceeding_id": "case-dte-electric-u-21534",
      "event_type": "order_entered",
      "title": "Final order issued",
      "start_date": "2025-01-23",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-dte-electric-u-21534-official",
      "source_url": "https://www.michigan.gov/mpsc/-/media/Project/Websites/mpsc/regulatory/reports/annual/MPSC_2025_Annual_Report.pdf",
      "state": "MI",
      "utility_id": "utility-dte-electric",
      "utility_name": "DTE Electric",
      "docket_number": "U-21534"
    },
    {
      "id": "event-epe-57568-application-filed",
      "proceeding_id": "case-el-paso-electric-57568",
      "event_type": "application_filed",
      "title": "El Paso Electric filed its Texas base-rate application",
      "start_date": "2025-01-27",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-epe-57568-preliminary-order-page-2",
      "source_url": "https://interchange.puc.texas.gov/Documents/57568_70_1478776.PDF",
      "state": "TX",
      "utility_id": "utility-el-paso-electric",
      "utility_name": "El Paso Electric",
      "docket_number": "57568"
    },
    {
      "id": "event-pa-puc-r-2024-3052716-2025-01-27-filed",
      "proceeding_id": "case-pa-puc-r-2024-3052716",
      "event_type": "application_filed",
      "title": "General rate application filed",
      "start_date": "2025-01-27",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-ugi-r-2024-3052716-history",
      "source_url": "https://www.ugi.com/rate-filing-old/past/",
      "state": "PA",
      "utility_id": "utility-ugi-gas",
      "utility_name": "UGI Gas",
      "docket_number": "R-2024-3052716"
    },
    {
      "id": "event-west-texas-gas-os-24-00017816-final-order",
      "proceeding_id": "case-west-texas-gas-os-24-00017816",
      "event_type": "order_entered",
      "title": "Commission entered the final order approving the settlement",
      "start_date": "2025-01-29",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-west-texas-gas-os-24-00017816-capital-terms",
      "source_url": "https://apps.rrc.texas.gov/portal/s/ietrs-public-file-correspondence/a0ycs000004k2sY/casedoc0000149948",
      "state": "TX",
      "utility_id": "utility-west-texas-gas",
      "utility_name": "West Texas Gas Utility",
      "docket_number": "OS-24-00017816"
    },
    {
      "id": "event-rockin-m-gas-os-24-00017711-rehearing-order",
      "proceeding_id": "case-rockin-m-gas-os-24-00017711",
      "event_type": "order_entered",
      "title": "Commission granted limited rehearing and amended the final order",
      "start_date": "2025-02-19",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-rockin-m-gas-os-24-00017711-rehearing-finality",
      "source_url": "https://apps.rrc.texas.gov/portal/s/ietrs-public-file-correspondence/a0ycs000005H0vB/casedoc0000152237",
      "state": "TX",
      "utility_id": "utility-rockin-m-gas",
      "utility_name": "Rockin M Gas",
      "docket_number": "OS-24-00017711"
    },
    {
      "id": "event-centerpoint-houston-electric-56211-order",
      "proceeding_id": "case-centerpoint-houston-electric-56211",
      "event_type": "order_entered",
      "title": "Final order issued",
      "start_date": "2025-03-13",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-centerpoint-houston-electric-56211-official",
      "source_url": "https://interchange.puc.texas.gov/Search/Filings?ControlNumber=56211",
      "state": "TX",
      "utility_id": "utility-centerpoint-houston-electric",
      "utility_name": "CenterPoint Houston Electric",
      "docket_number": "56211"
    },
    {
      "id": "event-pa-puc-r-2025-3053499-2025-03-20-filed",
      "proceeding_id": "case-pa-puc-r-2025-3053499",
      "event_type": "application_filed",
      "title": "General rate application filed",
      "start_date": "2025-03-20",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-columbia-r-2025-3053499-rate-page",
      "source_url": "https://www.columbiagaspa.com/our-company/about-us/regulatory-information",
      "state": "PA",
      "utility_id": "utility-columbia-gas-pa",
      "utility_name": "Columbia Gas of Pennsylvania",
      "docket_number": "R-2025-3053499"
    },
    {
      "id": "event-mi-mpsc-u-21585-final-order",
      "proceeding_id": "case-mi-mpsc-u-21585",
      "event_type": "order_entered",
      "title": "Commission order issued",
      "start_date": "2025-03-21",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-mi-mpsc-u-21585-order-summary",
      "source_url": "https://www.michigan.gov/mpsc/commission/news-releases/2025/03/21/commission-approves-%24153-8m-for-consumers-energy-to-improve-grid-reliability",
      "state": "MI",
      "utility_id": "utility-consumers-energy",
      "utility_name": "Consumers Energy",
      "docket_number": "U-21585"
    },
    {
      "id": "event-pa-model-large-load-tariff-opened",
      "proceeding_id": "policy-pa-puc-model-large-load-tariff",
      "event_type": "case_opened",
      "title": "Policy proceeding opened",
      "start_date": "2025-03-27",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-pa-model-large-load-final-order",
      "source_url": "https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-22/56_22_not.pdf",
      "state": "PA",
      "utility_id": null,
      "utility_name": null,
      "docket_number": "M-2025-3054271"
    },
    {
      "id": "event-citizens-case-opened",
      "proceeding_id": "case-pa-puc-r-2025-3054394",
      "event_type": "case_opened",
      "title": "Commission docket opened",
      "start_date": "2025-03-28",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-pa-puc-discovery-r-2025-3054394",
      "source_url": "https://www.puc.pa.gov/docket/R-2025-3054394",
      "state": "PA",
      "utility_id": "utility-citizens-electric",
      "utility_name": "Citizens' Electric",
      "docket_number": "R-2025-3054394"
    },
    {
      "id": "event-valley-case-opened",
      "proceeding_id": "case-pa-puc-r-2025-3054393",
      "event_type": "case_opened",
      "title": "Commission docket opened",
      "start_date": "2025-03-28",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-pa-puc-discovery-r-2025-3054393",
      "source_url": "https://www.puc.pa.gov/docket/R-2025-3054393",
      "state": "PA",
      "utility_id": "utility-valley-energy",
      "utility_name": "Valley Energy",
      "docket_number": "R-2025-3054393"
    },
    {
      "id": "event-wellsboro-case-opened",
      "proceeding_id": "case-pa-puc-r-2025-3054392",
      "event_type": "case_opened",
      "title": "Commission docket opened",
      "start_date": "2025-03-28",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-pa-puc-discovery-r-2025-3054392",
      "source_url": "https://www.puc.pa.gov/docket/R-2025-3054392",
      "state": "PA",
      "utility_id": "utility-wellsboro-electric",
      "utility_name": "Wellsboro Electric",
      "docket_number": "R-2025-3054392"
    },
    {
      "id": "event-va-scc-pur-2025-00058-filed",
      "proceeding_id": "case-va-scc-pur-2025-00058",
      "event_type": "application_filed",
      "title": "Biennial review application filed",
      "start_date": "2025-03-31",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-va-scc-pur-2025-00058-procedural-order",
      "source_url": "https://www.scc.virginia.gov/docketsearch/DOCS/854_01%21.PDF",
      "state": "VA",
      "utility_id": "utility-dominion-energy-virginia",
      "utility_name": "Dominion Energy Virginia",
      "docket_number": "PUR-2025-00058"
    },
    {
      "id": "event-mi-mpsc-u-21585-rates-effective",
      "proceeding_id": "case-mi-mpsc-u-21585",
      "event_type": "rates_effective",
      "title": "New rates effective",
      "start_date": "2025-04-04",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-mi-mpsc-u-21585-order-summary",
      "source_url": "https://www.michigan.gov/mpsc/commission/news-releases/2025/03/21/commission-approves-%24153-8m-for-consumers-energy-to-improve-grid-reliability",
      "state": "MI",
      "utility_id": "utility-consumers-energy",
      "utility_name": "Consumers Energy",
      "docket_number": "U-21585"
    },
    {
      "id": "event-roanoke-gas-2024-final-order",
      "proceeding_id": "case-roanoke-gas-pur-2024-00006",
      "event_type": "order_entered",
      "title": "Commission entered the final order",
      "start_date": "2025-04-10",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-roanoke-gas-2024-final-order",
      "source_url": "https://www.scc.virginia.gov/media/sccvirginiagov-home/about-the-scc/annual-reports/2025-annual-report.pdf",
      "state": "VA",
      "utility_id": "utility-roanoke-gas",
      "utility_name": "Roanoke Gas",
      "docket_number": "PUR-2024-00006"
    },
    {
      "id": "event-columbia-gas-va-pur-2024-00030-final-order",
      "proceeding_id": "case-columbia-gas-virginia-pur-2024-00030",
      "event_type": "order_entered",
      "title": "Virginia SCC approved the stipulation",
      "start_date": "2025-05-15",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-columbia-gas-va-pur-2024-00030-page-7",
      "source_url": "https://www.scc.virginia.gov/docketsearch/DOCS/85l401%21.PDF",
      "state": "VA",
      "utility_id": "utility-columbia-gas-virginia",
      "utility_name": "Columbia Gas of Virginia",
      "docket_number": "PUR-2024-00030"
    },
    {
      "id": "event-case-az-tep-e-01933a-25-0103-opened",
      "proceeding_id": "case-az-tep-e-01933a-25-0103",
      "event_type": "application_filed",
      "title": "Application filed",
      "start_date": "2025-06-01",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-az-tep-rate",
      "source_url": "https://azcc.gov/news/home/2026/02/17/tep-rate-case-timeline-update",
      "state": "AZ",
      "utility_id": "utility-tep",
      "utility_name": "Tucson Electric Power",
      "docket_number": "E-01933A-25-0103"
    },
    {
      "id": "event-case-az-aps-e-01345a-25-0105-opened",
      "proceeding_id": "case-az-aps-e-01345a-25-0105",
      "event_type": "application_filed",
      "title": "Application filed",
      "start_date": "2025-06-13",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-az-discovery-e-01345a-25-0105",
      "source_url": "https://www.azcc.gov/news/home/2026/02/19/what-s-next-in-the-aps-rate-case",
      "state": "AZ",
      "utility_id": "utility-aps",
      "utility_name": "Arizona Public Service",
      "docket_number": "E-01345A-25-0105"
    },
    {
      "id": "event-tx-rrc-os-24-00019196-settlement-order",
      "proceeding_id": "case-tx-rrc-os-24-00019196",
      "event_type": "order_entered",
      "title": "Settlement order issued",
      "start_date": "2025-06-17",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-tx-atmos-os-24-00019196-tariff",
      "source_url": "https://www.rrc.texas.gov/media/gastariffs/gftr0048b_6776.pdf",
      "state": "TX",
      "utility_id": "utility-atmos-mid-tex",
      "utility_name": "Atmos Energy Mid-Tex",
      "docket_number": "OS-24-00019196"
    },
    {
      "id": "event-oncor-58306-application-filed",
      "proceeding_id": "case-oncor-58306",
      "event_type": "application_filed",
      "title": "Oncor filed its base-rate application",
      "start_date": "2025-06-26",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-oncor-58306-application-and-order",
      "source_url": "https://interchange.puc.texas.gov/Documents/58306_755_1624444.PDF",
      "state": "TX",
      "utility_id": "utility-oncor",
      "utility_name": "Oncor",
      "docket_number": "58306"
    },
    {
      "id": "event-case-ny-nyseg-25-e-0375-opened",
      "proceeding_id": "case-ny-nyseg-25-e-0375",
      "event_type": "application_filed",
      "title": "Application filed",
      "start_date": "2025-06-30",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-ny-discovery-25-e-0375",
      "source_url": "https://dps.ny.gov/pending-and-recent-electric-rate-cases",
      "state": "NY",
      "utility_id": "utility-nyseg",
      "utility_name": "NYSEG",
      "docket_number": "25-E-0375"
    },
    {
      "id": "event-case-ny-nyseg-25-g-0378-opened",
      "proceeding_id": "case-ny-nyseg-25-g-0378",
      "event_type": "application_filed",
      "title": "Application filed",
      "start_date": "2025-06-30",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-ny-gas-cases",
      "source_url": "https://dps.ny.gov/pending-and-recent-gas-rate-cases",
      "state": "NY",
      "utility_id": "utility-nyseg",
      "utility_name": "NYSEG",
      "docket_number": "25-G-0378"
    },
    {
      "id": "event-case-ny-rge-25-e-0379-opened",
      "proceeding_id": "case-ny-rge-25-e-0379",
      "event_type": "application_filed",
      "title": "Application filed",
      "start_date": "2025-06-30",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-ny-discovery-25-e-0379",
      "source_url": "https://dps.ny.gov/pending-and-recent-electric-rate-cases",
      "state": "NY",
      "utility_id": "utility-rge",
      "utility_name": "RG&E",
      "docket_number": "25-E-0379"
    },
    {
      "id": "event-case-ny-rge-25-g-0380-opened",
      "proceeding_id": "case-ny-rge-25-g-0380",
      "event_type": "application_filed",
      "title": "Application filed",
      "start_date": "2025-06-30",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-ny-gas-cases",
      "source_url": "https://dps.ny.gov/pending-and-recent-gas-rate-cases",
      "state": "NY",
      "utility_id": "utility-rge",
      "utility_name": "RG&E",
      "docket_number": "25-G-0380"
    },
    {
      "id": "event-nj-bpu-er25060374-2025-06-30-filed",
      "proceeding_id": "case-nj-bpu-er25060374",
      "event_type": "application_filed",
      "title": "Base rate petition filed",
      "start_date": "2025-06-30",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nj-bpu-er25060374-order",
      "source_url": "https://www.nj.gov/bpu/pdf/boardorders/2026/20260630/2D%20ORDER%20RECO%20Base%20Rate%20Case.pdf",
      "state": "NJ",
      "utility_id": "utility-rockland-electric",
      "utility_name": "Rockland Electric",
      "docket_number": "ER25060374"
    },
    {
      "id": "event-action-oh-aep-schedule-dct-action",
      "proceeding_id": "action-oh-aep-schedule-dct",
      "event_type": "rates_effective",
      "title": "AEP Ohio Schedule DCT",
      "start_date": "2025-07-23",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": "AEP Ohio's operating data-center tariff combines minimum-demand billing, a long service term, an exit payment, and a credit test that can require collateral covering half of minimum charges for the full contract term.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-market-oh-puco-aep-order-release",
      "source_url": "https://content.govdelivery.com/accounts/OHPUC/bulletins/3e8bb79",
      "state": "OH",
      "utility_id": null,
      "utility_name": null,
      "docket_number": "24-0508-EL-ATA"
    },
    {
      "id": "event-tx-rrc-os-24-00019196-rates-effective",
      "proceeding_id": "case-tx-rrc-os-24-00019196",
      "event_type": "rates_effective",
      "title": "Compliance tariffs effective",
      "start_date": "2025-08-01",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-tx-atmos-os-24-00019196-tariff",
      "source_url": "https://www.rrc.texas.gov/media/gastariffs/gftr0048b_6776.pdf",
      "state": "TX",
      "utility_id": "utility-atmos-mid-tex",
      "utility_name": "Atmos Energy Mid-Tex",
      "docket_number": "OS-24-00019196"
    },
    {
      "id": "event-ppl-case-received",
      "proceeding_id": "case-pa-puc-r-2025-3057164",
      "event_type": "case_received",
      "title": "Case record received by Commission",
      "start_date": "2025-08-29",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-ppl-docket",
      "source_url": "https://www.puc.pa.gov/docket/R-2025-3057164",
      "state": "PA",
      "utility_id": "utility-ppl-electric",
      "utility_name": "PPL Electric",
      "docket_number": "R-2025-3057164"
    },
    {
      "id": "event-pa-puc-r-2024-3052716-2025-09-11-final-order",
      "proceeding_id": "case-pa-puc-r-2024-3052716",
      "event_type": "order_entered",
      "title": "Commission approved settlement",
      "start_date": "2025-09-11",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-ugi-r-2024-3052716-sec",
      "source_url": "https://www.sec.gov/Archives/edgar/data/884614/000088461425000053/ugi-20250930.htm",
      "state": "PA",
      "utility_id": "utility-ugi-gas",
      "utility_name": "UGI Gas",
      "docket_number": "R-2024-3052716"
    },
    {
      "id": "event-mi-mpsc-u-21806-final-order",
      "proceeding_id": "case-mi-mpsc-u-21806",
      "event_type": "order_entered",
      "title": "Commission order issued",
      "start_date": "2025-09-30",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-mi-mpsc-u-21806-order-summary",
      "source_url": "https://www.michigan.gov/mpsc/commission/news-releases/2025/09/30/commission-approves-consumers-energy-gas-rate-increase-to-upgrade-system",
      "state": "MI",
      "utility_id": "utility-consumers-energy",
      "utility_name": "Consumers Energy",
      "docket_number": "U-21806"
    },
    {
      "id": "event-ppl-tariff-filed",
      "proceeding_id": "case-pa-puc-r-2025-3057164",
      "event_type": "tariff_filed",
      "title": "Proposed tariffs filed",
      "start_date": "2025-09-30",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-ppl-final-order-request",
      "source_url": "https://www.puc.pa.gov/pcdocs/1934703.pdf",
      "state": "PA",
      "utility_id": "utility-ppl-electric",
      "utility_name": "PPL Electric",
      "docket_number": "R-2025-3057164"
    },
    {
      "id": "event-pa-puc-r-2024-3052716-2025-10-28-rates-effective",
      "proceeding_id": "case-pa-puc-r-2024-3052716",
      "event_type": "rates_effective",
      "title": "Authorized rates became effective",
      "start_date": "2025-10-28",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-ugi-r-2024-3052716-sec",
      "source_url": "https://www.sec.gov/Archives/edgar/data/884614/000088461425000053/ugi-20250930.htm",
      "state": "PA",
      "utility_id": "utility-ugi-gas",
      "utility_name": "UGI Gas",
      "docket_number": "R-2024-3052716"
    },
    {
      "id": "event-mi-mpsc-u-21806-rates-effective",
      "proceeding_id": "case-mi-mpsc-u-21806",
      "event_type": "rates_effective",
      "title": "New rates effective",
      "start_date": "2025-11-01",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-mi-mpsc-u-21806-order-summary",
      "source_url": "https://www.michigan.gov/mpsc/commission/news-releases/2025/09/30/commission-approves-consumers-energy-gas-rate-increase-to-upgrade-system",
      "state": "MI",
      "utility_id": "utility-consumers-energy",
      "utility_name": "Consumers Energy",
      "docket_number": "U-21806"
    },
    {
      "id": "event-action-mi-consumers-large-load-terms-action",
      "proceeding_id": "action-mi-consumers-large-load-terms",
      "event_type": "rates_effective",
      "title": "Consumers Energy Rate GPD large-load provisions",
      "start_date": "2025-11-07",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": "Consumers Energy's generally applicable provisions combine a long term, guaranteed minimum billing, an exit fee, default collateral, and project-specific Commission review.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-market-mi-consumers-u21859",
      "source_url": "https://www.michigan.gov/mpsc/commission/news-releases/2025/11/06/mpsc-approves-terms-of-service-between-consumers-energy-and-data-centers",
      "state": "MI",
      "utility_id": null,
      "utility_name": null,
      "docket_number": "U-21859"
    },
    {
      "id": "event-dte-gas-u21973-application-filed",
      "proceeding_id": "case-dte-gas-u-21973",
      "event_type": "application_filed",
      "title": "DTE Gas filed its rate application",
      "start_date": "2025-11-13",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-dte-2026-q1-regulatory-update-page-27",
      "source_url": "https://www.sec.gov/Archives/edgar/data/936340/000093634026000081/dte-20260331.htm",
      "state": "MI",
      "utility_id": "utility-dte-gas",
      "utility_name": "DTE Gas",
      "docket_number": "U-21973"
    },
    {
      "id": "event-oh-puco-24-468-el-air-final-order",
      "proceeding_id": "case-oh-puco-24-468-el-air",
      "event_type": "order_entered",
      "title": "Opinion and order issued",
      "start_date": "2025-11-19",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-oh-puco-24-468-el-air-rehearing",
      "source_url": "https://content.govdelivery.com/accounts/OHPUC/bulletins/40a718d",
      "state": "OH",
      "utility_id": "utility-ohio-edison",
      "utility_name": "Ohio Edison",
      "docket_number": "24-0468-EL-AIR"
    },
    {
      "id": "event-nj-bpu-er24110854-2025-11-21-final-order",
      "proceeding_id": "case-nj-bpu-er24110854",
      "event_type": "order_entered",
      "title": "Board approved settlement",
      "start_date": "2025-11-21",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nj-bpu-er24110854-order",
      "source_url": "https://www.nj.gov/bpu/pdf/boardorders/2025/20251121/2F%20ORDER%20ACE%20BRC.pdf",
      "state": "NJ",
      "utility_id": "utility-atlantic-city-electric",
      "utility_name": "Atlantic City Electric",
      "docket_number": "ER24110854"
    },
    {
      "id": "event-va-scc-pur-2025-00058-final-order",
      "proceeding_id": "case-va-scc-pur-2025-00058",
      "event_type": "order_entered",
      "title": "Final order issued",
      "start_date": "2025-11-25",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-va-scc-pur-2025-00058-final-order",
      "source_url": "https://www.scc.virginia.gov/docketsearch/DOCS/89g601%21.PDF",
      "state": "VA",
      "utility_id": "utility-dominion-energy-virginia",
      "utility_name": "Dominion Energy Virginia",
      "docket_number": "PUR-2025-00058"
    },
    {
      "id": "event-nj-bpu-gr25110627-2025-11-26-filed",
      "proceeding_id": "case-nj-bpu-gr25110627",
      "event_type": "application_filed",
      "title": "Base rate petition filed",
      "start_date": "2025-11-26",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nj-bpu-gr25110627-first-suspension",
      "source_url": "https://www.nj.gov/bpu/pdf/boardorders/2025/20251217/IIA%20ORDER%20SJG%20BRC%201st%20Suspension.pdf",
      "state": "NJ",
      "utility_id": "utility-south-jersey-gas",
      "utility_name": "South Jersey Gas",
      "docket_number": "GR25110627"
    },
    {
      "id": "event-nj-bpu-er24110854-2025-12-01-rates-effective",
      "proceeding_id": "case-nj-bpu-er24110854",
      "event_type": "rates_effective",
      "title": "Revised base rates became effective",
      "start_date": "2025-12-01",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nj-bpu-er24110854-order",
      "source_url": "https://www.nj.gov/bpu/pdf/boardorders/2025/20251121/2F%20ORDER%20ACE%20BRC.pdf",
      "state": "NJ",
      "utility_id": "utility-atlantic-city-electric",
      "utility_name": "Atlantic City Electric",
      "docket_number": "ER24110854"
    },
    {
      "id": "event-ppl-proposed-effective",
      "proceeding_id": "case-pa-puc-r-2025-3057164",
      "event_type": "proposed_effective",
      "title": "Proposed tariff effective date",
      "start_date": "2025-12-01",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "utility_guidance",
      "status": "completed",
      "condition_text": "Proposed date only; the tariffs were suspended.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-ppl-final-order-request",
      "source_url": "https://www.puc.pa.gov/pcdocs/1934703.pdf",
      "state": "PA",
      "utility_id": "utility-ppl-electric",
      "utility_name": "PPL Electric",
      "docket_number": "R-2025-3057164"
    },
    {
      "id": "event-six-state-active-roanoke-filed",
      "proceeding_id": "case-roanoke-gas-pur-2025-00209",
      "event_type": "application_filed",
      "title": "Expedited rate application filed",
      "start_date": "2025-12-02",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-six-state-active-roanoke",
      "source_url": "https://www.scc.virginia.gov/docketsearch/DOCS/89sp01%21.PDF",
      "state": "VA",
      "utility_id": "utility-roanoke-gas",
      "utility_name": "Roanoke Gas",
      "docket_number": "PUR-2025-00209"
    },
    {
      "id": "event-pa-puc-r-2025-3053499-2025-12-04-commission-meeting",
      "proceeding_id": "case-pa-puc-r-2025-3053499",
      "event_type": "commission_meeting",
      "title": "Commission approved final rate adjustment",
      "start_date": "2025-12-04",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-columbia-r-2025-3053499-rate-page",
      "source_url": "https://www.columbiagaspa.com/our-company/about-us/regulatory-information",
      "state": "PA",
      "utility_id": "utility-columbia-gas-pa",
      "utility_name": "Columbia Gas of Pennsylvania",
      "docket_number": "R-2025-3053499"
    },
    {
      "id": "event-nc-enbridge-g5-sub686-final-order",
      "proceeding_id": "case-nc-enbridge-g5-sub686",
      "event_type": "final_order",
      "title": "Final order entered",
      "start_date": "2025-12-09",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-nc-enbridge-g5-sub686-final-order",
      "source_url": "https://starw1.ncuc.gov/NCUC/ViewFile.aspx?Id=97f35ed4-a73f-4ad5-8f71-a5a4e7be546f",
      "state": "NC",
      "utility_id": "utility-enbridge-gas-north-carolina",
      "utility_name": "Enbridge Gas North Carolina",
      "docket_number": "G-5 SUB 686"
    },
    {
      "id": "event-pa-puc-r-2025-3053499-2025-12-09-final-order",
      "proceeding_id": "case-pa-puc-r-2025-3053499",
      "event_type": "order_entered",
      "title": "Final order entered",
      "start_date": "2025-12-09",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-columbia-r-2025-3053499-rate-page",
      "source_url": "https://www.columbiagaspa.com/our-company/about-us/regulatory-information",
      "state": "PA",
      "utility_id": "utility-columbia-gas-pa",
      "utility_name": "Columbia Gas of Pennsylvania",
      "docket_number": "R-2025-3053499"
    },
    {
      "id": "event-consumers-energy-u-21981-application-filed",
      "proceeding_id": "case-consumers-energy-u-21981",
      "event_type": "application_filed",
      "title": "Natural-gas rate application filed",
      "start_date": "2025-12-16",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "procedural_inference",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-consumers-energy-u-21981-ag-filing-announcement",
      "source_url": "https://www.michigan.gov/ag/news/press-releases/2025/12/17/ag-nessel-to-intervene-in-consumers-energy",
      "state": "MI",
      "utility_id": "utility-consumers-energy",
      "utility_name": "Consumers Energy",
      "docket_number": "U-21981"
    },
    {
      "id": "event-nj-bpu-gr25110627-2025-12-17-first-suspension",
      "proceeding_id": "case-nj-bpu-gr25110627",
      "event_type": "suspension_order",
      "title": "Board entered first suspension order",
      "start_date": "2025-12-17",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nj-bpu-gr25110627-first-suspension",
      "source_url": "https://www.nj.gov/bpu/pdf/boardorders/2025/20251217/IIA%20ORDER%20SJG%20BRC%201st%20Suspension.pdf",
      "state": "NJ",
      "utility_id": "utility-south-jersey-gas",
      "utility_name": "South Jersey Gas",
      "docket_number": "GR25110627"
    },
    {
      "id": "event-nsp-michigan-u-21903-order",
      "proceeding_id": "case-nsp-michigan-u-21903",
      "event_type": "order_entered",
      "title": "Final order issued",
      "start_date": "2025-12-18",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nsp-michigan-u-21903-official",
      "source_url": "https://www.michigan.gov/mpsc/-/media/Project/Websites/mpsc/regulatory/reports/annual/MPSC_2025_Annual_Report.pdf",
      "state": "MI",
      "utility_id": "utility-nsp-michigan",
      "utility_name": "Xcel Energy Michigan",
      "docket_number": "U-21903"
    },
    {
      "id": "event-nfg-case-received",
      "proceeding_id": "case-pa-puc-r-2025-3059428",
      "event_type": "case_received",
      "title": "Case record received by Commission",
      "start_date": "2025-12-19",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nfg-docket",
      "source_url": "https://www.puc.pa.gov/docket/R-2025-3059428",
      "state": "PA",
      "utility_id": "utility-national-fuel-gas-pa",
      "utility_name": "National Fuel Gas",
      "docket_number": "R-2025-3059428"
    },
    {
      "id": "event-ugi-electric-case-received",
      "proceeding_id": "case-pa-puc-r-2025-3059430",
      "event_type": "case_received",
      "title": "Case record received by Commission",
      "start_date": "2025-12-19",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-ugi-electric-docket",
      "source_url": "https://www.puc.pa.gov/docket/R-2025-3059430",
      "state": "PA",
      "utility_id": "utility-ugi-electric",
      "utility_name": "UGI Electric",
      "docket_number": "R-2025-3059430"
    },
    {
      "id": "event-nfg-case-posted",
      "proceeding_id": "case-pa-puc-r-2025-3059428",
      "event_type": "case_posted",
      "title": "Case record posted by Commission",
      "start_date": "2025-12-22",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nfg-docket",
      "source_url": "https://www.puc.pa.gov/docket/R-2025-3059428",
      "state": "PA",
      "utility_id": "utility-national-fuel-gas-pa",
      "utility_name": "National Fuel Gas",
      "docket_number": "R-2025-3059428"
    },
    {
      "id": "event-ugi-electric-case-posted",
      "proceeding_id": "case-pa-puc-r-2025-3059430",
      "event_type": "case_posted",
      "title": "Case record posted by Commission",
      "start_date": "2025-12-22",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-ugi-electric-docket",
      "source_url": "https://www.puc.pa.gov/docket/R-2025-3059430",
      "state": "PA",
      "utility_id": "utility-ugi-electric",
      "utility_name": "UGI Electric",
      "docket_number": "R-2025-3059430"
    },
    {
      "id": "event-pa-puc-r-2025-3053499-2025-12-23-rehearing-filed",
      "proceeding_id": "case-pa-puc-r-2025-3053499",
      "event_type": "rehearing_filed",
      "title": "Petitions for reconsideration filed",
      "start_date": "2025-12-23",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-pa-puc-r-2025-3053499-docket",
      "source_url": "https://www.puc.pa.gov/docket/R-2025-3053499",
      "state": "PA",
      "utility_id": "utility-columbia-gas-pa",
      "utility_name": "Columbia Gas of Pennsylvania",
      "docket_number": "R-2025-3053499"
    },
    {
      "id": "event-ugi-gas-case-received",
      "proceeding_id": "case-pa-puc-r-2025-3059523",
      "event_type": "case_received",
      "title": "Case record received by Commission",
      "start_date": "2025-12-29",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-ugi-gas-docket",
      "source_url": "https://www.puc.pa.gov/docket/R-2025-3059523",
      "state": "PA",
      "utility_id": "utility-ugi-gas",
      "utility_name": "UGI Gas",
      "docket_number": "R-2025-3059523"
    },
    {
      "id": "event-ugi-gas-case-posted",
      "proceeding_id": "case-pa-puc-r-2025-3059523",
      "event_type": "case_posted",
      "title": "Case record posted by Commission",
      "start_date": "2025-12-30",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-ugi-gas-docket",
      "source_url": "https://www.puc.pa.gov/docket/R-2025-3059523",
      "state": "PA",
      "utility_id": "utility-ugi-gas",
      "utility_name": "UGI Gas",
      "docket_number": "R-2025-3059523"
    },
    {
      "id": "event-case-or-cascade-ug-525-opened",
      "proceeding_id": "case-or-cascade-ug-525",
      "event_type": "application_filed",
      "title": "Application filed",
      "start_date": "2026-01-01",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-or-discovery-ug-525",
      "source_url": "https://www.oregon.gov/puc/Pages/Upcoming-Decisions.aspx",
      "state": "OR",
      "utility_id": "utility-cascade-natural-gas-oregon",
      "utility_name": "Cascade Natural Gas — Oregon",
      "docket_number": "UG-525"
    },
    {
      "id": "event-case-or-pacific-power-ue-470-opened",
      "proceeding_id": "case-or-pacific-power-ue-470",
      "event_type": "application_filed",
      "title": "Application filed",
      "start_date": "2026-01-01",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-or-discovery-ue-470",
      "source_url": "https://www.oregon.gov/puc/Pages/Upcoming-Decisions.aspx",
      "state": "OR",
      "utility_id": "utility-pacific-power-oregon",
      "utility_name": "Pacific Power — Oregon",
      "docket_number": "UE-470"
    },
    {
      "id": "event-pa-puc-r-2025-3053499-2026-01-01-rates-effective",
      "proceeding_id": "case-pa-puc-r-2025-3053499",
      "event_type": "rates_effective",
      "title": "Approved rates became effective",
      "start_date": "2026-01-01",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-columbia-r-2025-3053499-rate-page",
      "source_url": "https://www.columbiagaspa.com/our-company/about-us/regulatory-information",
      "state": "PA",
      "utility_id": "utility-columbia-gas-pa",
      "utility_name": "Columbia Gas of Pennsylvania",
      "docket_number": "R-2025-3053499"
    },
    {
      "id": "event-policy-la-large-load-r-37905-opened",
      "proceeding_id": "policy-la-large-load-r-37905",
      "event_type": "case_opened",
      "title": "Proceeding opened",
      "start_date": "2026-01-01",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-la-large-load",
      "source_url": "https://lpsc.louisiana.gov/",
      "state": "LA",
      "utility_id": "utility-entergy-louisiana",
      "utility_name": "Entergy Louisiana",
      "docket_number": "R-37905"
    },
    {
      "id": "event-va-scc-pur-2025-00058-rates-effective",
      "proceeding_id": "case-va-scc-pur-2025-00058",
      "event_type": "rates_effective",
      "title": "First-year rates became effective",
      "start_date": "2026-01-01",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-va-scc-pur-2025-00058-final-order",
      "source_url": "https://www.scc.virginia.gov/docketsearch/DOCS/89g601%21.PDF",
      "state": "VA",
      "utility_id": "utility-dominion-energy-virginia",
      "utility_name": "Dominion Energy Virginia",
      "docket_number": "PUR-2025-00058"
    },
    {
      "id": "event-il-26-0007-filed",
      "proceeding_id": "case-il-mt-carmel-26-0007",
      "event_type": "case_opened",
      "title": "General rate case filed",
      "start_date": "2026-01-06",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-il-icc-discovery-26-0007",
      "source_url": "https://www.icc.illinois.gov/docket/P2026-0007",
      "state": "IL",
      "utility_id": "utility-mt-carmel",
      "utility_name": "Mt. Carmel Public Utility",
      "docket_number": "26-0007"
    },
    {
      "id": "event-oh-puco-24-832-ga-air-final-order",
      "proceeding_id": "case-oh-puco-24-832-ga-air",
      "event_type": "order_entered",
      "title": "Settlement modified and approved",
      "start_date": "2026-01-07",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-oh-puco-24-832-ga-air-order-summary",
      "source_url": "https://content.govdelivery.com/accounts/OHPUC/bulletins/403ff71",
      "state": "OH",
      "utility_id": "utility-centerpoint-energy-ohio",
      "utility_name": "CenterPoint Energy Ohio",
      "docket_number": "24-0832-GA-AIR"
    },
    {
      "id": "event-citizens-final-order",
      "proceeding_id": "case-pa-puc-r-2025-3054394",
      "event_type": "final_order",
      "title": "Commission final order",
      "start_date": "2026-01-15",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-citizens-2026-outcome",
      "source_url": "https://www.puc.pa.gov/pcdocs/1910314.pdf",
      "state": "PA",
      "utility_id": "utility-citizens-electric",
      "utility_name": "Citizens' Electric",
      "docket_number": "R-2025-3054394"
    },
    {
      "id": "event-valley-final-order",
      "proceeding_id": "case-pa-puc-r-2025-3054393",
      "event_type": "final_order",
      "title": "Commission final order",
      "start_date": "2026-01-15",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-valley-2026-outcome",
      "source_url": "https://www.puc.pa.gov/pcdocs/1910269.pdf",
      "state": "PA",
      "utility_id": "utility-valley-energy",
      "utility_name": "Valley Energy",
      "docket_number": "R-2025-3054393"
    },
    {
      "id": "event-wellsboro-final-order",
      "proceeding_id": "case-pa-puc-r-2025-3054392",
      "event_type": "final_order",
      "title": "Commission final order",
      "start_date": "2026-01-15",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-wellsboro-2026-outcome",
      "source_url": "https://www.puc.pa.gov/pcdocs/1910304.pdf",
      "state": "PA",
      "utility_id": "utility-wellsboro-electric",
      "utility_name": "Wellsboro Electric",
      "docket_number": "R-2025-3054392"
    },
    {
      "id": "event-fl-fpl-final-order",
      "proceeding_id": "case-fl-fpl-20250011",
      "event_type": "final_order",
      "title": "Settlement approved",
      "start_date": "2026-01-21",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-fl-fpl-order",
      "source_url": "https://www.floridapsc.com/pscfiles/library/filings/2026/01085-2026/01085-2026.pdf",
      "state": "FL",
      "utility_id": "utility-fpl",
      "utility_name": "Florida Power & Light",
      "docket_number": "20250011-EI"
    },
    {
      "id": "event-il-26-0065-filed",
      "proceeding_id": "case-il-peoples-gas-26-0065",
      "event_type": "case_opened",
      "title": "General rate case filed",
      "start_date": "2026-01-21",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-il-icc-discovery-26-0065",
      "source_url": "https://www.icc.illinois.gov/docket/P2026-0065",
      "state": "IL",
      "utility_id": "utility-peoples-gas-il",
      "utility_name": "Peoples Gas",
      "docket_number": "26-0065"
    },
    {
      "id": "event-il-26-0066-filed",
      "proceeding_id": "case-il-north-shore-26-0066",
      "event_type": "case_opened",
      "title": "General rate case filed",
      "start_date": "2026-01-21",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-il-icc-discovery-26-0066",
      "source_url": "https://www.icc.illinois.gov/docket/P2026-0066",
      "state": "IL",
      "utility_id": "utility-north-shore-gas",
      "utility_name": "North Shore Gas",
      "docket_number": "26-0066"
    },
    {
      "id": "event-nfg-tariff-filed",
      "proceeding_id": "case-pa-puc-r-2025-3059428",
      "event_type": "tariff_filed",
      "title": "Public tariff filing submitted",
      "start_date": "2026-01-28",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nfg-filing-letter",
      "source_url": "https://www.puc.pa.gov/pcdocs/1912172.pdf",
      "state": "PA",
      "utility_id": "utility-national-fuel-gas-pa",
      "utility_name": "National Fuel Gas",
      "docket_number": "R-2025-3059428"
    },
    {
      "id": "event-ugi-gas-tariff-filed",
      "proceeding_id": "case-pa-puc-r-2025-3059523",
      "event_type": "tariff_filed",
      "title": "Public tariff filing submitted",
      "start_date": "2026-01-28",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-ugi-gas-suspension",
      "source_url": "https://www.puc.pa.gov/pcdocs/1916059.pdf",
      "state": "PA",
      "utility_id": "utility-ugi-gas",
      "utility_name": "UGI Gas",
      "docket_number": "R-2025-3059523"
    },
    {
      "id": "event-citizens-rates-effective",
      "proceeding_id": "case-pa-puc-r-2025-3054394",
      "event_type": "rates_effective",
      "title": "New base rates effective",
      "start_date": "2026-01-29",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-citizens-2026-outcome",
      "source_url": "https://www.puc.pa.gov/pcdocs/1910314.pdf",
      "state": "PA",
      "utility_id": "utility-citizens-electric",
      "utility_name": "Citizens' Electric",
      "docket_number": "R-2025-3054394"
    },
    {
      "id": "event-pa-puc-discovery-r-2025-3059428-posted",
      "proceeding_id": "case-pa-puc-r-2025-3059428",
      "event_type": "case_posted",
      "title": "Rate increase filing posted by Commission",
      "start_date": "2026-01-29",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-pa-puc-discovery-r-2025-3059428",
      "source_url": "https://www.puc.pa.gov/docket/R-2025-3059428",
      "state": "PA",
      "utility_id": "utility-national-fuel-gas-pa",
      "utility_name": "National Fuel Gas",
      "docket_number": "R-2025-3059428"
    },
    {
      "id": "event-valley-rates-effective",
      "proceeding_id": "case-pa-puc-r-2025-3054393",
      "event_type": "rates_effective",
      "title": "New base rates effective",
      "start_date": "2026-01-29",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-valley-2026-outcome",
      "source_url": "https://www.puc.pa.gov/pcdocs/1910269.pdf",
      "state": "PA",
      "utility_id": "utility-valley-energy",
      "utility_name": "Valley Energy",
      "docket_number": "R-2025-3054393"
    },
    {
      "id": "event-wellsboro-rates-effective",
      "proceeding_id": "case-pa-puc-r-2025-3054392",
      "event_type": "rates_effective",
      "title": "New base rates effective",
      "start_date": "2026-01-29",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-wellsboro-2026-outcome",
      "source_url": "https://www.puc.pa.gov/pcdocs/1910304.pdf",
      "state": "PA",
      "utility_id": "utility-wellsboro-electric",
      "utility_name": "Wellsboro Electric",
      "docket_number": "R-2025-3054392"
    },
    {
      "id": "event-il-26-0099-filed",
      "proceeding_id": "case-il-nicor-26-0099",
      "event_type": "case_opened",
      "title": "General rate case filed",
      "start_date": "2026-02-05",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-il-icc-discovery-26-0099",
      "source_url": "https://www.icc.illinois.gov/docket/P2026-0099",
      "state": "IL",
      "utility_id": "utility-nicor-gas",
      "utility_name": "Nicor Gas",
      "docket_number": "26-0099"
    },
    {
      "id": "event-policy-ny-large-load-26-e-0045-opened",
      "proceeding_id": "policy-ny-large-load-26-e-0045",
      "event_type": "case_opened",
      "title": "Proceeding opened",
      "start_date": "2026-02-12",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-ny-large-load",
      "source_url": "https://dps.ny.gov/event/comments-due-proceeding-motion-commission-address-interconnection-reforms-large-loads",
      "state": "NY",
      "utility_id": "utility-coned",
      "utility_name": "Con Edison",
      "docket_number": "26-E-0045"
    },
    {
      "id": "event-oh-puco-24-468-el-air-rehearing",
      "proceeding_id": "case-oh-puco-24-468-el-air",
      "event_type": "rehearing_decision",
      "title": "Second entry on rehearing issued",
      "start_date": "2026-02-18",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-oh-puco-24-468-el-air-rehearing",
      "source_url": "https://content.govdelivery.com/accounts/OHPUC/bulletins/40a718d",
      "state": "OH",
      "utility_id": "utility-ohio-edison",
      "utility_name": "Ohio Edison",
      "docket_number": "24-0468-EL-AIR"
    },
    {
      "id": "event-six-state-active-cumberland-final-order",
      "proceeding_id": "case-cumberland-gas-24-862-ga-air",
      "event_type": "final_order",
      "title": "PUCO approved final opinion and order",
      "start_date": "2026-02-18",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-six-state-active-cumberland-order",
      "source_url": "https://dam.assets.ohio.gov/image/upload/puco.ohio.gov/Commission%20minutes/2026/2-18-26-_executed.pdf",
      "state": "OH",
      "utility_id": "utility-cumberland-gas",
      "utility_name": "Cumberland Gas",
      "docket_number": "24-862-GA-AIR"
    },
    {
      "id": "event-dte-electric-u-21860-order",
      "proceeding_id": "case-dte-electric-u-21860",
      "event_type": "order_entered",
      "title": "Final order issued",
      "start_date": "2026-02-19",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-dte-electric-u-21860-official",
      "source_url": "https://www.michigan.gov/mpsc/commission/news-releases",
      "state": "MI",
      "utility_id": "utility-dte-electric",
      "utility_name": "DTE Electric",
      "docket_number": "U-21860"
    },
    {
      "id": "event-pa-puc-r-2025-3053499-2026-02-19-rehearing-decision",
      "proceeding_id": "case-pa-puc-r-2025-3053499",
      "event_type": "rehearing_decision",
      "title": "Commission entered reconsideration decision",
      "start_date": "2026-02-19",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-pa-puc-r-2025-3053499-docket",
      "source_url": "https://www.puc.pa.gov/docket/R-2025-3053499",
      "state": "PA",
      "utility_id": "utility-columbia-gas-pa",
      "utility_name": "Columbia Gas of Pennsylvania",
      "docket_number": "R-2025-3053499"
    },
    {
      "id": "event-peoples-case-received",
      "proceeding_id": "case-pa-puc-r-2026-3060855",
      "event_type": "case_received",
      "title": "Case record received by Commission",
      "start_date": "2026-02-24",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-peoples-docket",
      "source_url": "https://www.puc.pa.gov/docket/R-2026-3060855",
      "state": "PA",
      "utility_id": "utility-peoples-natural-gas",
      "utility_name": "Peoples Natural Gas",
      "docket_number": "R-2026-3060855"
    },
    {
      "id": "event-oh-puco-24-468-el-air-rates-effective",
      "proceeding_id": "case-oh-puco-24-468-el-air",
      "event_type": "rates_effective",
      "title": "Revised distribution rates effective",
      "start_date": "2026-03-01",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-oh-puco-24-468-el-air-rehearing",
      "source_url": "https://content.govdelivery.com/accounts/OHPUC/bulletins/40a718d",
      "state": "OH",
      "utility_id": "utility-ohio-edison",
      "utility_name": "Ohio Edison",
      "docket_number": "24-0468-EL-AIR"
    },
    {
      "id": "event-peoples-case-posted",
      "proceeding_id": "case-pa-puc-r-2026-3060855",
      "event_type": "case_posted",
      "title": "Case record posted by Commission",
      "start_date": "2026-03-04",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-peoples-docket",
      "source_url": "https://www.puc.pa.gov/docket/R-2026-3060855",
      "state": "PA",
      "utility_id": "utility-peoples-natural-gas",
      "utility_name": "Peoples Natural Gas",
      "docket_number": "R-2026-3060855"
    },
    {
      "id": "event-dte-electric-u21860-rates-effective",
      "proceeding_id": "case-dte-electric-u-21860",
      "event_type": "rates_effective",
      "title": "Authorized rates took effect",
      "start_date": "2026-03-05",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-dte-2026-q1-regulatory-update-page-27",
      "source_url": "https://www.sec.gov/Archives/edgar/data/936340/000093634026000081/dte-20260331.htm",
      "state": "MI",
      "utility_id": "utility-dte-electric",
      "utility_name": "DTE Electric",
      "docket_number": "U-21860"
    },
    {
      "id": "event-dte-gas-u-21973-ag-testimony-filed",
      "proceeding_id": "case-dte-gas-u-21973",
      "event_type": "intervenor_testimony",
      "title": "Michigan Attorney General testimony filed",
      "start_date": "2026-03-13",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-dte-gas-u-21973-ag-testimony-announcement",
      "source_url": "https://www.michigan.gov/ag/news/press-releases/2026/03/20/ag-nessel-seeks-to-slash-dte-rate-hike",
      "state": "MI",
      "utility_id": "utility-dte-gas",
      "utility_name": "DTE Gas",
      "docket_number": "U-21973"
    },
    {
      "id": "event-ppl-settlement-filed",
      "proceeding_id": "case-pa-puc-r-2025-3057164",
      "event_type": "settlement_filed",
      "title": "Non-unanimous settlement filed",
      "start_date": "2026-03-13",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-ppl-settlement-revenue",
      "source_url": "https://www.puc.pa.gov/pcdocs/1918030.pdf",
      "state": "PA",
      "utility_id": "utility-ppl-electric",
      "utility_name": "PPL Electric",
      "docket_number": "R-2025-3057164"
    },
    {
      "id": "event-six-state-active-suburban-final-order",
      "proceeding_id": "case-suburban-natural-gas-25-553-ga-air",
      "event_type": "final_order",
      "title": "PUCO approved unopposed settlement",
      "start_date": "2026-03-18",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-six-state-active-suburban-order",
      "source_url": "https://content.govdelivery.com/accounts/OHPUC/bulletins/40eba7c",
      "state": "OH",
      "utility_id": "utility-suburban-natural-gas",
      "utility_name": "Suburban Natural Gas",
      "docket_number": "25-553-GA-AIR"
    },
    {
      "id": "event-consumers-energy-u-21870-order",
      "proceeding_id": "case-consumers-energy-u-21870",
      "event_type": "order_entered",
      "title": "Final order issued",
      "start_date": "2026-03-27",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-consumers-energy-u-21870-official",
      "source_url": "https://www.michigan.gov/mpsc/commission/news-releases/2026/03/27/commission-approves-additional-reliability-investments",
      "state": "MI",
      "utility_id": "utility-consumers-energy",
      "utility_name": "Consumers Energy",
      "docket_number": "U-21870"
    },
    {
      "id": "event-peoples-tariff-filed",
      "proceeding_id": "case-pa-puc-r-2026-3060855",
      "event_type": "tariff_filed",
      "title": "Public tariff filing submitted",
      "start_date": "2026-03-27",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-peoples-docket",
      "source_url": "https://www.puc.pa.gov/docket/R-2026-3060855",
      "state": "PA",
      "utility_id": "utility-peoples-natural-gas",
      "utility_name": "Peoples Natural Gas",
      "docket_number": "R-2026-3060855"
    },
    {
      "id": "event-ugi-electric-tariff-filed",
      "proceeding_id": "case-pa-puc-r-2025-3059430",
      "event_type": "tariff_filed",
      "title": "Public tariff filing submitted",
      "start_date": "2026-03-27",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-ugi-electric-statement",
      "source_url": "https://www.puc.pa.gov/pcdocs/1920863.pdf",
      "state": "PA",
      "utility_id": "utility-ugi-electric",
      "utility_name": "UGI Electric",
      "docket_number": "R-2025-3059430"
    },
    {
      "id": "event-nfg-proposed-effective",
      "proceeding_id": "case-pa-puc-r-2025-3059428",
      "event_type": "proposed_effective",
      "title": "Proposed tariff effective date",
      "start_date": "2026-03-29",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "utility_guidance",
      "status": "completed",
      "condition_text": "Proposed date only; the tariff was suspended.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nfg-filing-letter",
      "source_url": "https://www.puc.pa.gov/pcdocs/1912172.pdf",
      "state": "PA",
      "utility_id": "utility-national-fuel-gas-pa",
      "utility_name": "National Fuel Gas",
      "docket_number": "R-2025-3059428"
    },
    {
      "id": "event-ugi-gas-proposed-effective",
      "proceeding_id": "case-pa-puc-r-2025-3059523",
      "event_type": "proposed_effective",
      "title": "Proposed tariff effective date",
      "start_date": "2026-03-29",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "utility_guidance",
      "status": "completed",
      "condition_text": "Proposed date only; the tariff was suspended.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-ugi-gas-suspension",
      "source_url": "https://www.puc.pa.gov/pcdocs/1916059.pdf",
      "state": "PA",
      "utility_id": "utility-ugi-gas",
      "utility_name": "UGI Gas",
      "docket_number": "R-2025-3059523"
    },
    {
      "id": "event-pa-puc-r-2026-3060859-2026-03-30-filed",
      "proceeding_id": "case-pa-puc-r-2026-3060859",
      "event_type": "application_filed",
      "title": "Electric distribution rate application filed",
      "start_date": "2026-03-30",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-pa-puc-r-2026-3060859-docket",
      "source_url": "https://www.puc.pa.gov/docket/R-2026-3060859",
      "state": "PA",
      "utility_id": "utility-peco-electric",
      "utility_name": "PECO Electric",
      "docket_number": "R-2026-3060859"
    },
    {
      "id": "event-pa-puc-r-2026-3060860-2026-03-30-filed",
      "proceeding_id": "case-pa-puc-r-2026-3060860",
      "event_type": "application_filed",
      "title": "Gas distribution rate application filed",
      "start_date": "2026-03-30",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-pa-puc-r-2026-3060860-docket",
      "source_url": "https://www.puc.pa.gov/docket/R-2026-3060860",
      "state": "PA",
      "utility_id": "utility-peco-gas",
      "utility_name": "PECO Gas",
      "docket_number": "R-2026-3060860"
    },
    {
      "id": "event-pa-puc-discovery-r-2026-3060859-posted",
      "proceeding_id": "case-pa-puc-r-2026-3060859",
      "event_type": "case_posted",
      "title": "Rate increase filing posted by Commission",
      "start_date": "2026-03-31",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-pa-puc-discovery-r-2026-3060859",
      "source_url": "https://www.puc.pa.gov/docket/R-2026-3060859",
      "state": "PA",
      "utility_id": "utility-peco-electric",
      "utility_name": "PECO Electric",
      "docket_number": "R-2026-3060859"
    },
    {
      "id": "event-pa-puc-discovery-r-2026-3060860-posted",
      "proceeding_id": "case-pa-puc-r-2026-3060860",
      "event_type": "case_posted",
      "title": "Rate increase filing posted by Commission",
      "start_date": "2026-03-31",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-pa-puc-discovery-r-2026-3060860",
      "source_url": "https://www.puc.pa.gov/docket/R-2026-3060860",
      "state": "PA",
      "utility_id": "utility-peco-gas",
      "utility_name": "PECO Gas",
      "docket_number": "R-2026-3060860"
    },
    {
      "id": "event-case-wi-we-5-ur-112-opened",
      "proceeding_id": "case-wi-we-5-ur-112",
      "event_type": "application_filed",
      "title": "Application filed",
      "start_date": "2026-04-01",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-wi-discovery-5-ur-112",
      "source_url": "https://apps.psc.wi.gov/ERF/ERFview/viewdoc.aspx?docid=586099",
      "state": "WI",
      "utility_id": "utility-wisconsin-electric",
      "utility_name": "We Energies",
      "docket_number": "5-UR-112"
    },
    {
      "id": "event-il-26-0331-filed",
      "proceeding_id": "case-il-midamerican-26-0331",
      "event_type": "case_opened",
      "title": "General rate case filed",
      "start_date": "2026-04-09",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-il-icc-discovery-26-0331",
      "source_url": "https://www.icc.illinois.gov/docket/P2026-0331",
      "state": "IL",
      "utility_id": "utility-midamerican-illinois",
      "utility_name": "MidAmerican Energy — Illinois",
      "docket_number": "26-0331"
    },
    {
      "id": "event-il-26-0332-filed",
      "proceeding_id": "case-il-midamerican-26-0332",
      "event_type": "case_opened",
      "title": "General rate case filed",
      "start_date": "2026-04-09",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-il-icc-discovery-26-0332",
      "source_url": "https://www.icc.illinois.gov/docket/P2026-0332",
      "state": "IL",
      "utility_id": "utility-midamerican-illinois",
      "utility_name": "MidAmerican Energy — Illinois",
      "docket_number": "26-0332"
    },
    {
      "id": "event-pa-puc-r-2026-3060859-2026-04-16-withdrawal-requested",
      "proceeding_id": "case-pa-puc-r-2026-3060859",
      "event_type": "other_material_event",
      "title": "Petition to withdraw application filed",
      "start_date": "2026-04-16",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-exelon-2026-peco-rate-case-withdrawal",
      "source_url": "https://www.sec.gov/Archives/edgar/data/9466/000110935726000046/exc-20260413.htm",
      "state": "PA",
      "utility_id": "utility-peco-electric",
      "utility_name": "PECO Electric",
      "docket_number": "R-2026-3060859"
    },
    {
      "id": "event-pa-puc-r-2026-3060860-2026-04-16-withdrawal-requested",
      "proceeding_id": "case-pa-puc-r-2026-3060860",
      "event_type": "other_material_event",
      "title": "Petition to withdraw application filed",
      "start_date": "2026-04-16",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-exelon-2026-peco-gas-rate-case-withdrawal",
      "source_url": "https://www.sec.gov/Archives/edgar/data/9466/000110935726000046/exc-20260413.htm",
      "state": "PA",
      "utility_id": "utility-peco-gas",
      "utility_name": "PECO Gas",
      "docket_number": "R-2026-3060860"
    },
    {
      "id": "event-oncor-58306-final-order",
      "proceeding_id": "case-oncor-58306",
      "event_type": "order_entered",
      "title": "PUCT approved the unopposed agreement",
      "start_date": "2026-04-17",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-oncor-58306-authorized-revenue-capital",
      "source_url": "https://interchange.puc.texas.gov/Documents/58306_755_1624444.PDF",
      "state": "TX",
      "utility_id": "utility-oncor",
      "utility_name": "Oncor",
      "docket_number": "58306"
    },
    {
      "id": "event-fl-fcg-filed",
      "proceeding_id": "case-fl-fcg-20260026",
      "event_type": "case_opened",
      "title": "Rate application filed",
      "start_date": "2026-04-20",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-fl-fcg-application",
      "source_url": "https://www.floridapsc.com/pscfiles/library/filings/2026/02270-2026/02270-2026.pdf",
      "state": "FL",
      "utility_id": "utility-florida-city-gas",
      "utility_name": "Florida City Gas",
      "docket_number": "20260026-GU"
    },
    {
      "id": "event-fl-duke-large-load-filed",
      "proceeding_id": "action-fl-def-20260064",
      "event_type": "case_opened",
      "title": "Large-load tariff filed",
      "start_date": "2026-04-22",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-fl-duke-large-load",
      "source_url": "https://www.floridapsc.com/pscfiles/library/filings/2026/02327-2026/02327-2026.pdf",
      "state": "FL",
      "utility_id": "utility-duke-florida",
      "utility_name": "Duke Energy Florida",
      "docket_number": "20260064-EI"
    },
    {
      "id": "event-nj-bpu-gr25110627-2026-04-22-second-suspension",
      "proceeding_id": "case-nj-bpu-gr25110627",
      "event_type": "suspension_order",
      "title": "Board further suspended the proposed rates",
      "start_date": "2026-04-22",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nj-bpu-gr25110627-second-suspension",
      "source_url": "https://www.nj.gov/bpu/pdf/boardorders/2026/20260422/IIB%20ORDER%20%20SJG%2025%20BRC%202nd%20Suspension.pdf",
      "state": "NJ",
      "utility_id": "utility-south-jersey-gas",
      "utility_name": "South Jersey Gas",
      "docket_number": "GR25110627"
    },
    {
      "id": "event-dte-electric-u22046-application-filed",
      "proceeding_id": "case-dte-electric-u-22046",
      "event_type": "application_filed",
      "title": "DTE Electric filed its rate application",
      "start_date": "2026-04-28",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-dte-2026-q1-regulatory-update-page-27",
      "source_url": "https://www.sec.gov/Archives/edgar/data/936340/000093634026000081/dte-20260331.htm",
      "state": "MI",
      "utility_id": "utility-dte-electric",
      "utility_name": "DTE Electric",
      "docket_number": "U-22046"
    },
    {
      "id": "event-pa-puc-r-2026-3060859-2026-04-30-closed",
      "proceeding_id": "case-pa-puc-r-2026-3060859",
      "event_type": "case_closed",
      "title": "Commission granted withdrawal and closed docket",
      "start_date": "2026-04-30",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-pa-puc-r-2026-3060859-withdrawal-order",
      "source_url": "https://www.puc.pa.gov/pcdocs/1926671.pdf",
      "state": "PA",
      "utility_id": "utility-peco-electric",
      "utility_name": "PECO Electric",
      "docket_number": "R-2026-3060859"
    },
    {
      "id": "event-pa-puc-r-2026-3060860-2026-04-30-closed",
      "proceeding_id": "case-pa-puc-r-2026-3060860",
      "event_type": "case_closed",
      "title": "Commission granted withdrawal and closed docket",
      "start_date": "2026-04-30",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-pa-puc-r-2026-3060860-withdrawal-order",
      "source_url": "https://www.puc.pa.gov/pcdocs/1926673.pdf",
      "state": "PA",
      "utility_id": "utility-peco-gas",
      "utility_name": "PECO Gas",
      "docket_number": "R-2026-3060860"
    },
    {
      "id": "event-wi-wpl-6680-te-115-commission-decision",
      "proceeding_id": "action-wi-wpl-6680-te-115",
      "event_type": "commission_action",
      "title": "Commission issues preliminary decision modifying agreement",
      "start_date": "2026-05-07",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-wi-6680-overview",
      "source_url": "https://psc.wi.gov/Documents/PressReleases/05.08.26PressRelease.PDF",
      "state": "WI",
      "utility_id": "utility-wisconsin-power-light",
      "utility_name": "Alliant Energy — Wisconsin",
      "docket_number": "6680-TE-115"
    },
    {
      "id": "event-pa-model-large-load-final-order",
      "proceeding_id": "policy-pa-puc-model-large-load-tariff",
      "event_type": "final_order",
      "title": "Final model-tariff order entered",
      "start_date": "2026-05-12",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-pa-model-large-load-final-order",
      "source_url": "https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-22/56_22_not.pdf",
      "state": "PA",
      "utility_id": null,
      "utility_name": null,
      "docket_number": "M-2025-3054271"
    },
    {
      "id": "event-pa-model-large-load-tariff-order-entered",
      "proceeding_id": "policy-pa-puc-model-large-load-tariff",
      "event_type": "order_entered",
      "title": "Commission policy order entered",
      "start_date": "2026-05-12",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-pa-model-large-load-final-order",
      "source_url": "https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-22/56_22_not.pdf",
      "state": "PA",
      "utility_id": null,
      "utility_name": null,
      "docket_number": "M-2025-3054271"
    },
    {
      "id": "event-columbia-gas-virginia-2026-application-completed",
      "proceeding_id": "case-columbia-gas-virginia-pur-2026-00014",
      "event_type": "application_filed",
      "title": "Multi-year rate-plan application completed",
      "start_date": "2026-05-14",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": "Public and confidential application versions were first filed May 7; revised schedules completed the filing May 14.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-columbia-gas-virginia-2026-order-filing",
      "source_url": "https://www.scc.virginia.gov/docketsearch/DOCS/8d0901%21.PDF",
      "state": "VA",
      "utility_id": "utility-columbia-gas-virginia",
      "utility_name": "Columbia Gas of Virginia",
      "docket_number": "PUR-2026-00014"
    },
    {
      "id": "event-action-wi-we-6630-te-113-final-decision",
      "proceeding_id": "action-wi-we-6630-te-113",
      "event_type": "final_order",
      "title": "Final decision issued",
      "start_date": "2026-05-21",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-wi-6630-credit-support",
      "source_url": "https://apps.psc.wi.gov/ERF/ERFview/viewdoc.aspx?docid=593737",
      "state": "WI",
      "utility_id": "utility-wisconsin-electric",
      "utility_name": "We Energies",
      "docket_number": "6630-TE-113"
    },
    {
      "id": "event-appalachian-power-2026-application-filed",
      "proceeding_id": "case-appalachian-power-pur-2026-00044",
      "event_type": "application_filed",
      "title": "Biennial base-rate application filed",
      "start_date": "2026-05-29",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-appalachian-power-2026-order-filing",
      "source_url": "https://www.scc.virginia.gov/docketsearch/DOCS/8d1401%21.PDF",
      "state": "VA",
      "utility_id": "utility-appalachian-power-va",
      "utility_name": "Appalachian Power",
      "docket_number": "PUR-2026-00044"
    },
    {
      "id": "event-tnmp-58964-settlement-filed",
      "proceeding_id": "case-tnmp-58964",
      "event_type": "settlement_filed",
      "title": "TNMP filed the unopposed comprehensive settlement",
      "start_date": "2026-05-29",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "proposed_settlement",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-tnmp-58964-settlement-economics",
      "source_url": "https://www.sec.gov/Archives/edgar/data/22767/000110842626000030/txnm06012026ex991.htm",
      "state": "TX",
      "utility_id": "utility-tnmp",
      "utility_name": "TNMP",
      "docket_number": "58964"
    },
    {
      "id": "event-nj-bpu-gr26060278-2026-06-01-filed",
      "proceeding_id": "case-nj-bpu-gr26060278",
      "event_type": "application_filed",
      "title": "Base rate petition filed",
      "start_date": "2026-06-01",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nj-bpu-gr26060278-suspension-order",
      "source_url": "https://www.nj.gov/bpu/pdf/boardorders/2026/20260630/IIA%20ORDER%20NJNG%20BRC%201st%20Suspension.pdf",
      "state": "NJ",
      "utility_id": "utility-new-jersey-natural-gas",
      "utility_name": "New Jersey Natural Gas",
      "docket_number": "GR26060278"
    },
    {
      "id": "event-oncor-58306-rates-effective",
      "proceeding_id": "case-oncor-58306",
      "event_type": "rates_effective",
      "title": "Authorized base rates became effective",
      "start_date": "2026-06-01",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": "Effective for electricity bills rendered on and after 45 days from the date of the final order.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-oncor-58306-authorized-revenue-capital",
      "source_url": "https://interchange.puc.texas.gov/Documents/58306_755_1624444.PDF",
      "state": "TX",
      "utility_id": "utility-oncor",
      "utility_name": "Oncor",
      "docket_number": "58306"
    },
    {
      "id": "event-ugi-electric-proposed-effective",
      "proceeding_id": "case-pa-puc-r-2025-3059430",
      "event_type": "proposed_effective",
      "title": "Proposed tariff effective date",
      "start_date": "2026-06-01",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "utility_guidance",
      "status": "completed",
      "condition_text": "Proposed date only; the tariff was suspended.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-ugi-electric-statement",
      "source_url": "https://www.puc.pa.gov/pcdocs/1920863.pdf",
      "state": "PA",
      "utility_id": "utility-ugi-electric",
      "utility_name": "UGI Electric",
      "docket_number": "R-2025-3059430"
    },
    {
      "id": "event-consumers-energy-u-22070-application-filed",
      "proceeding_id": "case-consumers-energy-u-22070",
      "event_type": "application_filed",
      "title": "Electric rate application filed",
      "start_date": "2026-06-02",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-consumers-energy-u-22070-ag-filing-announcement",
      "source_url": "https://www.michigan.gov/ag/news/press-releases/2026/06/02/ag-nessel-to-intervene-in-consumers-energy-massive-456m-rate-hike-request",
      "state": "MI",
      "utility_id": "utility-consumers-energy",
      "utility_name": "Consumers Energy",
      "docket_number": "U-22070"
    },
    {
      "id": "event-ppl-commission-action",
      "proceeding_id": "case-pa-puc-r-2025-3057164",
      "event_type": "commission_action",
      "title": "Commission acted at public meeting",
      "start_date": "2026-06-04",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-ppl-final-order-dates",
      "source_url": "https://www.puc.pa.gov/pcdocs/1934703.pdf",
      "state": "PA",
      "utility_id": "utility-ppl-electric",
      "utility_name": "PPL Electric",
      "docket_number": "R-2025-3057164"
    },
    {
      "id": "event-ppl-order-adopted",
      "proceeding_id": "case-pa-puc-r-2025-3057164",
      "event_type": "order_adopted",
      "title": "Rewrite opinion and order adopted",
      "start_date": "2026-06-04",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-ppl-final-order-dates",
      "source_url": "https://www.puc.pa.gov/pcdocs/1934703.pdf",
      "state": "PA",
      "utility_id": "utility-ppl-electric",
      "utility_name": "PPL Electric",
      "docket_number": "R-2025-3057164"
    },
    {
      "id": "event-action-wi-we-6630-te-113-rehearing-petition",
      "proceeding_id": "action-wi-we-6630-te-113",
      "event_type": "rehearing_filed",
      "title": "We Energies and developers seek rehearing",
      "start_date": "2026-06-10",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": "Petition sought discretion to modify financial support and a project-specific 10% letter-of-credit / 90% parent-guarantee structure for Oracle.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-wi-6630-credit-support",
      "source_url": "https://apps.psc.wi.gov/ERF/ERFview/viewdoc.aspx?docid=593737",
      "state": "WI",
      "utility_id": "utility-wisconsin-electric",
      "utility_name": "We Energies",
      "docket_number": "6630-TE-113"
    },
    {
      "id": "event-ppl-order-entered",
      "proceeding_id": "case-pa-puc-r-2025-3057164",
      "event_type": "order_entered",
      "title": "Rewrite opinion and order entered",
      "start_date": "2026-06-11",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-ppl-final-order-dates",
      "source_url": "https://www.puc.pa.gov/pcdocs/1934703.pdf",
      "state": "PA",
      "utility_id": "utility-ppl-electric",
      "utility_name": "PPL Electric",
      "docket_number": "R-2025-3057164"
    },
    {
      "id": "event-six-state-active-ppl-final-order",
      "proceeding_id": "case-pa-puc-r-2025-3057164",
      "event_type": "final_order",
      "title": "Final opinion and order entered",
      "start_date": "2026-06-11",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-ppl-final-order-dates",
      "source_url": "https://www.puc.pa.gov/pcdocs/1934703.pdf",
      "state": "PA",
      "utility_id": "utility-ppl-electric",
      "utility_name": "PPL Electric",
      "docket_number": "R-2025-3057164"
    },
    {
      "id": "event-action-wi-we-6630-te-113-oracle-lawsuit",
      "proceeding_id": "action-wi-we-6630-te-113",
      "event_type": "appeal_filed",
      "title": "Oracle files circuit-court challenge",
      "start_date": "2026-06-19",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "procedural_inference",
      "status": "completed",
      "condition_text": "Oracle asked Ozaukee County Circuit Court to overturn the financial-support provisions.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-wi-6630-post-order-status",
      "source_url": "https://milwaukeecourier.com/news/2026/07/10/wisconsin-regulators-refuse-to-loosen-data-center-credit-rules-setting-up-oracle-court-fight",
      "state": "WI",
      "utility_id": "utility-wisconsin-electric",
      "utility_name": "We Energies",
      "docket_number": "6630-TE-113"
    },
    {
      "id": "event-columbia-gas-virginia-2026-order-for-notice",
      "proceeding_id": "case-columbia-gas-virginia-pur-2026-00014",
      "event_type": "order_entered",
      "title": "Order for notice and hearing entered",
      "start_date": "2026-06-22",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-columbia-gas-virginia-2026-order-filing",
      "source_url": "https://www.scc.virginia.gov/docketsearch/DOCS/8d0901%21.PDF",
      "state": "VA",
      "utility_id": "utility-columbia-gas-virginia",
      "utility_name": "Columbia Gas of Virginia",
      "docket_number": "PUR-2026-00014"
    },
    {
      "id": "event-appalachian-power-2026-order-for-notice",
      "proceeding_id": "case-appalachian-power-pur-2026-00044",
      "event_type": "order_entered",
      "title": "Order for notice and hearing entered",
      "start_date": "2026-06-23",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-appalachian-power-2026-order-filing",
      "source_url": "https://www.scc.virginia.gov/docketsearch/DOCS/8d1401%21.PDF",
      "state": "VA",
      "utility_id": "utility-appalachian-power-va",
      "utility_name": "Appalachian Power",
      "docket_number": "PUR-2026-00044"
    },
    {
      "id": "event-ppl-reconsideration-filed",
      "proceeding_id": "case-pa-puc-r-2025-3057164",
      "event_type": "reconsideration_filed",
      "title": "Petition for reconsideration and clarification filed",
      "start_date": "2026-06-26",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-ppl-reconsideration-order",
      "source_url": "https://www.puc.pa.gov/pcdocs/1938524.pdf",
      "state": "PA",
      "utility_id": "utility-ppl-electric",
      "utility_name": "PPL Electric",
      "docket_number": "R-2025-3057164"
    },
    {
      "id": "event-nj-bpu-er25060374-2026-06-30-final-order",
      "proceeding_id": "case-nj-bpu-er25060374",
      "event_type": "order_entered",
      "title": "Board approved settlement",
      "start_date": "2026-06-30",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nj-bpu-er25060374-order",
      "source_url": "https://www.nj.gov/bpu/pdf/boardorders/2026/20260630/2D%20ORDER%20RECO%20Base%20Rate%20Case.pdf",
      "state": "NJ",
      "utility_id": "utility-rockland-electric",
      "utility_name": "Rockland Electric",
      "docket_number": "ER25060374"
    },
    {
      "id": "event-nj-bpu-gr26060278-2026-06-30-suspension-order",
      "proceeding_id": "case-nj-bpu-gr26060278",
      "event_type": "suspension_order",
      "title": "Board suspended proposed rates and opened an investigation",
      "start_date": "2026-06-30",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nj-bpu-gr26060278-suspension-order",
      "source_url": "https://www.nj.gov/bpu/pdf/boardorders/2026/20260630/IIA%20ORDER%20NJNG%20BRC%201st%20Suspension.pdf",
      "state": "NJ",
      "utility_id": "utility-new-jersey-natural-gas",
      "utility_name": "New Jersey Natural Gas",
      "docket_number": "GR26060278"
    },
    {
      "id": "event-action-nj-rockland-sc7-action",
      "proceeding_id": "case-nj-bpu-er25060374",
      "event_type": "rates_effective",
      "title": "Rockland Electric SC7 High Voltage Distribution",
      "start_date": "2026-07-01",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": "The BPU-approved SC7 option is a delivery tariff for qualifying Rockland Electric customers. It is the reviewed New Jersey precedent, not a statewide large-load customer-protection framework.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-market-nj-rockland-sc7-order",
      "source_url": "https://www.nj.gov/bpu/pdf/boardorders/2008/9-12-08-2D.pdf",
      "state": "NJ",
      "utility_id": "utility-rockland-electric",
      "utility_name": "Rockland Electric",
      "docket_number": "ER25060374"
    },
    {
      "id": "event-action-pa-ppl-lp6-action",
      "proceeding_id": "case-pa-puc-r-2025-3057164",
      "event_type": "rates_effective",
      "title": "PPL Electric Rate Schedule LP-6",
      "start_date": "2026-07-01",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": "PPL Electric's approved LP-6 schedule is an enforceable utility tariff with staged minimum-demand obligations, upgrade security, an exit fee, and advance payment for directly assigned facilities.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-market-pa-ppl-lp6-order",
      "source_url": "https://www.puc.pa.gov/pcdocs/1934703.pdf",
      "state": "PA",
      "utility_id": "utility-ppl-electric",
      "utility_name": "PPL Electric",
      "docket_number": "R-2025-3057164"
    },
    {
      "id": "event-nj-bpu-er25060374-2026-07-01-rates-effective",
      "proceeding_id": "case-nj-bpu-er25060374",
      "event_type": "rates_effective",
      "title": "Revised base rates became effective",
      "start_date": "2026-07-01",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nj-bpu-er25060374-order",
      "source_url": "https://www.nj.gov/bpu/pdf/boardorders/2026/20260630/2D%20ORDER%20RECO%20Base%20Rate%20Case.pdf",
      "state": "NJ",
      "utility_id": "utility-rockland-electric",
      "utility_name": "Rockland Electric",
      "docket_number": "ER25060374"
    },
    {
      "id": "event-ppl-rates-effective",
      "proceeding_id": "case-pa-puc-r-2025-3057164",
      "event_type": "rates_effective",
      "title": "Authorized distribution rates became effective",
      "start_date": "2026-07-01",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-ppl-final-order-revenue",
      "source_url": "https://www.puc.pa.gov/pcdocs/1934703.pdf",
      "state": "PA",
      "utility_id": "utility-ppl-electric",
      "utility_name": "PPL Electric",
      "docket_number": "R-2025-3057164"
    },
    {
      "id": "event-nfg-reply-briefs",
      "proceeding_id": "case-pa-puc-r-2025-3059428",
      "event_type": "brief_deadline",
      "title": "Reply briefs filed",
      "start_date": "2026-07-02",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nfg-docket",
      "source_url": "https://www.puc.pa.gov/docket/R-2025-3059428",
      "state": "PA",
      "utility_id": "utility-national-fuel-gas-pa",
      "utility_name": "National Fuel Gas",
      "docket_number": "R-2025-3059428"
    },
    {
      "id": "event-ppl-reconsideration-order",
      "proceeding_id": "case-pa-puc-r-2025-3057164",
      "event_type": "reconsideration_order_entered",
      "title": "Reconsideration granted pending merits review",
      "start_date": "2026-07-08",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-ppl-reconsideration-order",
      "source_url": "https://www.puc.pa.gov/pcdocs/1938524.pdf",
      "state": "PA",
      "utility_id": "utility-ppl-electric",
      "utility_name": "PPL Electric",
      "docket_number": "R-2025-3057164"
    },
    {
      "id": "event-six-state-active-aes-public-hearing-1",
      "proceeding_id": "case-aes-ohio-25-958-el-air",
      "event_type": "public_input_hearing",
      "title": "Local public hearing",
      "start_date": "2026-07-09",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-six-state-active-aes",
      "source_url": "https://dis.puc.state.oh.us/ViewImage.aspx?CMID=A1001001A25K10B31539F00132",
      "state": "OH",
      "utility_id": "utility-aes-ohio",
      "utility_name": "AES Ohio",
      "docket_number": "25-958-EL-AIR"
    },
    {
      "id": "event-ugi-electric-hearing-notice",
      "proceeding_id": "case-pa-puc-r-2025-3059430",
      "event_type": "other_material_event",
      "title": "Evidentiary hearing notice published",
      "start_date": "2026-07-09",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-ugi-electric-hearing",
      "source_url": "https://www.puc.pa.gov/pcdocs/1938904.pdf",
      "state": "PA",
      "utility_id": "utility-ugi-electric",
      "utility_name": "UGI Electric",
      "docket_number": "R-2025-3059430"
    },
    {
      "id": "event-ugi-gas-settlement-filed",
      "proceeding_id": "case-pa-puc-r-2025-3059523",
      "event_type": "settlement_filed",
      "title": "Joint settlement filed; approval pending",
      "start_date": "2026-07-09",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": "The settlement document is dated July 6 and was filed and published July 9.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-ugi-gas-docket",
      "source_url": "https://www.puc.pa.gov/docket/R-2025-3059523",
      "state": "PA",
      "utility_id": "utility-ugi-gas",
      "utility_name": "UGI Gas",
      "docket_number": "R-2025-3059523"
    },
    {
      "id": "event-action-wi-we-6630-te-113-rehearing-lapsed",
      "proceeding_id": "action-wi-we-6630-te-113",
      "event_type": "rehearing_decision",
      "title": "Commission leaves credit requirements in place",
      "start_date": "2026-07-10",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "statutory_deadline",
      "status": "completed",
      "condition_text": "The Commission did not schedule action before the rehearing deadline; the court challenge remains pending.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-wi-6630-post-order-status",
      "source_url": "https://milwaukeecourier.com/news/2026/07/10/wisconsin-regulators-refuse-to-loosen-data-center-credit-rules-setting-up-oracle-court-fight",
      "state": "WI",
      "utility_id": "utility-wisconsin-electric",
      "utility_name": "We Energies",
      "docket_number": "6630-TE-113"
    },
    {
      "id": "event-six-state-active-roanoke-hearing",
      "proceeding_id": "case-roanoke-gas-pur-2025-00209",
      "event_type": "evidentiary_hearing",
      "title": "Evidentiary hearing",
      "start_date": "2026-07-15",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-six-state-active-roanoke",
      "source_url": "https://www.scc.virginia.gov/docketsearch/DOCS/89sp01%21.PDF",
      "state": "VA",
      "utility_id": "utility-roanoke-gas",
      "utility_name": "Roanoke Gas",
      "docket_number": "PUR-2025-00209"
    },
    {
      "id": "event-ugi-gas-comments-due",
      "proceeding_id": "case-pa-puc-r-2025-3059523",
      "event_type": "brief_deadline",
      "title": "Settlement comments due",
      "start_date": "2026-07-15",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "overdue_unreconciled",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-ugi-gas-settlement-terms",
      "source_url": "https://www.puc.pa.gov/pcdocs/1938705.pdf",
      "state": "PA",
      "utility_id": "utility-ugi-gas",
      "utility_name": "UGI Gas",
      "docket_number": "R-2025-3059523"
    },
    {
      "id": "event-six-state-active-aes-public-hearing-2",
      "proceeding_id": "case-aes-ohio-25-958-el-air",
      "event_type": "public_input_hearing",
      "title": "Local public hearing",
      "start_date": "2026-07-16",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-six-state-active-aes",
      "source_url": "https://dis.puc.state.oh.us/ViewImage.aspx?CMID=A1001001A25K10B31539F00132",
      "state": "OH",
      "utility_id": "utility-aes-ohio",
      "utility_name": "AES Ohio",
      "docket_number": "25-958-EL-AIR"
    },
    {
      "id": "event-tnmp-58964-proposed-order-exceptions-deadline",
      "proceeding_id": "case-tnmp-58964",
      "event_type": "brief_due",
      "title": "Corrections or exceptions to the proposed order due",
      "start_date": "2026-07-20",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "scheduled",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-tnmp-58964-proposed-order-deadline",
      "source_url": "https://interchange.puc.texas.gov/Documents/58964_616_1664118.PDF",
      "state": "TX",
      "utility_id": "utility-tnmp",
      "utility_name": "TNMP",
      "docket_number": "58964"
    },
    {
      "id": "event-tnmp-58964-proposed-order-exceptions-deadline-completed",
      "proceeding_id": "case-tnmp-58964",
      "event_type": "brief_due",
      "title": "Corrections or exceptions to the proposed order due",
      "start_date": "2026-07-20",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": "event-tnmp-58964-proposed-order-exceptions-deadline",
      "citation_id": "citation-tnmp-58964-proposed-order-deadline",
      "source_url": "https://interchange.puc.texas.gov/Documents/58964_616_1664118.PDF",
      "state": "TX",
      "utility_id": "utility-tnmp",
      "utility_name": "TNMP",
      "docket_number": "58964"
    },
    {
      "id": "event-nc-dec-e7-sub-1329-hearing",
      "proceeding_id": "case-nc-dec-e7-sub-1329",
      "event_type": "hearing",
      "title": "Expert witness hearing",
      "start_date": "2026-07-22",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "scheduled",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-nc-ncuc-discovery-e-7-sub-1329",
      "source_url": "https://starw1.ncuc.gov/NCUC/page/docket-docs/PSC/DocketDetails.aspx?DocketId=d316f3c5-2f78-4b6b-9a73-377eca83b980",
      "state": "NC",
      "utility_id": "utility-duke-energy-carolinas",
      "utility_name": "Duke Energy Carolinas",
      "docket_number": "E-7 SUB 1329"
    },
    {
      "id": "event-nc-ncuc-e-7-sub-1329-2026-07-28",
      "proceeding_id": "case-nc-dec-e7-sub-1329",
      "event_type": "hearing",
      "title": "Expert Witness Hearing: Application of Duke Energy Carolinas, LLC for Adjustment of Rates and Charges Applicable to Electric Service in North Carolina and Performance-Based Regulation",
      "start_date": "2026-07-28",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "scheduled",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": "event-nc-dec-e7-sub-1329-hearing",
      "citation_id": "citation-nc-ncuc-hearing-calendar-2026-07-24-e-7-sub-1329",
      "source_url": "https://www.ncuc.gov/hearings/hearings.html",
      "state": "NC",
      "utility_id": "utility-duke-energy-carolinas",
      "utility_name": "Duke Energy Carolinas",
      "docket_number": "E-7 SUB 1329"
    },
    {
      "id": "event-six-state-active-aes-evidentiary-hearing",
      "proceeding_id": "case-aes-ohio-25-958-el-air",
      "event_type": "evidentiary_hearing",
      "title": "Evidentiary hearing",
      "start_date": "2026-08-04",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "scheduled",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-six-state-active-aes",
      "source_url": "https://dis.puc.state.oh.us/ViewImage.aspx?CMID=A1001001A25K10B31539F00132",
      "state": "OH",
      "utility_id": "utility-aes-ohio",
      "utility_name": "AES Ohio",
      "docket_number": "25-958-EL-AIR"
    },
    {
      "id": "event-peoples-evidentiary-hearing",
      "proceeding_id": "case-pa-puc-r-2026-3060855",
      "event_type": "hearing",
      "title": "Evidentiary hearings",
      "start_date": "2026-08-05",
      "end_date": "2026-08-07",
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "scheduled",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-peoples-hearing",
      "source_url": "https://www.puc.pa.gov/pcdocs/1927670.pdf",
      "state": "PA",
      "utility_id": "utility-peoples-natural-gas",
      "utility_name": "Peoples Natural Gas",
      "docket_number": "R-2026-3060855"
    },
    {
      "id": "event-nc-dep-e2-sub-1380-hearing",
      "proceeding_id": "case-nc-dep-e2-sub-1380",
      "event_type": "hearing",
      "title": "Expert witness hearing",
      "start_date": "2026-08-11",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "scheduled",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-nc-ncuc-discovery-e-2-sub-1380",
      "source_url": "https://starw1.ncuc.gov/NCUC/page/docket-docs/PSC/DocketDetails.aspx?DocketId=3e964fde-0a73-4c6d-a701-87d81e830304",
      "state": "NC",
      "utility_id": "utility-duke-energy-progress",
      "utility_name": "Duke Energy Progress",
      "docket_number": "E-2 SUB 1380"
    },
    {
      "id": "event-ugi-electric-evidentiary-hearing",
      "proceeding_id": "case-pa-puc-r-2025-3059430",
      "event_type": "hearing",
      "title": "Evidentiary hearings",
      "start_date": "2026-08-12",
      "end_date": "2026-08-14",
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "scheduled",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-ugi-electric-hearing",
      "source_url": "https://www.puc.pa.gov/pcdocs/1938904.pdf",
      "state": "PA",
      "utility_id": "utility-ugi-electric",
      "utility_name": "UGI Electric",
      "docket_number": "R-2025-3059430"
    },
    {
      "id": "event-il-26-0331-suspension-end",
      "proceeding_id": "case-il-midamerican-26-0331",
      "event_type": "suspension_expires",
      "title": "Tariff suspension period ends",
      "start_date": "2026-08-16",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "statutory_deadline",
      "status": "scheduled",
      "condition_text": "This is a suspension deadline, not a guaranteed decision date.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-il-icc-discovery-26-0331",
      "source_url": "https://www.icc.illinois.gov/docket/P2026-0331",
      "state": "IL",
      "utility_id": "utility-midamerican-illinois",
      "utility_name": "MidAmerican Energy — Illinois",
      "docket_number": "26-0331"
    },
    {
      "id": "event-il-26-0332-suspension-end",
      "proceeding_id": "case-il-midamerican-26-0332",
      "event_type": "suspension_expires",
      "title": "Tariff suspension period ends",
      "start_date": "2026-08-16",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "statutory_deadline",
      "status": "scheduled",
      "condition_text": "This is a suspension deadline, not a guaranteed decision date.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-il-icc-discovery-26-0332",
      "source_url": "https://www.icc.illinois.gov/docket/P2026-0332",
      "state": "IL",
      "utility_id": "utility-midamerican-illinois",
      "utility_name": "MidAmerican Energy — Illinois",
      "docket_number": "26-0332"
    },
    {
      "id": "event-dte-gas-u21973-final-order-expected",
      "proceeding_id": "case-dte-gas-u-21973",
      "event_type": "commission_action",
      "title": "Final MPSC order expected",
      "start_date": "2026-09-01",
      "end_date": "2026-09-30",
      "date_precision": "month",
      "date_basis": "utility_guidance",
      "status": "conditional",
      "condition_text": "DTE's Form 10-Q states that a final MPSC order is expected in September 2026.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-dte-2026-q1-regulatory-update-page-27",
      "source_url": "https://www.sec.gov/Archives/edgar/data/936340/000093634026000081/dte-20260331.htm",
      "state": "MI",
      "utility_id": "utility-dte-gas",
      "utility_name": "DTE Gas",
      "docket_number": "U-21973"
    },
    {
      "id": "event-nc-denc-e22-sub-765-hearing-1",
      "proceeding_id": "case-nc-denc-e22-sub-765",
      "event_type": "hearing",
      "title": "Public witness hearing",
      "start_date": "2026-09-28",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "scheduled",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-nc-ncuc-discovery-e-22-sub-765",
      "source_url": "https://starw1.ncuc.gov/NCUC/page/docket-docs/PSC/DocketDetails.aspx?DocketId=0cbd3ac5-0feb-41da-8c6e-7bf3e7ddc3d2",
      "state": "NC",
      "utility_id": "utility-dominion-energy-north-carolina-electric",
      "utility_name": "Dominion Energy North Carolina",
      "docket_number": "E-22 SUB 765"
    },
    {
      "id": "event-duke-ohio-26-132-q4-hearings",
      "proceeding_id": "case-duke-energy-ohio-26-132-el-air",
      "event_type": "evidentiary_hearing",
      "title": "Evidentiary hearings anticipated",
      "start_date": "2026-10-01",
      "end_date": "2026-12-31",
      "date_precision": "quarter",
      "date_basis": "utility_guidance",
      "status": "conditional",
      "condition_text": "Duke Energy expects hearings during the fourth quarter of 2026; exact dates were not published in the reviewed source.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-duke-q1-2026-ohio-electric-rate-case",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1326160/000132616026000026/duk-20260331.htm",
      "state": "OH",
      "utility_id": "utility-duke-energy-ohio",
      "utility_name": "Duke Energy Ohio",
      "docket_number": "26-132-EL-AIR"
    },
    {
      "id": "event-ugi-gas-step-1-effective",
      "proceeding_id": "case-pa-puc-r-2025-3059523",
      "event_type": "rates_effective",
      "title": "Proposed settlement step 1 effective",
      "start_date": "2026-10-01",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "proposed_settlement",
      "status": "conditional",
      "condition_text": "October 1, 2026, or one day's notice after the Commission order, whichever is later; Commission approval required.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-ugi-gas-settlement-terms",
      "source_url": "https://www.puc.pa.gov/pcdocs/1938705.pdf",
      "state": "PA",
      "utility_id": "utility-ugi-gas",
      "utility_name": "UGI Gas",
      "docket_number": "R-2025-3059523"
    },
    {
      "id": "event-columbia-gas-virginia-2026-proposed-rate-step-1",
      "proceeding_id": "case-columbia-gas-virginia-pur-2026-00014",
      "event_type": "proposed_effective",
      "title": "Utility-proposed first rate step",
      "start_date": "2026-10-04",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "utility_guidance",
      "status": "conditional",
      "condition_text": "Requested implementation date only; the Commission suspended the rates and separately permitted interim rates from October 11.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-columbia-gas-virginia-2026-order-filing",
      "source_url": "https://www.scc.virginia.gov/docketsearch/DOCS/8d0901%21.PDF",
      "state": "VA",
      "utility_id": "utility-columbia-gas-virginia",
      "utility_name": "Columbia Gas of Virginia",
      "docket_number": "PUR-2026-00014"
    },
    {
      "id": "event-nc-denc-e22-sub-765-hearing-2",
      "proceeding_id": "case-nc-denc-e22-sub-765",
      "event_type": "hearing",
      "title": "Public witness hearing",
      "start_date": "2026-10-05",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "scheduled",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-nc-ncuc-discovery-e-22-sub-765",
      "source_url": "https://starw1.ncuc.gov/NCUC/page/docket-docs/PSC/DocketDetails.aspx?DocketId=0cbd3ac5-0feb-41da-8c6e-7bf3e7ddc3d2",
      "state": "NC",
      "utility_id": "utility-dominion-energy-north-carolina-electric",
      "utility_name": "Dominion Energy North Carolina",
      "docket_number": "E-22 SUB 765"
    },
    {
      "id": "event-columbia-gas-virginia-2026-interim-rate-authority",
      "proceeding_id": "case-columbia-gas-virginia-pur-2026-00014",
      "event_type": "rates_effective",
      "title": "Earliest interim-rate authority",
      "start_date": "2026-10-11",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "conditional",
      "condition_text": "The Commission permits, but does not require, proposed rates and tariff revisions on an interim, subject-to-refund basis.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-columbia-gas-virginia-2026-order-interim-rates",
      "source_url": "https://www.scc.virginia.gov/docketsearch/DOCS/8d0901%21.PDF",
      "state": "VA",
      "utility_id": "utility-columbia-gas-virginia",
      "utility_name": "Columbia Gas of Virginia",
      "docket_number": "PUR-2026-00014"
    },
    {
      "id": "event-nc-denc-e22-sub-765-hearing-3",
      "proceeding_id": "case-nc-denc-e22-sub-765",
      "event_type": "hearing",
      "title": "Public witness hearing",
      "start_date": "2026-10-13",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "scheduled",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-nc-ncuc-discovery-e-22-sub-765",
      "source_url": "https://starw1.ncuc.gov/NCUC/page/docket-docs/PSC/DocketDetails.aspx?DocketId=0cbd3ac5-0feb-41da-8c6e-7bf3e7ddc3d2",
      "state": "NC",
      "utility_id": "utility-dominion-energy-north-carolina-electric",
      "utility_name": "Dominion Energy North Carolina",
      "docket_number": "E-22 SUB 765"
    },
    {
      "id": "event-nc-denc-e22-sub-765-hearing-4",
      "proceeding_id": "case-nc-denc-e22-sub-765",
      "event_type": "hearing",
      "title": "Public witness hearing",
      "start_date": "2026-10-14",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "scheduled",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-nc-ncuc-discovery-e-22-sub-765",
      "source_url": "https://starw1.ncuc.gov/NCUC/page/docket-docs/PSC/DocketDetails.aspx?DocketId=0cbd3ac5-0feb-41da-8c6e-7bf3e7ddc3d2",
      "state": "NC",
      "utility_id": "utility-dominion-energy-north-carolina-electric",
      "utility_name": "Dominion Energy North Carolina",
      "docket_number": "E-22 SUB 765"
    },
    {
      "id": "event-appalachian-power-2026-public-witness-hearing",
      "proceeding_id": "case-appalachian-power-pur-2026-00044",
      "event_type": "public_input_hearing",
      "title": "Public-witness hearing",
      "start_date": "2026-10-19",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "scheduled",
      "condition_text": "Telephonic public-witness hearing scheduled for 10:00 a.m. Eastern Time.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-appalachian-power-2026-order-hearing",
      "source_url": "https://www.scc.virginia.gov/docketsearch/DOCS/8d1401%21.PDF",
      "state": "VA",
      "utility_id": "utility-appalachian-power-va",
      "utility_name": "Appalachian Power",
      "docket_number": "PUR-2026-00044"
    },
    {
      "id": "event-appalachian-power-2026-evidentiary-hearing",
      "proceeding_id": "case-appalachian-power-pur-2026-00044",
      "event_type": "evidentiary_hearing",
      "title": "Evidentiary hearing",
      "start_date": "2026-10-20",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "scheduled",
      "condition_text": "Public evidentiary hearing scheduled for 10:00 a.m. Eastern Time.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-appalachian-power-2026-order-hearing",
      "source_url": "https://www.scc.virginia.gov/docketsearch/DOCS/8d1401%21.PDF",
      "state": "VA",
      "utility_id": "utility-appalachian-power-va",
      "utility_name": "Appalachian Power",
      "docket_number": "PUR-2026-00044"
    },
    {
      "id": "event-nfg-suspension-expires",
      "proceeding_id": "case-pa-puc-r-2025-3059428",
      "event_type": "suspension_expires",
      "title": "Suspension expires — not a scheduled decision",
      "start_date": "2026-10-29",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "statutory_deadline",
      "status": "scheduled",
      "condition_text": "The Commission may act sooner; no decision date has been scheduled.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-nfg-suspension",
      "source_url": "https://www.puc.pa.gov/pcdocs/1915718.pdf",
      "state": "PA",
      "utility_id": "utility-national-fuel-gas-pa",
      "utility_name": "National Fuel Gas",
      "docket_number": "R-2025-3059428"
    },
    {
      "id": "event-ugi-gas-suspension-expires",
      "proceeding_id": "case-pa-puc-r-2025-3059523",
      "event_type": "suspension_expires",
      "title": "Suspension expires — not a scheduled decision",
      "start_date": "2026-10-29",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "statutory_deadline",
      "status": "scheduled",
      "condition_text": null,
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-ugi-gas-suspension",
      "source_url": "https://www.puc.pa.gov/pcdocs/1916059.pdf",
      "state": "PA",
      "utility_id": "utility-ugi-gas",
      "utility_name": "UGI Gas",
      "docket_number": "R-2025-3059523"
    },
    {
      "id": "event-il-26-0007-suspension-end",
      "proceeding_id": "case-il-mt-carmel-26-0007",
      "event_type": "suspension_expires",
      "title": "Tariff suspension period ends",
      "start_date": "2026-11-17",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "statutory_deadline",
      "status": "scheduled",
      "condition_text": "This is a suspension deadline, not a guaranteed decision date.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-il-icc-discovery-26-0007",
      "source_url": "https://www.icc.illinois.gov/docket/P2026-0007",
      "state": "IL",
      "utility_id": "utility-mt-carmel",
      "utility_name": "Mt. Carmel Public Utility",
      "docket_number": "26-0007"
    },
    {
      "id": "event-case-az-aps-e-01345a-25-0105-next",
      "proceeding_id": "case-az-aps-e-01345a-25-0105",
      "event_type": "recommended_decision",
      "title": "Recommended opinion and order expected",
      "start_date": "2026-11-30",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "scheduled",
      "condition_text": "Expected timing stated by the Commission; not a guaranteed issuance date.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-az-discovery-e-01345a-25-0105",
      "source_url": "https://www.azcc.gov/news/home/2026/02/19/what-s-next-in-the-aps-rate-case",
      "state": "AZ",
      "utility_id": "utility-aps",
      "utility_name": "Arizona Public Service",
      "docket_number": "E-01345A-25-0105"
    },
    {
      "id": "event-il-26-0065-suspension-end",
      "proceeding_id": "case-il-peoples-gas-26-0065",
      "event_type": "suspension_expires",
      "title": "Tariff suspension period ends",
      "start_date": "2026-12-03",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "statutory_deadline",
      "status": "scheduled",
      "condition_text": "This is a suspension deadline, not a guaranteed decision date.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-il-icc-discovery-26-0065",
      "source_url": "https://www.icc.illinois.gov/docket/P2026-0065",
      "state": "IL",
      "utility_id": "utility-peoples-gas-il",
      "utility_name": "Peoples Gas",
      "docket_number": "26-0065"
    },
    {
      "id": "event-il-26-0066-suspension-end",
      "proceeding_id": "case-il-north-shore-26-0066",
      "event_type": "suspension_expires",
      "title": "Tariff suspension period ends",
      "start_date": "2026-12-03",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "statutory_deadline",
      "status": "scheduled",
      "condition_text": "This is a suspension deadline, not a guaranteed decision date.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-il-icc-discovery-26-0066",
      "source_url": "https://www.icc.illinois.gov/docket/P2026-0066",
      "state": "IL",
      "utility_id": "utility-north-shore-gas",
      "utility_name": "North Shore Gas",
      "docket_number": "26-0066"
    },
    {
      "id": "event-il-26-0099-suspension-end",
      "proceeding_id": "case-il-nicor-26-0099",
      "event_type": "suspension_expires",
      "title": "Tariff suspension period ends",
      "start_date": "2026-12-07",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "statutory_deadline",
      "status": "scheduled",
      "condition_text": "This is a suspension deadline, not a guaranteed decision date.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-il-icc-discovery-26-0099",
      "source_url": "https://www.icc.illinois.gov/docket/P2026-0099",
      "state": "IL",
      "utility_id": "utility-nicor-gas",
      "utility_name": "Nicor Gas",
      "docket_number": "26-0099"
    },
    {
      "id": "event-columbia-gas-virginia-2026-evidentiary-hearing",
      "proceeding_id": "case-columbia-gas-virginia-pur-2026-00014",
      "event_type": "evidentiary_hearing",
      "title": "Evidentiary hearing",
      "start_date": "2026-12-15",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "scheduled",
      "condition_text": "Convened at the conclusion of the public-witness hearing, whichever is later.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-columbia-gas-virginia-2026-order-hearing",
      "source_url": "https://www.scc.virginia.gov/docketsearch/DOCS/8d0901%21.PDF",
      "state": "VA",
      "utility_id": "utility-columbia-gas-virginia",
      "utility_name": "Columbia Gas of Virginia",
      "docket_number": "PUR-2026-00014"
    },
    {
      "id": "event-columbia-gas-virginia-2026-public-witness-hearing",
      "proceeding_id": "case-columbia-gas-virginia-pur-2026-00014",
      "event_type": "public_input_hearing",
      "title": "Public-witness hearing",
      "start_date": "2026-12-15",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "scheduled",
      "condition_text": "Telephonic public-witness hearing scheduled for 10:00 a.m. Eastern Time.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-columbia-gas-virginia-2026-order-hearing",
      "source_url": "https://www.scc.virginia.gov/docketsearch/DOCS/8d0901%21.PDF",
      "state": "VA",
      "utility_id": "utility-columbia-gas-virginia",
      "utility_name": "Columbia Gas of Virginia",
      "docket_number": "PUR-2026-00014"
    },
    {
      "id": "event-peoples-suspension-expires",
      "proceeding_id": "case-pa-puc-r-2026-3060855",
      "event_type": "suspension_expires",
      "title": "Suspension expires — not a scheduled decision",
      "start_date": "2026-12-26",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "statutory_deadline",
      "status": "scheduled",
      "condition_text": "The Commission may act sooner; this is not an official decision date.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-peoples-suspension",
      "source_url": "https://www.puc.pa.gov/pcdocs/1926050.pdf",
      "state": "PA",
      "utility_id": "utility-peoples-natural-gas",
      "utility_name": "Peoples Natural Gas",
      "docket_number": "R-2026-3060855"
    },
    {
      "id": "event-action-va-dominion-gs5-action",
      "proceeding_id": "case-va-scc-pur-2025-00058",
      "event_type": "rates_effective",
      "title": "Dominion Energy Virginia GS-5 rate class",
      "start_date": "2027-01-01",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "completed",
      "condition_text": "The SCC approved a separate rate class for Dominion's largest customers, pairing minimum monthly charges and long service obligations with conditional collateral intended to reduce cost shifting.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-market-va-scc-gs5-release",
      "source_url": "https://www.scc.virginia.gov/about-the-scc/newsreleases/release/scc-issues-order-on-dev-biennial-review-2025/scc-rules-in-dev-biennial-review-case.html",
      "state": "VA",
      "utility_id": "utility-dominion-energy-virginia",
      "utility_name": "Dominion Energy Virginia",
      "docket_number": "PUR-2025-00058"
    },
    {
      "id": "event-semco-u22002-proposed-effective",
      "proceeding_id": "case-semco-energy-gas-u-22002",
      "event_type": "proposed_effective",
      "title": "Earliest proposed effective date for new rates",
      "start_date": "2027-01-01",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "utility_guidance",
      "status": "conditional",
      "condition_text": "SEMCO states that new rates would be effective no earlier than January 1, 2027; Commission authorization is still required.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-semco-u22002-summary-page-4",
      "source_url": "https://openmpsc.com/files/26/a00cs00001XkOjlAAF.pdf",
      "state": "MI",
      "utility_id": "utility-semco-energy-gas",
      "utility_name": "SEMCO Energy Gas",
      "docket_number": "U-22002"
    },
    {
      "id": "event-ugi-electric-suspension-expires",
      "proceeding_id": "case-pa-puc-r-2025-3059430",
      "event_type": "suspension_expires",
      "title": "Suspension expires — not a scheduled decision",
      "start_date": "2027-01-01",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "statutory_deadline",
      "status": "scheduled",
      "condition_text": "The Commission may act sooner; no decision date is inferred.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-ugi-electric-suspension",
      "source_url": "https://www.puc.pa.gov/pcdocs/1927478.pdf",
      "state": "PA",
      "utility_id": "utility-ugi-electric",
      "utility_name": "UGI Electric",
      "docket_number": "R-2025-3059430"
    },
    {
      "id": "event-appalachian-power-2026-final-order-backstop",
      "proceeding_id": "case-appalachian-power-pur-2026-00044",
      "event_type": "other_material_event",
      "title": "Statutory final-order deadline",
      "start_date": "2027-01-15",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "statutory_deadline",
      "status": "scheduled",
      "condition_text": "Statutory backstop, not a Commission-scheduled decision date.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-appalachian-power-2026-order-filing",
      "source_url": "https://www.scc.virginia.gov/docketsearch/DOCS/8d1401%21.PDF",
      "state": "VA",
      "utility_id": "utility-appalachian-power-va",
      "utility_name": "Appalachian Power",
      "docket_number": "PUR-2026-00044"
    },
    {
      "id": "event-wellsboro-rates-effective-step-2",
      "proceeding_id": "case-pa-puc-r-2025-3054392",
      "event_type": "rates_effective",
      "title": "Second authorized rate step effective",
      "start_date": "2027-01-29",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "official_commission",
      "status": "scheduled",
      "condition_text": "Second phase of the Commission-approved settlement",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-wellsboro-2026-outcome",
      "source_url": "https://www.puc.pa.gov/pcdocs/1910304.pdf",
      "state": "PA",
      "utility_id": "utility-wellsboro-electric",
      "utility_name": "Wellsboro Electric",
      "docket_number": "R-2025-3054392"
    },
    {
      "id": "event-dte-electric-u22046-final-order-expected",
      "proceeding_id": "case-dte-electric-u-22046",
      "event_type": "commission_action",
      "title": "Final MPSC order expected",
      "start_date": "2027-02-01",
      "end_date": "2027-02-28",
      "date_precision": "month",
      "date_basis": "utility_guidance",
      "status": "conditional",
      "condition_text": "DTE's Form 10-Q states that a final MPSC order is expected in February 2027.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-dte-2026-q1-regulatory-update-page-27",
      "source_url": "https://www.sec.gov/Archives/edgar/data/936340/000093634026000081/dte-20260331.htm",
      "state": "MI",
      "utility_id": "utility-dte-electric",
      "utility_name": "DTE Electric",
      "docket_number": "U-22046"
    },
    {
      "id": "event-appalachian-power-2026-earliest-effective",
      "proceeding_id": "case-appalachian-power-pur-2026-00044",
      "event_type": "rates_effective",
      "title": "Earliest possible effective date for any revised rates",
      "start_date": "2027-03-01",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "statutory_deadline",
      "status": "conditional",
      "condition_text": "Only if the Commission orders revisions; the statute provides that any revisions may take effect no earlier than March 1, 2027.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-appalachian-power-2026-order-filing",
      "source_url": "https://www.scc.virginia.gov/docketsearch/DOCS/8d1401%21.PDF",
      "state": "VA",
      "utility_id": "utility-appalachian-power-va",
      "utility_name": "Appalachian Power",
      "docket_number": "PUR-2026-00044"
    },
    {
      "id": "event-uppco-u22032-statutory-window",
      "proceeding_id": "case-uppco-u-22032",
      "event_type": "commission_action",
      "title": "New rates expected by statutory window",
      "start_date": "2027-03-22",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "statutory_deadline",
      "status": "conditional",
      "condition_text": "UPPCO stated that a May 22, 2026 filing would allow new rates to be effective no later than March 22, 2027; Commission action may occur earlier.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-uppco-u22032-summary-page-4",
      "source_url": "https://mi-psc.my.site.com/sfc/servlet.shepherd/version/download/068cs0000222MgoAAE",
      "state": "MI",
      "utility_id": "utility-uppco",
      "utility_name": "UPPCO",
      "docket_number": "U-22032"
    },
    {
      "id": "event-duke-ohio-26-132-may-2027-decision",
      "proceeding_id": "case-duke-energy-ohio-26-132-el-air",
      "event_type": "commission_action",
      "title": "Final decision expected",
      "start_date": "2027-05-01",
      "end_date": "2027-05-31",
      "date_precision": "month",
      "date_basis": "utility_guidance",
      "status": "conditional",
      "condition_text": "Duke Energy expects a final decision in May 2027; this is company guidance, not a scheduled commission action date.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "citation-duke-q1-2026-ohio-electric-rate-case",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1326160/000132616026000026/duk-20260331.htm",
      "state": "OH",
      "utility_id": "utility-duke-energy-ohio",
      "utility_name": "Duke Energy Ohio",
      "docket_number": "26-132-EL-AIR"
    },
    {
      "id": "event-ugi-gas-step-2-effective",
      "proceeding_id": "case-pa-puc-r-2025-3059523",
      "event_type": "rates_effective",
      "title": "Proposed settlement step 2 effective",
      "start_date": "2027-10-01",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "proposed_settlement",
      "status": "conditional",
      "condition_text": "Commission approval of the proposed settlement is required.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-ugi-gas-settlement-terms",
      "source_url": "https://www.puc.pa.gov/pcdocs/1938705.pdf",
      "state": "PA",
      "utility_id": "utility-ugi-gas",
      "utility_name": "UGI Gas",
      "docket_number": "R-2025-3059523"
    },
    {
      "id": "event-columbia-gas-virginia-2027-proposed-rate-step-2",
      "proceeding_id": "case-columbia-gas-virginia-pur-2026-00014",
      "event_type": "proposed_effective",
      "title": "Utility-proposed second rate step",
      "start_date": "2027-10-04",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "utility_guidance",
      "status": "conditional",
      "condition_text": "Requested second rate step only; no Commission authorization is recorded.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-columbia-gas-virginia-2026-order-filing",
      "source_url": "https://www.scc.virginia.gov/docketsearch/DOCS/8d0901%21.PDF",
      "state": "VA",
      "utility_id": "utility-columbia-gas-virginia",
      "utility_name": "Columbia Gas of Virginia",
      "docket_number": "PUR-2026-00014"
    },
    {
      "id": "event-ugi-gas-earliest-next-rate-case-filing",
      "proceeding_id": "case-pa-puc-r-2025-3059523",
      "event_type": "anticipated_filing",
      "title": "Earliest next general rate case filing under proposed stay-out",
      "start_date": "2029-01-16",
      "end_date": null,
      "date_precision": "exact_day",
      "date_basis": "proposed_settlement",
      "status": "conditional",
      "condition_text": "Settlement approval required; exceptions apply for Commission orders or fundamental regulatory-policy, legislative, or tax changes.",
      "is_material": true,
      "supersedes_event_id": null,
      "citation_id": "source-ugi-gas-2026-settlement-stayout",
      "source_url": "https://www.puc.pa.gov/pcdocs/1938705.pdf",
      "state": "PA",
      "utility_id": "utility-ugi-gas",
      "utility_name": "UGI Gas",
      "docket_number": "R-2025-3059523"
    }
  ]
}